惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - 叶小钗
雷峰网
雷峰网
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
Martin Fowler
Martin Fowler
MyScale Blog
MyScale Blog
博客园 - 聂微东
有赞技术团队
有赞技术团队
The Cloudflare Blog
T
Tailwind CSS Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
月光博客
月光博客
T
The Blog of Author Tim Ferriss
D
Docker
L
LangChain Blog
Vercel News
Vercel News
C
Check Point Blog
博客园 - Franky
博客园 - 三生石上(FineUI控件)
Recent Announcements
Recent Announcements
H
Hackread – Cybersecurity News, Data Breaches, AI and More
量子位
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
V
V2EX
人人都是产品经理
人人都是产品经理

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability The wait for atmanirbharta in pumped storage projects
Utah bets on nuclear to power AI-driven data centre growth
Sindhu Hariharan · 2026-07-06 · via Clean Tech News | The HinduBusinessLine
Spencer Cox, Governor of Utah

Spencer Cox, Governor of Utah

Utah plans to step up nuclear power generation to meet an anticipated surge in electricity demand from data centres, with Governor Spencer Cox saying new projects are expected to come up within four to five years.

“We’re going to have nuclear here, hopefully in the next four or five years, in a big way. We’ve had several nuclear companies who have moved to Utah, more that are coming. And we think that’s an area that is very much ripe for investments,” Cox told businessline during an interaction.

As Big Tech companies step up investments in artificial intelligence, states across the US are competing to attract data centres while ensuring adequate power supplies.

Utah is positioning itself as a government that pursues investments both in AI infrastructure and alternative energy sources.

The western US State has launched Operation Gigawatt, an ambitious initiative to double electricity generation over the coming decade. It focuses on advanced nuclear energy, including conversion of ageing coal-fired power plants into nuclear facilities, and the development of a domestic nuclear supply chain.

The move comes as Big Tech companies are expected to spend well over $300 billion this year on AI infrastructure, much of it on data centres.

Utah already hosts about 48 data centres with a combined power capacity exceeding 920 MW, according to industry estimates. Demand is expected to rise sharply.

A proposed 40,000-acre data centre campus in Box Elder County, developed by O’Leary Digital, is drawing attention for its enormous power requirement, although the project proposes to generate its own electricity rather than relying on the public grid.

The State’s lawmakers are also working with the US Department of Energy to establish a Nuclear Lifecycle Innovation Campus to position Utah as a national hub for next-generation nuclear research, development and power generation.

Betting on Utah’s skilled workforce and established energy ecosystem, Cox said fresh investments could accelerate the commercialisation of advanced nuclear technologies.

“We just had a new nuclear reactor go critical here in Utah... which was an incredible goal. They started a year ago,” he said, adding that the State’s ambitions extend beyond deploying small modular reactors (SMRs) to manufacturing reactor components as well.

State Senator Jerry Stevenson said nuclear power was emerging as the preferred option because it offers reliable electricity with lower environmental impacts when managed safely.

“We also have a site about 100 miles from Salt Lake City where we are working on safe disposal of nuclear waste from large plants and reprocessing it into fuel for smaller reactors,” Stevenson said.

After decades of limited new reactor construction, the rapid growth of artificial intelligence and cloud computing has rekindled interest in nuclear power. Technology companies including Amazon, Google and Microsoft have announced investments or partnerships linked to nuclear energy, particularly SMRs, to secure long-term power supply for their expanding data centre operations.

Several US states are revisiting their nuclear policies as electricity demand, after years of remaining largely flat, begins to climb again.

Geothermal systems

Utah is also banking on geothermal power. It is among the few states in the US with significant, utility-scale geothermal potential. The Utah Frontier Observatory for Research in Geothermal Energy (Utah FORGE), supported by the US Department of Energy, is working to commercialise enhanced geothermal systems.

Private investment is also gathering pace. Texas-based Fervo Energy is developing a geothermal project in Utah to supply 400 MW of round-the-clock, carbon-free electricity.

“It is actually scalable now. The first wells we drilled took months. Now they’re taking weeks,” Cox said.

(The writer was in Utah on a foreign press tour at the invitation of the US State Department)

Published on July 6, 2026