惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Hugging Face - Blog
Hugging Face - Blog
Google DeepMind News
Google DeepMind News
云风的 BLOG
云风的 BLOG
WordPress大学
WordPress大学
Vercel News
Vercel News
Apple Machine Learning Research
Apple Machine Learning Research
T
Tailwind CSS Blog
I
InfoQ
小众软件
小众软件
Recent Announcements
Recent Announcements
博客园 - 【当耐特】
The GitHub Blog
The GitHub Blog
大猫的无限游戏
大猫的无限游戏
美团技术团队
T
The Blog of Author Tim Ferriss
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
酷 壳 – CoolShell
酷 壳 – CoolShell
MongoDB | Blog
MongoDB | Blog
V
V2EX
J
Java Code Geeks
有赞技术团队
有赞技术团队
博客园 - 聂微东
B
Blog RSS Feed
博客园 - 司徒正美

Ubergizmo

Motorola Launches Its Most Fashionable Flip Phone Lineup Yet: New Razr Ultra (2026), Razr Plus (2026), And Razr (2026), Are Robots Coming For Airport Jobs? Japan Airlines Testing Humanoids Apple Introduces Commitment-Based Monthly Subscriptions For The App Store No Google Drive Or iCloud! WhatsApp Reportedly Developing Independent Cloud Backup Infrastructure OnePlus Ace 6 Ultra Launches With 8,600mAh Battery And 165Hz Gaming Display Adobe Launches Firefly AI Assistant To Automate Workflows Across Photoshop And Premiere The AI Did Not Go Rogue. The Company Gave It Too Much Access Leica Announces M-A Hammertone Limited Edition For 20th Anniversary Vivo Y600 Pro Announced With Massive 10,200 mAh Battery And 1.5K OLED Display AI Was Supposed To Cut Costs. Now Some Companies Say It Costs More Than Workers Google Workspace Redesign: 13 New App Icons Feature Modern Gradient Look MediaTek Dimensity 7450 And 7450X Announced With 200MP Support And AI for Mid-Range Phones Microsoft Looks Ready To Stop Forcing Windows Updates At The Worst Time Tesla Cybercab Production Starts For Elon Musk’s Autonomous Robotaxi BYD Yangwang U8L Dingzang Edition: Ultra-Luxury SUV With Zero-Gravity Seats XChat Standalone Messaging App Launches For X Users On iPhone And iPad Pokémon Scarlet And Violet Players Can Download A Free Chesnaught Raid Event Until April 30 Goodbye, Windows! SteamOS 3.9 Brings Official Support For ASUS ROG Ally, Lenovo Legion Go, And AMD Handhelds Geely Eva Cab Robotaxi, An AI-Powered Autonomous EV With 4ms Reaction Time New Honor MagicPad 3 Pro 12.3 Debuts Bringing 165Hz OLED Screen And Snapdragon 8 Gen 5 LPDDR6 RAM: Faster, Smarter Memory For The Next Generation Of Tech OpenAI Introduces Workspace Agents: Autonomous Collaboration For ChatGPT Teams Xbox Cut Game Pass Prices But Ended Day-One Call of Duty Access Govee Launches $99.99 Solar String Lights for Smart Backyard Lighting Insta360 Updates Flow 2 Series Gimbals With Enhanced Android Support And Apple Integration Microsoft Integrates Advanced “Agent Mode” With AI Into Word, Excel And PowerPoint Volkswagen Jetta Concept X Unveiled: A Strategic Electric Shift Under 15,000 USD DJI Unveils New Entry-Level Lito Drone Series: 48 MP, 4K Video, ActiveTrack And More Fitbit Enhances Sleep Score With Deep Analytics And Digital Coaching Threads Introduces Live Chats for Real-Time Event Interaction
Will AI Data Centers Make Power Bills Worse? A Massive Ut...
Aiva Keller · 2026-04-27 · via Ubergizmo

AI-generated data center, for illustration only

Utah officials are weighing a data center and energy project so large that it is difficult to describe as a normal industrial development.

The Stratos Project, also being marketed as “Wonder Valley,” is planned for rural Box Elder County and could cover as much as 40,000 acres. Public reporting and meeting materials describe a mixed-use development built around hyperscale data centers, power production, manufacturing, housing and commercial uses. That combination alone would make it significant, but the energy numbers are what have pushed the proposal into a different category.

According to reporting cited in the project materials (PDF link), Phase 1 could generate about 3 gigawatts of energy, while the full project could reach 9 gigawatts of capacity.

9 gigawatts running continuously would equal about 78.8 terawatt-hours of electricity over a year. PacifiCorp’s 2025 Integrated Resource Plan update shows Utah retail sales at about 27.7 terawatt-hours in 2026 and 28.4 terawatt-hours in 2027.

That does not mean Stratos would necessarily consume more electricity than the state uses today, because capacity, generation and actual delivered load are not interchangeable. But it does show why the proposal is being discussed in grid-scale terms rather than as a routine industrial park. (pacificorp.com)

Still, that scale is also why people are worried. Residents have already raised concerns about water use, pollution, noise, land impacts and the speed of the approval process. Those concerns are not unusual for large data center projects, especially in places where power, cooling and water questions can affect nearby communities. But in this case, the size of the proposal makes the questions more urgent.

County documents reportedly frame the project as useful for large data centers and advanced manufacturers connected to military and national-defense-related missions. But it may also make some residents more concerned about transparency, because this is not just a conventional commercial development moving through a familiar local planning process.

Filed in . Read more about and .