惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Y
Y Combinator Blog
MyScale Blog
MyScale Blog
Recent Announcements
Recent Announcements
酷 壳 – CoolShell
酷 壳 – CoolShell
GbyAI
GbyAI
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
N
Netflix TechBlog - Medium
V
V2EX
MongoDB | Blog
MongoDB | Blog
Microsoft Security Blog
Microsoft Security Blog
博客园 - 三生石上(FineUI控件)
Stack Overflow Blog
Stack Overflow Blog
U
Unit 42
B
Blog
Microsoft Azure Blog
Microsoft Azure Blog
博客园_首页
H
Help Net Security
D
DataBreaches.Net
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
阮一峰的网络日志
阮一峰的网络日志
T
The Blog of Author Tim Ferriss
C
Check Point Blog
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Metro Rail to submit project report of Light House-Madras...
Sunitha Sekar · 2026-06-16 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The Light House to Madras High Court stretch will have four stations—Ezhilagam, Island Grounds, Secretariat, and Madras High Court.

The Light House to Madras High Court stretch will have four stations—Ezhilagam, Island Grounds, Secretariat, and Madras High Court. | Photo Credit: B. JOTHI RAMALINGAM

Chennai Metro Rail has completed the Detailed Project Report (DPR) for the extension lines from Light House to Madras High Court and will submit it to the Tamil Nadu government shortly.

Chennai Metro Rail had floated bids in March last year looking for a consultant to prepare the DPR and subsequently, in June, Systra MVA Consulting (India) Pvt. Ltd. bagged the contract for this project. Sources said the DPR was completed recently, and they plan to hand over the document to the State government within a week for its approval.

The Light House to Madras High Court stretch will be a 5.69-km underground stretch comprising four stations in between—Ezhilagam, Island Grounds, Secretariat, and Madras High Court.

The estimated cost of this project is ₹4,300 crore.

Light House, which is under construction as part of the 118.9-km phase II project, will serve as one of the key terminal stations. This station is part of the 26.1-km East-West corridor, which starts at Poonamallee and terminates at Light House after crossing some of the core areas, including Valasaravakkam, Vadapalani, Kodambakkam, T. Nagar, Nandanam, Boat Club, Alwarpet, and Thirumayilai.

If the Light House-Madras High Court stretch is approved by the State and Centre and becomes operational, it could be an extension of the corridor 4 and benefit lakhs of people.

“Several government employees are employed at both Secretariat and Ezhilagam. Island Grounds is one of the important exhibition spaces in the city visited by many. So, commuters will stand to gain hugely from Chennai Metro Rail connectivity to these three locations,” a source said.

It has been planned underground since it is an extension of the already existing line underground stretch.

Prasanna Kumar who is employed at Ezhilagam said, such an extension will help people like him to commute to workplace and the Secretariat. “I have had to frequently travel from Ezhilagam to Secretariat. Currently, I have to take a bus. But if metro connectivity comes through, it will be far more convenient for many like me,” he added.

Published - June 16, 2026 05:00 am IST