





















The Moore-Hodgson Algorithm minimizes the number of late jobs on a single machine. That is, it finds an optimal schedule for the classical problem $1~|\;|~\sum{U_j}$. Several proofs of the correctness of this algorithm have been published. We present a new short proof.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。