惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

S
SegmentFault 最新的问题
V
Visual Studio Blog
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
量子位
月光博客
月光博客
阮一峰的网络日志
阮一峰的网络日志
T
Tailwind CSS Blog
GbyAI
GbyAI
爱范儿
爱范儿
Y
Y Combinator Blog
宝玉的分享
宝玉的分享
有赞技术团队
有赞技术团队
罗磊的独立博客
Recent Announcements
Recent Announcements
博客园 - 司徒正美
M
MIT News - Artificial intelligence
小众软件
小众软件
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
B
Blog RSS Feed
A
About on SuperTechFans
Hugging Face - Blog
Hugging Face - Blog
Apple Machine Learning Research
Apple Machine Learning Research
雷峰网
雷峰网

Latest India News, National News Headlines Today | The HinduBusinessLine

PIL against sale of liquor in tetra packs in UP; SC asks petitioner to approach authorities Delimitation provisions in women's reservation amendment bill 'attack on democracy': Kerala opposition True intent of bills brought by govt mischievous, have to be rejected completely: Congress Country all set to take historic step for women empowerment in special sitting of Parliament: PM Modi Mumbai ‘mad for’ luxury cars, ranked 7th globally: Stratstone ‘Iran war oil shock as disruptive as Covid’ Lucknow plant to make more sustainable mobility in future: Tata Motors Polavaram project: Construction of ECRF dam to be be completed by March 2028 Telangana launches project Sanjeevani for integrated trauma care on highways Nara Lokesh appointed TDP national working president in major party reshuffle AAP MP Ashok Mittal, Chadha’s successor as RS deputy leader, raided by ED in FEMA probe Maharashtra MEMS 108 ambulances to get European-standard emergency upgrades INDIA bloc must plan response to Constitution Amendment Bill together: J-K CM Delimitation: Stalin announces state-wide black flag protest on Thursday, says Centre will pay 'heavy price' Lok Sabha expansion to 850 seats: ‘delimitation-first’ model triggers federal concerns Centre using delimitation under guise of women's reservation, could alter political map: Sanjay Raut Nitish Kumar era ends in Bihar, BJP's Samrat Chaudhary sworn in as Chief Minister Mayawati bats for sub-quota for SC, ST, OBC women within 33% reservation Delimitation will trigger massive agitation in South if it leads to injustice: KTR warns Delimitation: TN Chief Minister Stalin convenes emergency meeting of DMK MPs Boiler blast at Vedanta plant in Chhattisgarh kills 11, injures 22 UP govt raises minimum wages rates by up to 21% from April 1 after violent protests by workers Delhi EV policy draft gets mixed reactions from industry Samrat Chaudhary to take over as BJP’s first Bihar CM, ending Nitish Kumar era Samrat Choudhary set to become Bihar’s first BJP chief minister Andhra Pradesh launches India’s first quantum reference facility in Amaravati HCG plans 1,000-bed expansion, eyes Tier-II cities and acquisitions Maharashtra: Marathi mandatory for rickshaw and taxi drivers from May 1 Uttar Pradesh raises minimum wages across categories after Noida unrest Chandrababu Naidu calls for single-digit licences to boost industry in Andhra Pradesh
Cabinet approves rail multitracking projects in Uttar Pra...
2026-04-18 · via Latest India News, National News Headlines Today | The HinduBusinessLine

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Saturday approved two projects of the Ministry of Railways with a total cost of approx. Rs. 24,815 crore. According to an offical release, these projects include Ghaziabad - Sitapur 3rd and 4th Line, with a route length of 403 km and a track length of 859 km and the estimated cost of this line is Rs14,926 crore (approx.) and the Rajahmundry (Nidadavolu) - Visakhapatnam (Duvvada) 3rd and 4th Line, with route and track lengths of 198 km and 458 km, respectively and the estimated cost is Rs 9,889 crore (approx.).

