惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

A
About on SuperTechFans
人人都是产品经理
人人都是产品经理
量子位
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 三生石上(FineUI控件)
小众软件
小众软件
月光博客
月光博客
T
Tailwind CSS Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
V
Visual Studio Blog
博客园 - 叶小钗
博客园 - 司徒正美
美团技术团队
博客园_首页
宝玉的分享
宝玉的分享
Apple Machine Learning Research
Apple Machine Learning Research
Hugging Face - Blog
Hugging Face - Blog
WordPress大学
WordPress大学
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
The Cloudflare Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
有赞技术团队
有赞技术团队
D
DataBreaches.Net
Google DeepMind News
Google DeepMind News

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability The wait for atmanirbharta in pumped storage projects
Move to extend ISTS waiver
Team BL · 2026-08-03 · via Clean Tech News | The HinduBusinessLine

The Central Electricity Regulatory Commission (CERC) has proposed to extend the 25-year waiver of inter-State transmission charges (ISTS) for energy storage systems that are a part of renewable energy plants. This aligns the wavier with the life of the RE project, as opposed to only the battery’s life.

In a draft fifth amendment to the CERC Sharing of Inter-State Transmission Charges and Losses Regulations, 2026, the commission said that where storage forms part of a single renewable energy generation plant, the waiver will be available from the plant’s commercial operation date. The draft has been put up for public comments.

Another proposal is to allow RE purchased through the Green Day-ahead market (G-DAM) from energy exchanges to meet the requirement that at least 51 per cent of an energy storage system should come from wind or solar sources. However, the energy exchange should certify the RE mix.

The amendment also provides relief to renewable projects delayed due to non-readiness of transmission infrastructure, allowing them to retain applicable ISTS waivers if they meet specified conditions, including achieving commercial operation within two months of transmission readiness.

For pumped storage projects (PSPs) serving multiple buyers, the commission proposes assessing the 51 per cent renewable charging criterion contract-wise, preventing one non-compliant contract from disqualifying the entire project from ISTS waivers.

The proposal also introduces provisions relating to transmission deviation calculations.

NIRL bags solar project

IPO-bound NLC India Renewables Ltd (NIRL), a wholly owned subsidiary of NLC India Ltd, has received a letter of intent from Gujarat Urja Vikas Nigam Ltd (GUVNL) for setting up a 900 MW solar power project.

The project has been awarded through a tariff-based competitive bidding process, with the power generated to be procured by GUVNL, according to a press release from NLC India.

“This latest addition not only builds on NIRL’s renewable energy portfolio, but also reinforces its commitment to becoming a 10+ GW renewable energy company by 2030,” the release says.

Published on August 3, 2026