惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
Docker
小众软件
小众软件
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
酷 壳 – CoolShell
酷 壳 – CoolShell
Apple Machine Learning Research
Apple Machine Learning Research
月光博客
月光博客
人人都是产品经理
人人都是产品经理
大猫的无限游戏
大猫的无限游戏
V
V2EX
阮一峰的网络日志
阮一峰的网络日志
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
博客园 - Franky
WordPress大学
WordPress大学
有赞技术团队
有赞技术团队
Hugging Face - Blog
Hugging Face - Blog
Jina AI
Jina AI
博客园 - 聂微东
S
SegmentFault 最新的问题
量子位
宝玉的分享
宝玉的分享
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园_首页

Latest Brandhub News | The HinduBusinessLine

University of Aberdeen Mumbai Sets Up Industry, Alumni Advisory Boards Ahead of India Campus Opening How to Minimize Large Pores: A Complete Skincare Guide Elvish Yadav Backs AstroReal as His Trusted Companion GM Modular Launches Smart Living Studio in Lucknow, Strengthens North India Presence Sagebrook International School Sets a New Standard for Family-Centred Education With Hyderabad’s First On-Campus Parent Café and Co-Working Lounge Dachser grows despite economic headwinds Voltavate’s Manufacturing Breakthrough Gains ARENA Backing to Transform Battery Production at Scale MF Bharat Announces Leadership Expansion to Accelerate its Vision RAJIV GANDHI INSTITUTE OF PETROLEUM TECHNOLOGY (RGIPT)Bengaluru Campus Merck Foundation Chairman and CEO meet Gabon First Lady to launch their long-term partnership to advance healthcare and support girls’ education Risen Energy Secures 1.2GW HJT Module Order from China Huaneng Group, Demonstrating Industry Leadership Hexaware Brings Back Chennai’s Favorite Half Marathon SeedlingLabs Launches Orchard and Sprout, Expanding AI-Native Execution to Software Testing and Education Deakin University and Smart Energy Council Bring Australian Expertise to Power India’s Solar Workforce Revolution Online LPG Bookings Surge to 98%, Reflecting Rising Consumer Trust as Government of India Strengthens Enforcement Drive Ailoitte Bets Big on AI-First Engineering: Introduces AI Velocity Pods for 3x Faster Product Delivery Gupshup Launches Superagent: the Autonomous AI Agent for Customer Conversations at Scale Reliance Digital Enters Final Days of Digital Discount Days Offering Buy 1, Get 50% Off on Second Product and Much More Blaize Announces Expected First Quarter 2026 Revenue and Newly Awarded Contract with NeoTensr Anticipated to Generate $50.0 Million in Revenue GSMA Report Urges Japan to Take Bold Action to Convert Technical Excellence into Global Digital Leadership Hanshow Completes Full Acquisition of HARB Data to Enhance AI‑Driven Data Services Capabilities Adrianse Rebrands as Design Alphabet, Signalling a New Era of Integrated Design Panigrahi Bethi’s ‘The Greatest Battle of Culture’ Reimagines the Untold Story of Ancient India Nutro Life Science to Establish World’s First Robotic Sports Nutrition Manufacturing Plant in Ludhiana by December 2026 CZ Releases Freedom of Money, a Memoir Reflecting on the Rise of Crypto and the Story Behind Binance Brand Loyalty Reimagined: How Encalm Transforms Airport Lounges into Strategic Engagement Hubs Too Yumm! unveils Korean Karare with a campaign featuring Varun Dhawan TECNO Drops CSK Stars Into a No-Network Fix and Flips the Script With POVA Curve 2 Ducati India Ignites Centenary Celebrations With Exclusive DRE Track Day for Ducati Owners, Stunt Spectacle by Official Ducati Stunt Rider Emilio Zamora at Buddh International Circuit HR Symposium 2026: Inspiring the Next Generation of Industry-Ready Professionals
Relief for commuters: Bengaluru’s first double-decker met...
2026-04-27 · via Latest Brandhub News | The HinduBusinessLine

BENGALURU, India, April 25, 2026 /PRNewswire/ -- With flyovers D and E now opened for operational traffic, all five flyovers of the Central Silk Board double-decker flyover are operational. The flyover, South India’s first road-cum-rail structure, has brought long-awaited relief to thousands of commuters. Afcons Infrastructure Ltd. has constructed the five flyovers as part of its larger contract for elevated metro project along the Outer Ring Road and Central Silk Board junction.

“The Central Silk Board flyover stands as a testament to engineering excellence in the face of extraordinary complexity. Building a five-level structure amid Bengaluru’s second busiest junctions required precision, perseverance and innovation. With all flyovers set to be operational, we are proud to deliver not just infrastructure, but meaningful relief to lakhs of commuters every day,” said Krishnamurthy Subramanian, Executive Chairman, Afcons Infrastructure Ltd.

As part of the Blue Line, Afcons Infrastructure Limited is constructing the 9.8 km elevated section of Bengaluru Metro’s Silk Board–KR Puram (Phase 2A) project, which includes decongestion at Central Silk Board junction.

D. Murugadasan, Executive Vice-President (divisional head) at Afcons, said that due to heavy traffic at the junction for most of the day, space constraints with clusters of existing and ongoing flyovers and metro structures, works have to be planned and executed in a sequential manner, construction activity could be carried out only for five hours in a day, between 12 am and 5 am at mid night.

“All five flyovers are now operational, Commuters can save at least 30 minutes of travel time. Of the five flyovers, Flyover D is the tallest at 28 metres. It is at the fifth level, crossing the existing Hosur flyover, the Yellow Line metro and the double-decker flyover. Despite heavy traffic volumes and confined working space due to existing Rajakaluve on one side and 3 operational flyovers (Hosur flyover, Flyover A & Flyover C) and under construction CSB station (blue line) the team successfully completed all flyovers with precision,” said Ambareesh, Project Manager.

The Central Silk Board junction is the city’s second-most congested traffic point after Hebbal and the construction of flyovers A, B, C, D & E together spanning 3.2 km has decongested the traffic at the junction. Three flyovers (A, B and C) were opened in mid-2024 to ease travel from Ragigudda and BTM towards HSR Layout and Electronic City by bypassing the Silk Board signal.

With the remaining two flyovers (D and E) now operational, commuters from HSR to BTM can bypass Silk Board entirely. The signal will henceforth mainly serve HSR–Madivala and Electronic City–HSR traffic, bringing major relief from congestion.

BOX

The flyover system includes:

Flyover A: Ragigudda Metro Station to Hosur Road

Flyover B: BTM Layout to Hosur Road and HSR Layout via Flyover A

Flyover C: Branch from Flyover A towards HSR Layout

Flyovers D & E: Newly opened, from HSR Layout to Ragigudda, with a down flyover for BTM Layout.

About Afcons Infrastructure Ltd

Afcons Infrastructure Ltd is flagship infrastructure engineering and construction company of the Shapoorji Pallonji Group. It has a legacy of over six decades, with strong track record of executing numerous technologically complex EPC projects both within India and internationally. As per the latest ENR survey, Afcons is ranked in Top 140 international Contractors globally; 12th in Bridges and 8th in Marine & Ports.

“This is a company press release that is not part of editorial content. No journalist of The Hindu businessline was involved in the publication of this release.”

Published on April 27, 2026