惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Jina AI
Jina AI
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
B
Blog
T
The Blog of Author Tim Ferriss
量子位
Microsoft Azure Blog
Microsoft Azure Blog
博客园 - Franky
小众软件
小众软件
Recent Announcements
Recent Announcements
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
I
InfoQ
美团技术团队
G
Google Developers Blog
Engineering at Meta
Engineering at Meta
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
V
Visual Studio Blog
云风的 BLOG
云风的 BLOG
博客园 - 【当耐特】
IT之家
IT之家
Microsoft Security Blog
Microsoft Security Blog
博客园 - 聂微东
Last Week in AI
Last Week in AI
H
Hackread – Cybersecurity News, Data Breaches, AI and More
H
Help Net Security

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability
A watershed moment for battery storage capacity
By M Ramesh · 2026-01-05 · via Clean Tech News | The HinduBusinessLine

In the renewable energy sector, the year 2025 was one of continuous records.

After solar installed capacity and module manufacturing capacity crossed 100 GW each, wind swept past 50 GW, RE capacity exceeded 200 GW, and power generation capacity from non-fossil fuel grew more than 250 GW and accounted for more than half of the country’s electricity generation capacity, here is yet another record: energy storage system (ESS) capacity tendered exceeded 100 GWhr, according to the latest data provided by the India Energy Storage Alliance (IESA).

Indeed, it was the spurt in battery energy storage systems (BESS) that powered the rapid growth in solar and wind installations.

IESA, in its recently released ‘India Energy Storage Report 2025’, says that 102 GWhr of ESS capacity was tendered in 2025, which was 1.5 times the cumulative capacity until 2024. BESS, a subset of ESS, was the biggest driver, accounting for 60 GWhr of tenders, compared with 24 GWhr in 2024 and 4 GWhr in 2023.

“As of December 2025, 224 GWh of ESS capacity tenders has been shared, of which 95 GWh is in various stages of execution and 80 GWh is in tendering process with 47 GWh tenders cancelled,” the report says.

The report lists the policy measures brought in during what it describes as a “trailblazing year”. It notes that after tasting success with the first tranche of viability gap funding (VGF) for 13.2 GWhr, the Ministry of Power came out with a second tranche, for 30 GWhr, with VGF of ₹5,400 crore.

The year will also be remembered for two landmark events pertaining to BESS — the commissioning of the country’s first MWhr-scale (3 MWhr) vanadium redox battery (VRB), by NTPC, in November; and the first merchant BESS project of 60 MWhr capacity, by Juniper Green Energy, in December.

The IESA report also notes that 50 new players entered the “BESS arena” as developers in 2025.

More Like This

Published on January 5, 2026