惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Microsoft Azure Blog
Microsoft Azure Blog
博客园 - 司徒正美
大猫的无限游戏
大猫的无限游戏
T
Tailwind CSS Blog
Apple Machine Learning Research
Apple Machine Learning Research
Last Week in AI
Last Week in AI
爱范儿
爱范儿
WordPress大学
WordPress大学
V
V2EX
宝玉的分享
宝玉的分享
小众软件
小众软件
B
Blog
博客园 - 叶小钗
U
Unit 42
酷 壳 – CoolShell
酷 壳 – CoolShell
人人都是产品经理
人人都是产品经理
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
腾讯CDC
H
Help Net Security
P
Proofpoint News Feed
D
Docker
Microsoft Security Blog
Microsoft Security Blog
罗磊的独立博客
月光博客
月光博客

cs.DS updates on arXiv.org

PAC Learning with Bandit Feedback: Sharp Sample Complexity in the Realizable Setting Algorithms with Polynomially-Improved Approximation Factors for the $2 \rightarrow q$ Norm, and Applications A computational phase transition for learning-to-sample from Ising models Covering vertices by sequential stars Fermi-Dirac machines as quantizations of neurons A Comprehensive Evaluation of Vertex Elimination Algorithms for Algorithmic Differentiation A Tight Bound on Localization of Electrical Flows Optimal Dimension-Free Sampling for Regularized Classification Reducing the Randomness in Partition Oracles for Bounded Degree Minor-Free Graphs Beyond the Half-Approximation: Fair and Efficient Online Class Matching Efficient Uniform Sampling of Surjections via their Profiles Tractable Maximization of Budgeted Phylogenetic Diversity on Networks Utilizing Node Scanwidth Fairness in Aggregation: Optimal Top-$k$ and Improved Full Ranking Learning-Augmented Online Scheduling with Parsimonious Preemption Entropy Equivalence Testing Lumberjack: Better Differentially Private Random Forests through Heavy Hitter Detection in Trees The Secretary Problem with a Stochastic Precursor Polynomial-Time Robust Multiclass Linear Classification under Gaussian Marginals Efficient Banzhaf-Based Data Valuation for $k$-Nearest Neighbors Classification Block-Sphere Vector Quantization An Approximation Algorithm for Graph Label Selection Iterative Chow Filtering for Learning with Distribution Shift Complexity of Non-Log-Concave Sampling in Fisher Information Stochastic Matching via Local Sparsification Finite Sample Bounds for Learning with Score Matching What is Learnable in Valiant's Theory of the Learnable? Provable Quantization with Randomized Hadamard Transform Min-Max Optimization Requires Exponentially Many Queries Fast and Compact Graph Cuts for the Boykov-Kolmogorov Algorithm A proximal gradient algorithm for composite log-concave sampling
Hardness of Interval Scheduling on Unrelated Machines
Danny Hermelin, Yuval Itzhaki, Hendrik Molter, Dvir Shabtay · 2022-06-26 · via cs.DS updates on arXiv.org

We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly at their deadline. We are given $n$ jobs and $m$ machines. Each job has a deadline, a weight, and a processing time that may be different on each machine. The goal is find a schedule that maximized the total weight of jobs completed exactly at their deadline. Note that this uniquely defines a processing time interval for each job on each machine. Interval Scheduling on Unrelated Machines is closely related to coloring interval graphs and has been thoroughly studied for several decades. However, as pointed out by Mnich and van Bevern [Computers \& Operations Research, 2018], the parameterized complexity for the number $m$ of machines as a parameter remained open. We resolve this by showing that Interval Scheduling on Unrelated Machines is W[1]-hard when parameterized by the number $m$ of machines. To this end, we prove W[1]-hardness with respect to $m$ of the special case where we have parallel machines with eligible machine sets for jobs. This answers Open Problem 8 of Mnich and van Bevern's list of 15 open problems in the parameterized complexity of scheduling [Computers \& Operations Research, 2018]. Furthermore, we resolve the computational complexity status of the unweighted version of Interval Scheduling on Unrelated Machines by proving that it is NP-complete. This answers an open question by Sung and Vlach [Journal of Scheduling, 2005].