惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Stack Overflow Blog
Stack Overflow Blog
T
Tailwind CSS Blog
Recent Announcements
Recent Announcements
宝玉的分享
宝玉的分享
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
P
Proofpoint News Feed
D
Docker
Google DeepMind News
Google DeepMind News
aimingoo的专栏
aimingoo的专栏
B
Blog RSS Feed
Microsoft Security Blog
Microsoft Security Blog
博客园 - 【当耐特】
M
MIT News - Artificial intelligence
云风的 BLOG
云风的 BLOG
小众软件
小众软件
Hugging Face - Blog
Hugging Face - Blog
WordPress大学
WordPress大学
IT之家
IT之家
H
Help Net Security
Apple Machine Learning Research
Apple Machine Learning Research
Martin Fowler
Martin Fowler
S
SegmentFault 最新的问题
B
Blog
D
DataBreaches.Net

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
DPR for ₹21,000-crore NH 744 development submitted for fi...
2026-05-22 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

The Detailed Project Report (DPR) for the comprehensive development of the Kadambattukonam-Senkottai National Highway 744, with a massive estimated outlay of ₹21,000 crore, has been submitted to the Ministry of Road Transport and Highways for final approval following rigorous technical reviews, N.K. Premachandran, MP, has said after a high-level discussions in New Delhi.

The ₹21,000-crore mega infrastructure project spans three key reaches, two of which run through Kerala. These include the second reach connecting Senkottai to Edamon and the third reach stretching from Edamon to Kadambattukonam, while the first reach from Rajapalayam to Senkottai is located in Tamil Nadu. “A minor portion of the alignment running through the second reach required environmental clearance, and the Terms of Reference (ToR) for the same have already been officially approved,” said the MP.

The 23-km Senkottai-Edamon section is estimated to cost ₹10,033 crore and features a highly sophisticated alignment designed to bypass steep gradients and sharp, treacherous curves. To minimise environmental and ecological impact on the surrounding forest land, the alignment includes four major tunnels passing through rocky terrain, covering a combined distance of 10.5 km. Additionally, the blueprint for this segment incorporates elevated highways built across twenty massive pillars.

The third reach, covering the 39-km distance from Edamon to Kadambattukonam, has an estimated budget of ₹7,015 crore. Recognising the unique soil characteristics and terrain topography, engineers have planned 26 viaducts for this stretch. This strategic structural shift was decided after analysing previous safety hazards where heavy soil filling and earthen retaining walls led to severe landslides. To guarantee long-term safety, elevated pillar structures will be constructed in all areas where the soil quality is deemed weak.

The engineering design of the project is currently set to undergo close scrutiny by the Project Appraisal Technical Committee. Once their technical recommendations are integrated, the finalised draft will be forwarded to the Public-Private Partnership Appraisal Committee (PPPAC), a panel chaired by the Secretary of Economic Affairs and comprising the Secretaries of Law, Expenditure, Road Transport and Highways, along with the CEO of NITI Aayog. Upon receiving the definitive recommendation from the PPPAC, the project will be presented to the Union Cabinet for final administrative sanction.

Published - May 22, 2026 06:40 pm IST