惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

人人都是产品经理
人人都是产品经理
Stack Overflow Blog
Stack Overflow Blog
S
SegmentFault 最新的问题
博客园 - 司徒正美
aimingoo的专栏
aimingoo的专栏
U
Unit 42
GbyAI
GbyAI
B
Blog RSS Feed
博客园 - Franky
L
LangChain Blog
Hugging Face - Blog
Hugging Face - Blog
美团技术团队
The GitHub Blog
The GitHub Blog
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
H
Hackread – Cybersecurity News, Data Breaches, AI and More
博客园 - 三生石上(FineUI控件)
Microsoft Azure Blog
Microsoft Azure Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
G
Google Developers Blog
Last Week in AI
Last Week in AI
阮一峰的网络日志
阮一峰的网络日志
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
Apple Machine Learning Research
Apple Machine Learning Research

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Sanford Dam Auxiliary Spillway Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Project Heat Froedtert Hospital Blue Parking Structure REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
McLean Boulevard
nickbrimley · 2026-04-01 · via SCA

Location: Elgin, Illinois

Award: Infrastructure

Project Team

Owner: Illinois DOT

Contractor: Plote Construction Inc

Concrete: Elmhurst Chicago Stone

Slag Cement: Skyway Cement Company

Located in Elgin, Illinois, the McLean Boulevard project is a major infrastructure upgrade designed to transform a two-lane road into a safer, more efficient four-lane corridor. This project didn't just add lanes; it introduced a landscaped median to reduce traffic conflict points and a ten-foot wide shared-use path that connects local residents to the regional trail system.

To keep this high-traffic corridor moving during construction, the team utilized a specialized slag cement mix for everything from low-slump mainline paving and machine-formed curbs to sidewalks and driveways. Slag cement was specifically selected for its superior workability at low slumps, providing a consistent mix that allowed the crew to execute three back-to-back pours exceeding 1,100 cubic yards each.

One of the most impressive results of using slag cement on this project was the accelerated timeline. While the design requirement called for 3,500 psi at 14 days, the slag-enhanced mix met or exceeded that strength in a fraction of the time. This early-age strength gain allowed the team to open the pavement to traffic in just two to three days.

By choosing slag cement, the McLean Boulevard project achieved a rare trifecta: high-volume consistency, rapid strength gain for early access, and a durable finish that will serve the community for decades to come.

Application Type

Application Type

% Slag Cement Replacement

25% (145 pounds)

% Portland Cement

% Portland Limestone Cement

75% (435 pounds)

% Other SCM (if applicable)

Aggregate

Limestone – 1807 pounds, Torpedo Sand – 1268 pounds 

Water/cement ratio

0.42 max

7-day strengths

4780 psi average

28-day strengths