惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

U
Unit 42
Microsoft Azure Blog
Microsoft Azure Blog
Engineering at Meta
Engineering at Meta
博客园 - 【当耐特】
人人都是产品经理
人人都是产品经理
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
WordPress大学
WordPress大学
有赞技术团队
有赞技术团队
Blog — PlanetScale
Blog — PlanetScale
酷 壳 – CoolShell
酷 壳 – CoolShell
aimingoo的专栏
aimingoo的专栏
Jina AI
Jina AI
小众软件
小众软件
博客园 - 叶小钗
MongoDB | Blog
MongoDB | Blog
大猫的无限游戏
大猫的无限游戏
博客园 - 聂微东
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
I
InfoQ
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Martin Fowler
Martin Fowler
P
Proofpoint News Feed
MyScale Blog
MyScale Blog

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Plan to provide 24/7 drinking water supply likely to run ...
2026-05-12 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Implementation of a plan to provide 24x7 drinking water supply in the city is likely to be delayed further.

It was one of the long-pending schemes of Tiruchi Corporation. Since it had an installed capacity of more than 150 MLD of water from the sources on the riverbeds of the Cauvery and the Kollidam, the civic body planned to introduce a scheme to supply 24x7 to the residents. A sum of ₹38.49 crore was allotted to the scheme under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT). The project is funded through contributions of ₹11.54 crore from the Centre, ₹10.39 crore from the State government, and ₹16.56 crore from the Tamil Nadu Urban Development Fund (TNUDF).

The pilot scheme covers Ward Nos. 51 to 56, including areas such as Cantonment, Railway Junction, Ponnagar, Jaya Nagar, Viswas Nagar, Karumandapam, and IOB Colony. It was proposed to supply 19.51 million litres per day (MLD) of drinking water to a population of 1,25,902 residents.

According to sources, it was proposed to cover both domestic and commercial connections under the pilot scheme, with smart meters being installed along with new connections. So far, around 7,000 household connections have been provided, and connections are being extended to residents in Jaya Nagar Extension and Krishnan Kovil Street.

Laying of water pipelines for 100.69 km, installation of ductile iron pipelines in various areas including McDonalds Road, Melapudur and Marasingpettai, construction of a new overhead tank with a capacity of five lakh litres at Nakshatra Nagar were among the components of the project. Installation of smart meters to the households and establishing Supervisory Control and Data Acquisition (SCADA) to digitally monitor the drinking water supply was among the important aspects of the project.

It was expected that the project would be commenced before March. However, the work of various components of the project is still ongoing.

When contacted, Corporation Commissioner L. Madhubalan told The Hindu that about 80% works on the project had been completed so far. Steps were taken to complete all works as early as possible. The commissioning of the project was not possible in summer as the priority was to ensure regular supply to the residents. It might be possible in October or November. Officials had been given instruction to complete all works so as to commission the project in the north-east monsoon season. 

Published - May 12, 2026 06:39 pm IST