惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

腾讯CDC
The Cloudflare Blog
IT之家
IT之家
V
V2EX
雷峰网
雷峰网
MyScale Blog
MyScale Blog
P
Proofpoint News Feed
Stack Overflow Blog
Stack Overflow Blog
博客园 - Franky
Engineering at Meta
Engineering at Meta
S
SegmentFault 最新的问题
GbyAI
GbyAI
Microsoft Azure Blog
Microsoft Azure Blog
博客园 - 司徒正美
云风的 BLOG
云风的 BLOG
小众软件
小众软件
博客园 - 叶小钗
Blog — PlanetScale
Blog — PlanetScale
C
Check Point Blog
A
About on SuperTechFans
B
Blog
月光博客
月光博客
宝玉的分享
宝玉的分享
Last Week in AI
Last Week in AI

Total Telecom

World Communication Awards shortlist announced! - Total Telecom Samsung and Verizon test ISAC capabilities in Dallas - Total Telecom Connected Britain Awards winners 2026 announced! - Total Telecom Huawei takes wearable health beyond devices with Watch D3, Terve Research - Total Telecom The devices you can’t patch: A hidden challenge behind the CRA  - Total Telecom Huawei latest SingleRAN 22.1 launch targets the Agentverse   - Total Telecom Vodia Announces Expansion of Its Integration with the Apple Ecosystem - Total Telecom AI² Insights Launches at IBC 2026: AI-Powered Intelligence on What AI Actually Delivers in Media & Entertainment - Total Telecom Sparklight Carrier Services Streamlines Wholesale Connectivity Ordering - Total Telecom Sceye and SoftBank demo stratospheric connectivity platform - Total Telecom The fibre is built. Now what? - Total Telecom Why the telecom industry acquisition problem is really about retention - Total Telecom Boldyn Networks’ 5G RedCap to support smart livestock monitoring in West Sussex - Total Telecom Boldyn Networks’ 5G RedCap to support smart livestock monitoring - Total Telecom Garbage in, bad decisions out: The data problem behind autonomous networks - Total Telecom Aarhus Vand Selects Netmore for Smart Meter Network - Total Telecom Vodafone Business and Tech Mahindra partner to target UK's digital transformation - Total Telecom Huawei and HP Inc. sign landmark patent cross-licensing agreement - Total Telecom Deadline looms for mobile network operators to implement their zero-rating obligations - Total Telecom EE introduces premium ‘Fast Lane’ 5G network slicing service - Total Telecom BT backing startups in Scottish Highlands and Islands - Total Telecom Beyond the lab: How Linksys is redefining real-world Wi-Fi testing  - Total Telecom New AI system set to triage non-emergency police calls - Total Telecom Rail Wi-Fi and farming sensors: UK govt awards £13m to 16 satellite projects - Total Telecom Why Your Optical Layer Is Now an Energy Per Inference Strategy - Total Telecom The build is over, but can you operate what you built?  - Total Telecom Shared Rural Network rollout extends to UK national parks with over 150 4G masts live - Total Telecom Vodafone touts latest attempt to bridge the UK's digital divide - Total Telecom Virgin Media O2 cuts 5,200 tonnes of carbon dioxide emissions - Total Telecom Summit '26 to tackle challenges faced by US MDU owners, operators - Total Telecom
BDUK gives August 2026 update on Project Gigabit progress...
Harry Baldock · 2026-08-24 · via Total Telecom

News

Over 9,000 additional premises were passed last month as a direct result of the Gigabit Infrastructure Subsidy (GIS) programme

In a timely update ahead of Connected Britain next month, Building Digital UK (BDUK) has today published an update on the progress of various contracts as part of the £5 billion Project Gigabit broadband rollout initiative.

The data, as of August 17, suggests that 296,770 contracted premises have now been delivered, up from 287,510 in July 2026. This represents around 35% of the 846,770 premises covered by existing contracts.

The government release notes that these figures are meant only as a rough indication of progress, noting that the ‘variable time lag between contract signature/delivery and data ingestion by BDUK’ means they may not be strictly accurate. The reported figures have also been rounded to the nearest 10.

The agency also highlighted that the figures should not be directly compared to those published in BDUK’s annual Delivery Performance report earlier this summer; those results, showing 1.42 million premises passed, refer to premises passed with the support of any public or BDUK-related subsidy, rather than solely the GIS programme.

Backed by £5 billion in public funding, Project Gigabit was first introduced in 2021with the aim of supporting the government’s gigabit-capable broadband targets. Those targets have evolved substantially over the past five years but are now set at 99% of premises passed with gigabit-capable broadband technology by 2032.

The UK currently has gigabit-capable broadband coverage of around 90%, with the 36 current Project Gigabit contracts aimed primarily at supporting rollout to the final 10%.

In short, the programme continues to make steady progress, but the lion’s share of the work remains to be done and will only become more difficult as the target locations become increasingly difficult to reach.

Is the UK doing enough to connect the hardest-to-reach communities? Join the discussion at Connected Britain

Also in the news
Shared Rural Network rollout extends to UK national parks with over 150 4G masts live
Vodafone touts latest attempt to bridge the UK’s digital divide
Virgin Media O2 cuts 5,200 tonnes of carbon dioxide emissions