惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Attack and Defense Labs
Attack and Defense Labs
宝玉的分享
宝玉的分享
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
D
Darknet – Hacking Tools, Hacker News & Cyber Security
V
Vulnerabilities – Threatpost
博客园_首页
Engineering at Meta
Engineering at Meta
F
Fortinet All Blogs
C
Cyber Attacks, Cyber Crime and Cyber Security
罗磊的独立博客
V
Visual Studio Blog
Know Your Adversary
Know Your Adversary
Hacker News - Newest:
Hacker News - Newest: "LLM"
美团技术团队
L
LINUX DO - 最新话题
The Last Watchdog
The Last Watchdog
博客园 - 三生石上(FineUI控件)
T
Tor Project blog
云风的 BLOG
云风的 BLOG
N
Netflix TechBlog - Medium
MyScale Blog
MyScale Blog
The GitHub Blog
The GitHub Blog
有赞技术团队
有赞技术团队
I
InfoQ
Last Week in AI
Last Week in AI
V2EX - 技术
V2EX - 技术
量子位
S
Secure Thoughts
L
LangChain Blog
The Hacker News
The Hacker News
H
Help Net Security
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
小众软件
小众软件
K
Kaspersky official blog
Security Archives - TechRepublic
Security Archives - TechRepublic
Google Online Security Blog
Google Online Security Blog
I
Intezer
Vercel News
Vercel News
Hacker News: Ask HN
Hacker News: Ask HN
Cisco Talos Blog
Cisco Talos Blog
Google DeepMind News
Google DeepMind News
S
Securelist
阮一峰的网络日志
阮一峰的网络日志
G
Google Developers Blog
Help Net Security
Help Net Security
Martin Fowler
Martin Fowler
爱范儿
爱范儿
Y
Y Combinator Blog
C
Check Point Blog

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Sanford Dam Auxiliary Spillway Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Froedtert Hospital Blue Parking Structure McLean Boulevard REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
Project Heat
nickbrimley · 2026-04-01 · via SCA

Location: Chicago, Illinois

Award: High Performance

Project Team

Owner: Logistics Property Company, LLC

Contractor: Walsh Construction

Architect: Ware Malcomb.

Engineer: DCI Engineers

Concrete: Prairie Materials

Slag Cement: St Marys Cement

Located in Chicago’s North Branch Industrial Corridor, Project Heat is a true architectural pioneer. As the first modern multi-level industrial warehouse in the Midwest, it brings a design typically seen in high-density global hubs like Singapore or Tokyo right to the heart of the Windy City. This 1.2 million square foot facility uses a stacked, two-story design to allow 53 foot long semi-trucks access to both floors, maximizing space on a compact 11-acre footprint near the Kennedy Expressway.

To bring this massive "spec" project to life, the team placed over 73,000 cubic yards of concrete across a wide variety of applications, from post-tensioned truck docks to slabs on metal decks. Slag cement was the supplementary material of choice for the stakeholders and investors, providing the high-performance durability and low permeability required for such a heavy-duty logistical hub.

The logistical benefits of slag cement were proven throughout the year-round construction cycle. Even during the challenging Chicago winter, the post-tensioned deck mixes consistently met the early strength requirements needed to keep the project on schedule. The long-term results were equally impressive: while the design called for 8,750 psi, the slag-integrated mixes consistently exceeded 9,500 psi.

Beyond its structural muscle, slag cement offered significant architectural and environmental advantages. Its signature lighter color provided a beautiful contrast to the building’s painted features, while its use alongside CarbonCure technology and high-strength reinforcement minimized the project’s overall carbon footprint. Already a winner of multiple industry impact awards, Project Heat stands as a landmark of sustainable, vertical innovation in American industrial construction.

Application Type

Application Type

Post-Tensioned Deck Mix (mix 8750)

Various other mixes – slab on ground, slab on metal deck, sidewalks, footers, etc. County Materials also provided pre-cast walls (not included below)

% Slag Cement Replacement

12.5% slag (25% SCM total)

~0 to 25% SCM 

% Portland Cement

% Portland Limestone Cement

75% St Marys Charlevoix PLC

~75-85% typ. Minimal 100% PLC

% Other SCM (if applicable)

12.5% Oak Creek Class C Fly Ash

Carbon Cure

Class C Ash, Silica Fume, Carbon Cure

Lightweight slab on metal deck: 14% slag & 4% silica fume, 0.38 w/c.

Aggregate

CM11 Limestone, FM20 Sand

Water/cement ratio

0.27

0.27-0.45

7-day strengths

3000 psi required @ 24 hr

Varied

28-day strengths

8750 @ 56 day

Varied