惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

GbyAI
GbyAI
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
L
LangChain Blog
Blog — PlanetScale
Blog — PlanetScale
A
About on SuperTechFans
Y
Y Combinator Blog
MyScale Blog
MyScale Blog
M
MIT News - Artificial intelligence
V
Visual Studio Blog
人人都是产品经理
人人都是产品经理
T
Threat Research - Cisco Blogs
L
Lohrmann on Cybersecurity
Application and Cybersecurity Blog
Application and Cybersecurity Blog
NISL@THU
NISL@THU
aimingoo的专栏
aimingoo的专栏
T
Tor Project blog
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
Cisco Talos Blog
Cisco Talos Blog
A
Arctic Wolf
T
Troy Hunt's Blog
U
Unit 42
Forbes - Security
Forbes - Security
J
Java Code Geeks
P
Privacy International News Feed
W
WeLiveSecurity
T
The Exploit Database - CXSecurity.com
S
Schneier on Security
H
Heimdal Security Blog
量子位
Martin Fowler
Martin Fowler
G
Google Developers Blog
WordPress大学
WordPress大学
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
D
Docker
罗磊的独立博客
Security Archives - TechRepublic
Security Archives - TechRepublic
Engineering at Meta
Engineering at Meta
云风的 BLOG
云风的 BLOG
雷峰网
雷峰网
Simon Willison's Weblog
Simon Willison's Weblog
N
News and Events Feed by Topic
D
DataBreaches.Net
V2EX - 技术
V2EX - 技术
AWS News Blog
AWS News Blog
cs.CL updates on arXiv.org
cs.CL updates on arXiv.org
Attack and Defense Labs
Attack and Defense Labs
S
SegmentFault 最新的问题
MongoDB | Blog
MongoDB | Blog
S
Secure Thoughts
Apple Machine Learning Research
Apple Machine Learning Research

Clean Tech News | The HinduBusinessLine

Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability The wait for atmanirbharta in pumped storage projects Liquidation of discoms’ regulatory assets will spur industrial use of renewable energy CERC sends out feelers for ‘capacity markets’ APTEL’s judgement is a wakeup call for discoms After a lull, why temperature spikes are likely to intensify in north India Power regulator’s nudge towards ‘market coupling’ Cruising towards Indian carbon market Renewable energy ministry approves pilot CfD scheme Renewable components supply chained to imports Despite PFBR going critical, India is still a long way from thorium utilisation Oil-starved industry looks to reignite heat pumps Key takeaways from CEA’s national power generation adequacy plan for the coming decade Storage, flexible usage and ‘virtual supply’ are key to taming peak power demand CERC settles dispute dating back a quarter century New NDC: As wars rage elsewhere, India must battle to green itself Can ‘district cooling’ temper peak power demand? Buzz in energy storage sector Electrifying effect of India Energy Stack What is slowing residential rooftop solar installations Indian solar sector hits third century International Energy Agency voices concern over rising electricity bills Well-intentioned, but politically fraught New concepts reflect NEP 2026’s modern thinking PM Surya Ghar: Where does India stand on the second anniversary of the scheme? NLC to add 650 MW of solar power capacity this year CCUS: An idea whose time has come, but at a price Why rigid control of power grid frequency should be a thing of the past Can ‘cooling-as-a-service’ fix the decarbonisation gap? Energy storage: From better to BESS Why Maharashtra’s solar pump scheme is grabbing attention globally Bids for ₹6,444 cr west-east RE transmission project Why VPPAs may not be a game-changer Shrinking gap in peak electricity demand Developers told to add BESS, shift to non-solar hours A watershed moment for battery storage capacity ‘ANEEL fuel fundamentally reshapes India’s thorium pathway’ A farmer’s fraught venture into solar generation Why the new nuclear legislation may not attract private investment Odisha’s green hydrogen pitch rides on its revenue surplus German firm Enerparc bags electricity trading licence The bigger, the better, right? Suzlon says not really India must capture carbon to unleash climate action India’s clean energy transition finds its tipping point in 2025 India faces 1.3 million transformer failures annually How floating solar can buoy up India’s green transition Rooftop solar installations gather speed; touch 22.5 GW All green talk, no greenback Mining silver and more from retired solar panels India’s NDC: To publish or not to publish COP: The rise of a new influential triad A Himalayan effort at climate change mitigation International meet on green hydrogen in New Delhi Climate action: A case of ‘a lot’ done to little avail Solar+battery vs new coal Why are so many transmission towers collapsing? Virtual PPAs, the next big thing in RE Tackling the black sheep of waste RE development in the time of data vacuum Powering the plough: What PM-KUSUM scheme must do to give a fillip to farmers Maharashtra overtakes Tamil Nadu in Renewable Energy capacity India’s non-fossil-fuel power capacity crosses 250-GW mark Non-fossil based power generation reaches 30% Hydrogen body urges refineries to tender for GH2 Blues of the global green hydrogen story A booster shot for the recycling sector Power regulator proposes tweaks to deviation settlement mechanism Global hydrogen demand up 2% in two years: Report How to accurately peg ‘additionality’ in carbon credits Adani to sell thermal power at ₹6.07 a kWhr Rossiya set to cleave a green sea route Green bonds: How to overcome the challenge of fading ‘greenium’
India’s ambitions for nuclear energy face a tariff test
By M Ramesh · 2026-05-21 · via Clean Tech News | The HinduBusinessLine

