惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
酷 壳 – CoolShell
酷 壳 – CoolShell
博客园_首页
Engineering at Meta
Engineering at Meta
量子位
A
About on SuperTechFans
阮一峰的网络日志
阮一峰的网络日志
Recent Announcements
Recent Announcements
博客园 - 司徒正美
V
Visual Studio Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
The GitHub Blog
The GitHub Blog
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
F
Fortinet All Blogs
Martin Fowler
Martin Fowler
腾讯CDC
Jina AI
Jina AI
C
Check Point Blog
H
Help Net Security
罗磊的独立博客
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
V
V2EX
爱范儿
爱范儿
I
InfoQ

Forbes - Innovation

Why Do Humans Have Fingerprints? Hint: It’s Not What You Think Booking.com Confirms Data Breach, Reservation PIN Codes Changed Why Major News Sites Are Blocking The Internet Archive’s Wayback Machine iPhone Fold Release Date: New Report Details Frustrating Apple News Comet Tracker: How To See Pan-STARRS And Three Planets On Wednesday NYT Mini Crossword Today: Tuesday, April 14 Hints And Answers Today’s NYT Strands Hints, Spangram, Answers: Tuesday, April 14 (It’s A Little Unclear) Today’s Wordle #1760 Hints And Answer For Tuesday, April 14 Most Of The Microplastics In Urban Air Come From Tires Today’s Wordle #1759 Hints And Answer For Monday, April 13 NYT Mini Crossword Today: Monday, April 13 Hints And Answers NYT Pips Today: Hints, Answers And Walkthrough For Monday, April 13 The YC Chief Who Codes 10,000 Lines A Day Has A Simple Secret Samsung Expands One UI 8.5 Beta To More Galaxy Owners Why You Should Stop Using Your iPhone If It’s On This List Chamath Says Firms That Treat AI As A Strategy Hand Rivals Their Edge 3 Unexpected Habits Of Secure Couples, By A Psychologist The First Lamp That Folds Your Clothes Samsung’s Disappointing Price Update For Galaxy Phone Buyers 3 Subtle Signs Someone Is Falling In Love With You, By A Psychologist Do Mantis Shrimp See More Colors Than Humans? A Biologist Explains NYT Connections Answers Explained For Monday, April 13 (#1,037) NYT Connections Hints Today: Monday, April 13 Clues And Answers (#1,037) LEGO Luigi & Mach 8 (72050) Review: 2026’s Best Set Yet? Marc Andreessen Says AI Productivity Will Trigger A Hiring Boom 3D Printing Is The Ultimate Hack To Reduce Household Spending Apple iPhone Fold: Striking Design Revealed In Leaked Photos Apple Smart Glasses: New Leak Reveals A Major Design Twist To Beat Meta Tested: The AI Coming To The Rivian R2 Quordle Hints Today: Monday, April 13 Clues And Answers
AI Data Center Build Out Faces Infrastructure And Politic...
Thomas Cough · 2026-05-20 · via Forbes - Innovation
Building Artificial Intelligence and Data Infrastructure

Aerial view of a data center being constructed.

getty

In the last year and a half there has been a huge build out in data centers to support the explosion in AI training and inference to support the widespread use of AI for industrial and consumer applications. This demand has caused the prices of critical components for computing memory and storage to surge and major memory and storage companies report that they have long term contracts with hyperscale data centers extending into 2028.

However, besides the shortage of components and rising prices there are limitations on the infrastructure to support these data center buildouts as well as growing resistance in many rural and suburban communities where data centers are slated to be built. These issues could slow the pace of AI data center construction and consequently demand for the components that go into these data centers.

Two important issues are availability of power and water to support running and cooling these data centers. The current plan for data center projects in the US would require 780GW of additional power by 2030. This is more than the country’s current peak load of 759GW. That level of expansion would be difficult to achieve.

Likewise, water consumption to cool these data centers is reported to grow significantly as well. U.S. data center direct water consumption is on track to double or quadruple 2023 levels annually. Additionally, about two-thirionds of US data centers built since 2022 are in high water-stress areas. Building more data centers in arid areas would put even greater stress on water resources for other urban uses as well as agriculture.

An additional factor in building new data centers is a growing concern by nearby residents about having data centers as a neighbor. About 70% of Americans polled oppose having data centers built in their communities, largely due to concerns over surging utility bills, excessive water and energy consumption as well as noise and air pollution.

MORE FOR YOU

However, the actual number of data center projects that may come online in that time may be only a fraction of the projections. The number of data centers that companies say they need on paper doesn’t necessarily account for the power generation, grid infrastructure, and capital required to build them. Brett Forster, VP of Renewables at McCarthy Building Companies, speaking at Latitude Media’s Transition-AI 2026 Conference in April said that only one in four data centers projects is considered real and likely to move forward.

In addition to the impact of infrastructure issues, local opposition is also having a toll on data center construction. At least $156B across 48 projects with publicly disclosed values was blocked or stalled amid coordinated local opposition in 2025, and this opposition is hardening into additional legislative hurdles. One example of this growth in opposition is in Virginia, an early leader in data center construction. In Virginia, opposition has grown to end the state’s tax break for data center construction, which was worth at least $1.6B in 2025.

If planned data center build-outs do not take place, demand for critical AI components such as GPUs, memory and digital storage could decline. At the same time many suppliers of memory and solid-state storage started production expansion projects to meet prior expected demand that will start to come on line by 2027.

The result of reduced demand and increased supply would lead to decreased prices and excess supply, perhaps leading to another bust time in boom-bust cycle that is typical for this industry.

Infrastructure and political issues slowing AI data center growth and expanded production of solid-state memory and storage could result in a glut by 2027, reversing recent trends.