惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

J
Java Code Geeks
博客园 - 聂微东
人人都是产品经理
人人都是产品经理
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
博客园_首页
量子位
阮一峰的网络日志
阮一峰的网络日志
酷 壳 – CoolShell
酷 壳 – CoolShell
H
Hackread – Cybersecurity News, Data Breaches, AI and More
云风的 BLOG
云风的 BLOG
D
DataBreaches.Net
B
Blog
L
LangChain Blog
Apple Machine Learning Research
Apple Machine Learning Research
Vercel News
Vercel News
博客园 - 三生石上(FineUI控件)
爱范儿
爱范儿
Microsoft Azure Blog
Microsoft Azure Blog
IT之家
IT之家
aimingoo的专栏
aimingoo的专栏
B
Blog RSS Feed
H
Help Net Security
The Cloudflare Blog
U
Unit 42

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
BJP criticises State govt. over delays in Godavari basin ...
2026-05-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
N. Ramchander Rao

N. Ramchander Rao | Photo Credit: SIDDHANT THAKUR

BJP Telangana unit president N. Ramchander Rao accused the State government of adopting a ‘non-serious attitude’ towards the planning and implementation of irrigation projects in the Godavari basin and stressed the need to ensure optimal utilisation of the waters allocated to Telangana.

In a letter dated May 23, addressed to Chief Minister A. Revanth Reddy, Mr. Rao said Telangana was entitled to about 968 TMC of assured Godavari waters, but continued to face underutilisation due to delays in the restoration and completion of key irrigation projects. He criticised the government for delays in rehabilitation measures related to the damaged barrages of the Kaleshwaram Lift Irrigation Project (KLIP).

“The Congress government has not completed the tests recommended by NDSA in time, resulting in delays in restoring the barrages of the KLIP and affecting the utilisation of nearly 200 TMC of Godavari waters,” he said. He further flagged the alleged delays in the execution of the Sita Rama Lift Irrigation Project in Khammam.

He claimed that the delay was depriving Telangana of the utilisation of 67 TMC of allocated waters. He also alleged that the State government had failed to properly identify the command area, delaying approvals for the Sammakka-Sarakka Barrage. “The Central Water Commission (CWC) granted hydrological clearance for utilisation of 47 TMC,” Mr. Rao said, claiming that the Union government had cleared several irrigation projects in Telangana after the State’s formation.

“Projects accounting for nearly 360 TMC of Godavari waters have received approvals from the Centre,” the BJP leader said.

Regarding the proposed Godavari-Cauvery River interlinking project, he raised concerns over reported discussions on altering the alignment and source location from Icchampalli. “Any such changes could adversely affect Telangana’s interests and hamper proper utilisation of the State’s assured Godavari waters,” he added.

Published - May 24, 2026 08:23 pm IST