惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

V
V2EX
宝玉的分享
宝玉的分享
Jina AI
Jina AI
IT之家
IT之家
博客园 - Franky
MyScale Blog
MyScale Blog
Y
Y Combinator Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
I
InfoQ
雷峰网
雷峰网
WordPress大学
WordPress大学
Microsoft Security Blog
Microsoft Security Blog
Google DeepMind News
Google DeepMind News
美团技术团队
S
SegmentFault 最新的问题
罗磊的独立博客
博客园 - 聂微东
大猫的无限游戏
大猫的无限游戏
H
Help Net Security
D
Docker
博客园 - 司徒正美
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
阮一峰的网络日志
阮一峰的网络日志
M
MIT News - Artificial intelligence

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Sanford Dam Auxiliary Spillway Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Project Heat McLean Boulevard REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
Froedtert Hospital Blue Parking Structure
nickbrimley · 2026-04-01 · via SCA

Location: Milwaukee, Wisconsin

Award: High Performance

Project Team

Owner: Froedtert Hospital

Contractor: CG Schmidt

Architect: EUA – Milwaukee

Engineer: Graef

Concrete: Riv/Crete Ready Mix

Slag Cement: St Marys Cement

 Located in Milwaukee, Wisconsin, the Froedtert Hospital Blue Parking Structure is a five-story facility providing 2,400 parking spaces designed to enhance the experience for patients, visitors, and staff. This thoughtful design includes a climate-controlled pedestrian bridge, accessible parking near elevators, and critical safety and sustainability features.

For a massive post-tensioned structure like this, the construction schedule lived and died by early strength gain. The team utilized a slag cement replacement rate that was specifically optimized to hit 3,000 psi in just 20 hours. This allowed for a rapid and consistent post-tensioning sequence, ensuring the project stayed on track while still comfortably exceeding the 28-day requirement of 6,000 psi.

Slag cement was the clear choice over other supplementary materials because of its remarkable consistency. Even with a complex chemical cocktail of admixtures, including corrosion inhibitors and viscosity modifiers, the slag-based mix remained stable and predictable. This reliability was crucial for the team as they used maturity meters to time their post-tensioning across variable weather conditions over the multi-year build.

The thixotropic properties of the slag mix also improved pumpability, which was essential for a project that occasionally required multiple pump stages to reach the upper levels. By reducing permeability and ensuring consistent air entrainment, slag cement has provided the foundation for a structure designed with a 75-year service life. The Froedtert Blue Parking structure stands as a premier example of how slag cement delivers the precision and durability required for high-stakes healthcare infrastructure.

Application Type

Application Type

Slab mix

Exterior Columns & Shear Walls

% Slag Cement Replacement

15

10

% Portland Cement

% Portland Limestone Cement

85

80

% Other SCM (if applicable)

Carbon Cure; VMA, CI, Super, Mid-Range, AE, Hyd. Stab.

Fly Ash (10)

Aggregate

Combined Aggregate: ¾ gravel, 3/8 pea stone & sand; for pumpability & workability

Combined Aggregate: ¾ gravel, 3/8 pea stone & sand; for pumpability

Water/cement ratio

0.38 typ (max 0.4 per ACI F3)

0.40

7-day strengths

5700 psi, 3000 psi @ 20hr for PT

5200 psi

28-day strengths

6000 psi required, 7300 psi typical

5000 psi required, 6500 typical