惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Martin Fowler
Martin Fowler
Microsoft Security Blog
Microsoft Security Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Vercel News
Vercel News
Y
Y Combinator Blog
D
DataBreaches.Net
IT之家
IT之家
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
博客园_首页
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
H
Hackread – Cybersecurity News, Data Breaches, AI and More
WordPress大学
WordPress大学
H
Help Net Security
GbyAI
GbyAI
C
Check Point Blog
L
LangChain Blog
小众软件
小众软件
T
The Blog of Author Tim Ferriss
MyScale Blog
MyScale Blog
G
Google Developers Blog
月光博客
月光博客
V
V2EX
M
MIT News - Artificial intelligence
博客园 - 叶小钗

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Project Heat Froedtert Hospital Blue Parking Structure McLean Boulevard REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
Sanford Dam Auxiliary Spillway
nickbrimley · 2026-04-04 · via SCA

Location: Sanford, Michigan

Award: Innovative Applications

Project Team

Owner: Four Lakes Association

Concrete and Contractor: Fisher Contracting Company

Engineer: GEI Consultants

Slag Cement: St Marys Cement

Located in Sanford, Michigan, the Sanford Dam Auxiliary Spillway is a massive renovation project that utilized Roller Compacted Concrete to meet a demanding construction schedule. The 1,200-foot-long structure was built with a series of steps reaching 24 feet high, requiring the placement of approximately 18,000 cubic yards of concrete in a remarkably short six-week window.

To manage the logistics of such a rapid, large-scale placement, the engineering team turned to a high-performance slag cement mix. With a total cementitious content of 350 pounds per cubic yard, the design utilized a 60 percent slag replacement. This high slag ratio was a mechanical necessity for this mass concrete application, as it effectively lowered the heat of hydration to keep core and surface temperature differentials well within the project's strict specifications.

The inclusion of slag cement also ensured the mix met the required 24-hour initial set time, allowing for the unique speed and layering process inherent to roller compacted concrete. Even with a low total cementitious content, the slag-integrated system provided sufficient strength development to ensure a durable and resilient spillway.

By combining the efficiency of roller compacted concrete with the thermal control of slag cement, the Sanford Dam project was completed on time and to the highest engineering standards, proving that sustainability and high-speed construction can go hand in hand.

Application Type

Application Type

% Slag Cement Replacement

60%

% Portland Cement

% Portland Limestone Cement

40%

% Other SCM (if applicable)

Aggregate

100% crushed limestone

Water/cement ratio

0.52

7-day strengths

3200 PSI

28-day strengths

4500 PSI (3500 PSI F’c)