惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Microsoft Security Blog
Microsoft Security Blog
量子位
大猫的无限游戏
大猫的无限游戏
酷 壳 – CoolShell
酷 壳 – CoolShell
IT之家
IT之家
博客园 - 三生石上(FineUI控件)
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
博客园 - Franky
美团技术团队
Last Week in AI
Last Week in AI
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
人人都是产品经理
人人都是产品经理
罗磊的独立博客
Jina AI
Jina AI
小众软件
小众软件
S
SegmentFault 最新的问题
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
雷峰网
雷峰网
博客园 - 聂微东
博客园_首页
The Cloudflare Blog
WordPress大学
WordPress大学
Apple Machine Learning Research
Apple Machine Learning Research
有赞技术团队
有赞技术团队

Comments for Vijay Gill's Blog

Lack of Smart Engineers Considered Harmful Lack of Smart Engineers Considered Harmful Management Books Management Books Underinvestment in Infrastructure Orgs AMD exits dense microserver business. Ends Seamicro brand Cloud Services and outcome-blind decision making Management Books
Why Nothing Great Ever Came From Outsourced Teams
Alex · 2015-04-18 · via Comments for Vijay Gill's Blog

I am just going to quote Xs’ mail here verbatim, there is nothing that I could possibly add.

From: XX

This is all ancient history at this point, but just to offer some insight on AOL, which may have relevance to the AT&T/Apple issues (and also as a clarification to Brock’s post).

Like many large organizations, AOL (circa 1993) left up to other firms how to build out their own networks to support our needs.   We did all the marketing research, capacity planning, and internal network engineering then supplied requirements to several firms who were actually building modems in the field.  AOL then took aggregated calls on dedicated backhauls into our data centers.  We knew where we going to send disks or CDs in bulk and on what schedule, so could predict with some certainty where modems would be needed and when.  But it was up to someone else to do the heavy lifting and build racks of gear in central offices around the country based on our direction.

When the company was growing at breakneck speed, our people were often working around the clock building internal systems…. lots of 2 AM pizza deliveries, and sometimes sleeping on the floor in the office.  We were ready internally, since we essentially ran the company like a startup.  And we were motivated not just by the thrill of it all but a looming financial incentive in terms of stock options to get it right.

Our contracted modem builders (certainly at 2 of the 3 companies we partnered with) didn’t operate the same way.   Try telling the guys putting together modem banks in Iowa City or Plano that they have to pull a 16 hour shift, and oh by the way, don’t expect a weekend off for the next few months.   It’s a different world when you’re dealing with large bureaucracies, union contracts, and folks that certainly don’t have stock or other financial incentives.

So who knows what happened with the AT&T sign-up fiasco.   But there’s a cultural difference between these two companies, and just because folks at Apple are able to pull months of all-nighters to ship the new phone, doesn’t mean their technical counterparts at AT&T are equally motivated.  There probably aren’t lots of AT&T database programmers who are counting the days until their stock vests and they can retire.

And there’s no telling if Verizon had the exclusive contract that this situation would have been any better.   Of all the big mobile carriers, T-Mobile probably most closely matches Apple in terms of culture.   Perhaps no mobile network would have been able to deal with the dramatic amount of data growth when the original iPhone shipped.  In hindsight, maybe the iPhone should have been available from day one in two variants e.g. both GSM (AT&T/T-Mobile) and CDMA (Verizon).   At the minimum Apple would have had two companies to work with, and hopefully one of them was able to keep up.

You’d expect large companies to handle this kind of growth efficiently, but building these systems can be major engineering challenges.  It doesn’t take much to have the logistics get off track and suddenly you’re behind the power curve trying to catch a moving target.   AT&T management may already be cutting resources if they know full well that Apple is taking their business elsewhere in a year or two.   There’s plenty of blame to go around, but differences in culture, motivation, and economics all probably played a factor in how this whole situation came to be.

XX
(AOL’s network guy, ’93-98)

This entry was posted on Friday, April 17th, 2015 at 19:05 and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.