Boost to capacity, efficiency and connectivity

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister Narendra Modiji’s Vision of a New India, which will make people of the region “Atmanirbhar” by way of comprehensive development in the area, which will enhance their employment/ self-employment opportunities.

Aligned with PM Gati Shakti plan

The projects are planned on the PM-Gati Shakti National Master Plan with a focus on enhancing multi-modal connectivity & logistic efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for the movement of people, goods, and services, the release noted. The two projects covering 15 Districts across the states of Uttar Pradesh and Andhra Pradesh will increase the existing network of Indian Railways by about 601 Kms.

Tourism, freight and environmental benefits

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), Naimisharanya (Sitapur), Annavaram, Antarvedi, Draksharamam, etc. The proposed projects are essential routes for transportation of commodities such as coal, foodgrains, cement, POL, iron and steel, containers, fertilisers, sugar, chemical salts, limestone, etc. The Railways, being environment friendly and energy-efficient mode of transportation, will help both in achieving climate goals and minimising logistics cost of the country, lowering CO2 emissions (180.31 Crore kg), which is equivalent to the plantation of 7.33 Crore trees, according to the release.

Ghaziabad–Sitapur corridor to ease congestion

The Ghaziabad - Sitapur is an existing double-line section forming a key part of the Delhi- Guwahati High Density Network (HDN 4). This project is crucial for improving connectivity between the Northern and Eastern regions of the country. The existing line capacity utilisation of the section is up to 168% and is projected to be up to 207% in case the project is not taken up. The line traverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Sahjahanpur, Lakhimpur Kheri and Sitapur districts of Uttar Pradesh.

The project route passes through major industrial centres - Ghaziabad (machinery, electronics, pharmaceuticals), Moradabad (brassware and handicrafts), Bareilly (furniture, textiles, engineering), Shahjahanpur (carpets and cement-related industries), and Roza (thermal power plant). For seamless transportation, the project alignment is planned to bypass congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur, and accordingly, six new stations are proposed on the bypassing sections. Key tourist/religious places along/near the project section are Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur), among others.

Anticipated additional freight traffic is 35.72 MTPA, consisting of Coal, Foodgrains, Chemical Manures, Finished Steel, etc and employment generation scope of 274 lakh human-days. Meanwhile, the CO2 emissions of about 128.77 crore kg will be saved while logistic cost till Rs. 2,877.46 crore will be saved every year vis-a-vis road transportation, the release highlighted.

Rajahmundry–Visakhapatnam line to support coastal growth

On the other hand, the Rajahmundry (Nidadavolu) - Visakhapatnam (Duvvada) section forms part of the Howrah - Chennai High Density Network (HDN).

The proposed project is part of the quadrupling initiative of the Howrah-Chennai High-Density Network (HDN) route. The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle and Vishakapatnam districts of Andhra Pradesh. Visakhapatnam is identified as an Aspirational District in the Aspirational Districts Programme. It provides connectivity to major ports along the East Coast such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada.

The project route runs along the eastern coastline and is among the busiest, predominantly freight-oriented sections of the East Coast Rail Corridor. The line capacity utilisation of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to the proposed expansion of ports and industries in the region. The project section includes a 4.3 km rail bridge over the Godavari River, 2.67 km viaduct, 3 bypasses and the new alignment is around 8 km shorter than the existing route, improving connectivity and operational efficiency.

The proposed section will also boost tourism by improving access to key destinations such as Annavaram, Antarvedi and Draksharamam, etc. Additional freight traffic of 29.04 MTPA consisting of Coal, Cement, Chemical Manures, Iron and Steel, Foodgrains, Containers, Bauxite, Gypsum, Limestone, etc is anticipated, while employment generation is expected up to 135 lakh human-days. CO2 emissions of about 51.49 crore kg CO2 equivalent to 2.06 Cr trees and logistic cost of Rs. 1,150.56 crore every year vis-a-vis road transportation, will be saved, the release emphasised.

Published on April 18, 2026