惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
Jina AI
Jina AI
博客园 - Franky
Apple Machine Learning Research
Apple Machine Learning Research
酷 壳 – CoolShell
酷 壳 – CoolShell
阮一峰的网络日志
阮一峰的网络日志
量子位
雷峰网
雷峰网
宝玉的分享
宝玉的分享
V
Visual Studio Blog
博客园_首页
小众软件
小众软件
The Cloudflare Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
大猫的无限游戏
大猫的无限游戏
博客园 - 聂微东
S
SegmentFault 最新的问题
博客园 - 【当耐特】
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - 叶小钗
月光博客
月光博客
博客园 - 三生石上(FineUI控件)
人人都是产品经理
人人都是产品经理
WordPress大学
WordPress大学

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability The wait for atmanirbharta in pumped storage projects
Why, at 42.79%, record RE penetration is as much a cause ...
M Ramesh · 2026-07-19 · via Clean Tech News | The HinduBusinessLine
DOUBLE-EDGED Variable renewable energy is good for decarbonisation, but a headache for grid operators

DOUBLE-EDGED Variable renewable energy is good for decarbonisation, but a headache for grid operators | Photo Credit: lovelyday12

At 12:29 hours on July 13, India achieved a record that went almost unnoticed. Wind and solar together accounted for 42.79 per cent of the electricity being generated in the country at that instant — the highest ever share of variable renewable energy (VRE) in the grid.

Wind and solar together were generating electricity at a rate of 103.7 GW, another record. (GW measures the rate at which energy is generated, much like the horsepower rating of a water pump indicates how much water it can move at any instant.)

Wind and solar had touched their individual milestones earlier. Wind’s share in generation reached a record 17.13 per cent on July 12, while solar’s highest penetration was 39.1 per cent on March 3.

The record renewable energy penetration on July 13, even if for a short duration, illustrates how far India has come in clean energy. Today, VRE capacity (wind plus solar), at 219.6 GW, accounts for 40 per cent of the total installed power capacity of 548.85 GW.

Question of grid stability

The high penetration of VRE is indeed a cause for celebration; equally, it is a warning to grid operators. VRE is good news for energy decarbonisation, but a headache for grid operators. If the output from wind and solar suddenly falls because the wind has dropped or clouds have rolled in, then another source — typically coal, hydro or storage — must step in almost immediately. Electricity generation and demand must be balanced every second, otherwise the grid itself comes under stress.

The obvious answer is ‘storage’. Batteries can absorb surplus solar electricity during the afternoon and feed it into the grid after sunset, when demand is high and solar generation stops. Recognising this need, India has begun awarding large battery energy storage projects. But storage alone cannot carry the burden. An oversized battery capacity built for storing the maximum generation is economically unwise.

That is why coal, ironically, has become an important enabler of renewable energy. India’s coal stations were designed to run steadily as baseload generators. The Central Electricity Authority (CEA) has laid down a roadmap for making coal plants more flexible, ultimately enabling many units to tune down, within minutes, their operations to as low as 40 per cent of their rated capacity. In practice, however, much of the fleet remains stuck at a minimum operating level of around 55 per cent. Running plants at lower loads reduces efficiency, increases wear and tear, and raises maintenance costs, which the generators are loath to bear.

Funding flexibility

A renewable-rich grid, however, demands flexibility. The engineering solutions are largely known. The need of the hour are market instruments that help pay for flexibility. Today’s electricity market largely rewards generators for the number of units they produce. Tomorrow’s grid will increasingly need mechanisms that reward flexibility and reliability.

Capacity markets — a concept that’s just being introduced in India — compensate generators or storage providers for being available when the system needs them, even if only occasionally. They reward the ability to provide firm power whenever required. Such market instruments recognise that, in a renewable-rich grid, availability can be as valuable as generation itself.

Former GRID-INDIA chairman SR Narasimhan, commenting on the July 13 milestone, has argued that higher renewable penetration must be accompanied by greater grid discipline.

GRID-INDIA has petitioned the Central Electricity Regulatory Commission (CERC) for powers to disconnect renewable generators that repeatedly fail to comply with grid regulations. Renewable generators are mandated to equip their plants with low-voltage and high-voltage ride-through (LVRT and HVRT) capability — tools that strengthen grid resilience by enabling the generators to remain connected and support the grid during temporary voltage disturbances, instead of disconnecting and worsening the problem. The commission is yet to grant the permission — perhaps because there is a pushback from the generators.

Renewed standards

Narasimhan also urges the CEA to announce the “long-overdue” fresh (revamped) Technical Standards for Connectivity to the Grid Regulations.

The next phase of India’s energy transition will be won not simply by installing more solar panels and wind turbines but by also making the entire electricity system more flexible.

Crossing 100 GW of instantaneous wind and solar generation and 42.79 per cent of VRE penetration is a milestone that serves as a reminder for more work to reach the next milestone. The challenge is no longer merely building green capacity but also ensuring that every unit of clean electricity can be absorbed, transmitted, and used. High renewable penetration is a much better problem to have than low renewable penetration. But it is a problem, nevertheless.

Published on July 19, 2026