惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

T
Tailwind CSS Blog
The GitHub Blog
The GitHub Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
B
Blog
Microsoft Security Blog
Microsoft Security Blog
Stack Overflow Blog
Stack Overflow Blog
量子位
Martin Fowler
Martin Fowler
月光博客
月光博客
P
Proofpoint News Feed
博客园_首页
Y
Y Combinator Blog
I
InfoQ
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
V
Visual Studio Blog
H
Help Net Security
U
Unit 42
GbyAI
GbyAI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 司徒正美
MongoDB | Blog
MongoDB | Blog
F
Fortinet All Blogs
罗磊的独立博客
酷 壳 – CoolShell
酷 壳 – CoolShell

cs.HC updates on arXiv.org

Quantitative Movement Testing: Measuring Patient Movements from a Single Smartphone Video Vision-Language Models Suppress Female Representations Under Ambiguous Input The New Social Image: How AI Competency and AI Proactivity Influence Self- and Peer-Perceptions in the Workplace TUX: Measuring Human--AI Tacit Understanding LLUMI: Improving LLM Writing Assistance for Mental Health Support with Online Community Feedback VideoFDB: Evaluating Full-Duplex Vision-Speech Capabilities in Conversational Agents Label Over Logic? How Source Cues Bias Human Fallacy Judgments More Than LLMs Inform, Coach, Relate, Listen: Auditing LLM Caregiving Support Roles How Coding Agents Fail Their Users: A Large-Scale Analysis of Developer-Agent Misalignment in 20,574 Real-World Sessions MetaRanker: Human-in-the-loop Active Ranking for Metalens Image Quality Analyzing Persona Effects in Generated Explanations from Multimodal LLM Agents in Urban Perception First head-to-head comparison of agentic AI applied to the analysis of simulated data of the Einstein Telescope Granuscore: A Reference-Free Measure of Granularity for Text Analysis and Question Answering The Timing Dependencies of Trust: Speed, Accuracy, and cBCI Neuro-Decoupling in Human-AI Teams Bayesian Distributional Models of Executive Functioning Visual Matters: Connecting Aesthetic Appeal and Production Quality of Photos, Infographics and Data Visualizations to Credibility of Social Media Posts Data-driven Head Motion Generation through Natural Gaze-Head Coordination Agreement Metrics for LLM-as-Judge Evaluation: What to Report and Why Perceptually Lossless Tactile Texture Synthesis with Compact Spectral Envelope Models MambaGaze: Bidirectional Mamba with Explicit Missing Data Modeling for Cognitive Load Assessment from Eye-Gaze Tracking Data CogAdapt: Transferring Clinical ECG Foundation Models to Wearable Cognitive Load Assessment via Lead Adaptation Augmented Analytics and Decision Quality: The Role of Trust among Non-Technical BI Users Faster Completion, Less Learning: Generative AI Reduced Study Time on Math Problems and the Knowledge They Build PaintCopilot: Modeling Painting as Autonomous Artistic Continuation Personality Engineering with AI Agents: A New Methodology for Negotiation Research PULSE: Agentic Investigation with Passive Sensing for Proactive Intervention in Cancer Survivorship Access Timing as Scaffolding: A Reinforcement Learning Approach to GenAI in Education Conversations in Space: Structuring Non-Linear LLM Interactions on a Canvas MAPLE: Self-Supervised Learning-Enhanced Nonlinear Dimensionality Reduction for Visual Analysis nASR: An End-to-End Trainable Neural Layer for Channel-Level EEG Artifact Subspace Reconstruction in Real-Time BCI
Envision of an integrated information system for project-...
Ricardo Antunes, Mani Poshdar · 2018-07-13 · via cs.HC updates on arXiv.org

Construction frequently appears at the bottom of productivity charts with decreasing indexes of productivity over the years. Lack of innovation and delayed adoption, informal processes or insufficient rigor and consistency in process execution, insufficient knowledge transfer from project to project, weak project monitoring, little cross- functional cooperation, little collaboration with suppliers, conservative company culture, and a shortage of young talent and people development are usual issues. Whereas work has been carried out on information technology and automation in construction their application is isolated without an interconnected information flow. This paper suggests a framework to address production issues on construction by implementing an integrated automatic supervisory control and data acquisition for management and operations. The system is divided into planning, monitoring, controlling, and executing groups clustering technologies to track both the project product and production. This research stands on the four pillars of manufacturing knowledge and lean production (production processes, production management, equipment/tool design, and automated systems and control). The framework offers benefits such as increased information flow, detection and prevention of overburdening equipment or labor (Muri) and production unevenness (Mura), reduction of waste (Muda), evidential and continuous process standardization and improvement, reuse and abstraction of project information across endeavors.