惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
H
Help Net Security
Jina AI
Jina AI
V
V2EX
G
Google Developers Blog
B
Blog
GbyAI
GbyAI
U
Unit 42
爱范儿
爱范儿
腾讯CDC
Engineering at Meta
Engineering at Meta
酷 壳 – CoolShell
酷 壳 – CoolShell
博客园 - 三生石上(FineUI控件)
宝玉的分享
宝玉的分享
小众软件
小众软件
D
DataBreaches.Net
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - Franky
博客园 - 聂微东
The Cloudflare Blog
I
InfoQ
Microsoft Azure Blog
Microsoft Azure Blog
Hugging Face - Blog
Hugging Face - Blog
大猫的无限游戏
大猫的无限游戏

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Successive govts failed to speed up work on irrigation pr...
The Hindu Bureau · 2026-06-18 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Mohan Kataraki, senior advocate in the Supreme Court, speaking at a discussion with Kannada organisations in Belagavi on June 17, 2026.

Mohan Kataraki, senior advocate in the Supreme Court, speaking at a discussion with Kannada organisations in Belagavi on June 17, 2026. | Photo Credit: SPECIAL ARRANGEMENT

Successive governments in Karnataka have failed to speed up work on pending irrigation projects in the Krishna and Cauvery basins, according to Mohan Kataraki, senior advocate in the Supreme Court.

“The State Government should take up immediate steps to release money and speed up the work in both regions. Failure to do so, may be seen by other riparian States as forfeiting the right over the allotted quantum of water,” he said in a discussion with leaders of Kannada organisations in Belagavi.

“The judgments of various courts and tribunals have allotted around 170 tmcft of water to the Krishna basin and 50-60 tmcft of additional water to the Cauvery basin projects. However, we have not been able to utilise this allocation by preparing suitable projects and investment. It is estimated that around ₹1 lakh crore will be required to complete the Upper Krishna Project, and around ₹1 lakh crore for the Cauvery basin projects. However, the governments of various parties over the decades have not been spending the requisite amount of money on these projects. The total allocation to the department of irrigation is around ₹20,000 crore to ₹30,000 crore per year, while the annual budget is around ₹4 lakh crore. We need to spend at least double the amount of money spent on these major irrigation projects in the next few years,” he argued.

He said that there needs to be a balance between providing drinking water to the drier parts of northern Karnataka and environment conservation. “We cannot forego environmental concerns while executing projects that provide water to the people or for agriculture needs. All relevant factors need to be taken into consideration before designing such projects,” he said.

Mr. Kataraki said that the Mahadayi basin projects were stuck over delay in Karnataka obtaining environmental clearances from various Central agencies and ministries. He said that the Union Government had taken cognisance of an order issued by the Chief Wild Life Warden of Goa to the Karnataka government asking them not to divert water reaching wildlife sanctuaries in Goa. “This order was patently illegal, as he has no jurisdiction over Karnataka. But the order has been taken seriously, and we are unable to move forward,” he said.

He argued for a dialogue between opposing views on Mahadayi — one rooted in environmental concerns, and another in irrigation and drinking water needs — to be able to move forward.

There was opposition to the Harangi dam in Kodagu district from environmentalists. Then, an informal ‘Thus far, no further’ agreement was reached between the people of Kodagu district and the Karnataka government. No other dam project was planned there, he said.

Published - June 18, 2026 12:22 pm IST