The passage of the SHANTI Act, 2025, allowing the private sector to set up and run nuclear power plants in India has created a buzz. But few seem to have looked at nuclear energy’s soft underbelly — the cost.

India’s existing nuclear power plants produce electricity competitively — at ₹2.72–3.87 a kWhr. But these plants were built decades ago.

What will be the cost of new nuclear power plants? A peek into this was provided by experts at a recent workshop on the SHANTI Act that was organised by the Central Electricity Authority. A pressurised heavy water reactor (PHWR) — the Nuclear Power Corporation of India is building 10 of these at 700 MW capacity each — will cost ₹21 crore a MW.

Using the existing pricing formula — 15.5 per cent return on equity, 2.33 per cent annual depreciation, and so on — the tariff works out to be ₹7.77 a kWhr. In the case of a pressurised water reactor (as opposed to heavy water), the tariff rises to ₹7.78 a kWhr.

Who will buy this at a time when renewable energy supplied continuously through battery or pumped storage is available at around ₹4 and expected to get cheaper over the years?

The workshop deliberated on this point. It has been said that the cost of nuclear power can be reduced by 20 paise by lowering the GST from 18 per cent GST to 5 per cent, and by 30 paise if the tax is eliminated, thereby lowering return expectations — 10 paise for 1 percentage point lower ROI, and 15 paise if the normative interest rate drops by 1 percentage point. The interest rate has one more complexity. The normative rates are calculated on the basis of a 30-year loan. The absence of a 30-year loan product came up at the workshop, and the solution suggested was rollover or refinance of loans for a 30-year period. However, this could expose the projects to uncertainty over future interest rates and sustained reduction in financing costs. Further reduction in tariffs is possible by operating the plant above the normative PLF of 72.5 per cent.

However, despite the potential for tariff reduction, nuclear energy is still expensive. Moreover, the indicative tariffs are valid for the present. Projects set up later would entail a 10 paise rise in tariffs each year, due to the normative increase in O&M costs. A nuclear power project takes 13 years to build.

Cost in private

Now, another question pertains to how costly will be the nuclear power plants set up by the private sector? Till date, the private sector has not gone beyond expressing an interest in nuclear energy — perhaps because the rules are yet to be framed. But when they do embark on a project, they are likely to face the biggest challenge of all: the market.

Furthermore, future nuclear power projects will have to be run on imported uranium — 50 GW nuclear power plants will need about 6,000 tonnes of uranium a year. The Nuclear Fuel Complex in India, even after the proposed expansion, can supply 2,900 tonnes — which will go to supply the upcoming plants of NPCIL. The cost of imported uranium will be impacted by global supply, geopolitics and the attendant factor of exchange rate.

Under the Electricity Act, tariffs are fixed in two ways — cost-plus basis under Section 62; and competitive bidding under Section 63. Tariffs of nuclear power plants are not governed by the Electricity Act — they are fixed by the Department of Atomic Energy in consultation with the Central Electricity Authority, again on cost-plus basis. The tariffs of the private sector projects set up under the SHANTI Act will be fixed in this manner. It is hard to see these as competitive against firm renewable energy.

The picture blurs when we move from large projects to small modular reactors (SMRs), because nobody knows how the costs will pan out.

So, will the SHANTI Act engender a fleet of nuclear power plants that can raise India’s nuclear energy capacity from 8 GW to 100 GW by 2047? Fingers crossed.

Published on May 21, 2026