惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

MyScale Blog
MyScale Blog
Jina AI
Jina AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
阮一峰的网络日志
阮一峰的网络日志
P
Proofpoint News Feed
Last Week in AI
Last Week in AI
博客园 - 司徒正美
Martin Fowler
Martin Fowler
T
Tailwind CSS Blog
B
Blog RSS Feed
Vercel News
Vercel News
博客园 - 聂微东
I
InfoQ
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
M
MIT News - Artificial intelligence
Recent Announcements
Recent Announcements
GbyAI
GbyAI
L
LangChain Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
Microsoft Security Blog
Microsoft Security Blog
C
Check Point Blog
MongoDB | Blog
MongoDB | Blog
B
Blog

SCA

SLAG CEMENT ASSOCIATION ANNOUNCES RECORD-BREAKING SHIPMENTS IN 2025 SCA HOSTS 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DELAWARE SCA ANNOUNCES 2025 SLAG CEMENT IN SUSTAINABLE CONCRETE AWARD WINNERS Old Dominion Freight Facility Exterior Pavement Pasco Ready Mix – Spring Hill Concrete Production Facility Principio Meta AI-Designed Mix for Rosemount Data Center US 181 Harbor Bridge Replacement Project Rogue Wind Farm NYS Thruway Authority I-90 Rehab Project State Road 249 / Port of Indiana Bridge Replacement Aquilla J. Morgan High School Gensco Logistics Center Project Heat Froedtert Hospital Blue Parking Structure McLean Boulevard REGISTRATION OPENS FOR 2026 SLAG CEMENT SCHOOL IN WILMINGTON, DE THE SLAG CEMENT ASSOCIATION ANNOUNCES NEXT BOARD PRESIDENT SCA HOSTS 2025 SLAG CEMENT SCHOOL IN HOUSTON, TEXAS Crossroads North Building 11 The Seattle Storm Center for Basketball Performance
Sanford Dam Auxiliary Spillway
nickbrimley · 2026-04-04 · via SCA

Location: Sanford, Michigan

Award: Innovative Applications

Project Team

Owner: Four Lakes Association

Concrete and Contractor: Fisher Contracting Company

Engineer: GEI Consultants

Slag Cement: St Marys Cement

Located in Sanford, Michigan, the Sanford Dam Auxiliary Spillway is a massive renovation project that utilized Roller Compacted Concrete to meet a demanding construction schedule. The 1,200-foot-long structure was built with a series of steps reaching 24 feet high, requiring the placement of approximately 18,000 cubic yards of concrete in a remarkably short six-week window.

To manage the logistics of such a rapid, large-scale placement, the engineering team turned to a high-performance slag cement mix. With a total cementitious content of 350 pounds per cubic yard, the design utilized a 60 percent slag replacement. This high slag ratio was a mechanical necessity for this mass concrete application, as it effectively lowered the heat of hydration to keep core and surface temperature differentials well within the project's strict specifications.

The inclusion of slag cement also ensured the mix met the required 24-hour initial set time, allowing for the unique speed and layering process inherent to roller compacted concrete. Even with a low total cementitious content, the slag-integrated system provided sufficient strength development to ensure a durable and resilient spillway.

By combining the efficiency of roller compacted concrete with the thermal control of slag cement, the Sanford Dam project was completed on time and to the highest engineering standards, proving that sustainability and high-speed construction can go hand in hand.

Application Type

Application Type

% Slag Cement Replacement

60%

% Portland Cement

% Portland Limestone Cement

40%

% Other SCM (if applicable)

Aggregate

100% crushed limestone

Water/cement ratio

0.52

7-day strengths

3200 PSI

28-day strengths

4500 PSI (3500 PSI F’c)