惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

T
Threatpost
aimingoo的专栏
aimingoo的专栏
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
T
Tailwind CSS Blog
J
Java Code Geeks
博客园_首页
Google Online Security Blog
Google Online Security Blog
Hugging Face - Blog
Hugging Face - Blog
C
CXSECURITY Database RSS Feed - CXSecurity.com
I
Intezer
P
Palo Alto Networks Blog
V
Vulnerabilities – Threatpost
雷峰网
雷峰网
O
OpenAI News
SecWiki News
SecWiki News
小众软件
小众软件
酷 壳 – CoolShell
酷 壳 – CoolShell
美团技术团队
N
News | PayPal Newsroom
Project Zero
Project Zero
Forbes - Security
Forbes - Security
IT之家
IT之家
A
Arctic Wolf
WordPress大学
WordPress大学
Jina AI
Jina AI
T
Tor Project blog
博客园 - 三生石上(FineUI控件)
S
Secure Thoughts
Google DeepMind News
Google DeepMind News
Attack and Defense Labs
Attack and Defense Labs
博客园 - 聂微东
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
P
Privacy International News Feed
Cloudbric
Cloudbric
G
GRAHAM CLULEY
博客园 - 叶小钗
H
Hacker News: Front Page
腾讯CDC
量子位
Help Net Security
Help Net Security
人人都是产品经理
人人都是产品经理
C
Cyber Attacks, Cyber Crime and Cyber Security
月光博客
月光博客
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
宝玉的分享
宝玉的分享
爱范儿
爱范儿
L
Lohrmann on Cybersecurity
Hacker News - Newest:
Hacker News - Newest: "LLM"
Recorded Future
Recorded Future
C
CERT Recently Published Vulnerability Notes

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Sanford Dam Auxiliary Spillway Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Froedtert Hospital Blue Parking Structure McLean Boulevard REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
Project Heat
nickbrimley · 2026-04-01 · via SCA

Location: Chicago, Illinois

Award: High Performance

Project Team

Owner: Logistics Property Company, LLC

Contractor: Walsh Construction

Architect: Ware Malcomb.

Engineer: DCI Engineers

Concrete: Prairie Materials

Slag Cement: St Marys Cement

Located in Chicago’s North Branch Industrial Corridor, Project Heat is a true architectural pioneer. As the first modern multi-level industrial warehouse in the Midwest, it brings a design typically seen in high-density global hubs like Singapore or Tokyo right to the heart of the Windy City. This 1.2 million square foot facility uses a stacked, two-story design to allow 53 foot long semi-trucks access to both floors, maximizing space on a compact 11-acre footprint near the Kennedy Expressway.

To bring this massive "spec" project to life, the team placed over 73,000 cubic yards of concrete across a wide variety of applications, from post-tensioned truck docks to slabs on metal decks. Slag cement was the supplementary material of choice for the stakeholders and investors, providing the high-performance durability and low permeability required for such a heavy-duty logistical hub.

The logistical benefits of slag cement were proven throughout the year-round construction cycle. Even during the challenging Chicago winter, the post-tensioned deck mixes consistently met the early strength requirements needed to keep the project on schedule. The long-term results were equally impressive: while the design called for 8,750 psi, the slag-integrated mixes consistently exceeded 9,500 psi.

Beyond its structural muscle, slag cement offered significant architectural and environmental advantages. Its signature lighter color provided a beautiful contrast to the building’s painted features, while its use alongside CarbonCure technology and high-strength reinforcement minimized the project’s overall carbon footprint. Already a winner of multiple industry impact awards, Project Heat stands as a landmark of sustainable, vertical innovation in American industrial construction.

Application Type

Application Type

Post-Tensioned Deck Mix (mix 8750)

Various other mixes – slab on ground, slab on metal deck, sidewalks, footers, etc. County Materials also provided pre-cast walls (not included below)

% Slag Cement Replacement

12.5% slag (25% SCM total)

~0 to 25% SCM 

% Portland Cement

% Portland Limestone Cement

75% St Marys Charlevoix PLC

~75-85% typ. Minimal 100% PLC

% Other SCM (if applicable)

12.5% Oak Creek Class C Fly Ash

Carbon Cure

Class C Ash, Silica Fume, Carbon Cure

Lightweight slab on metal deck: 14% slag & 4% silica fume, 0.38 w/c.

Aggregate

CM11 Limestone, FM20 Sand

Water/cement ratio

0.27

0.27-0.45

7-day strengths

3000 psi required @ 24 hr

Varied

28-day strengths

8750 @ 56 day

Varied