惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
DataBreaches.Net
有赞技术团队
有赞技术团队
Jina AI
Jina AI
H
Help Net Security
D
Docker
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
Blog — PlanetScale
Blog — PlanetScale
Hugging Face - Blog
Hugging Face - Blog
罗磊的独立博客
MyScale Blog
MyScale Blog
N
Netflix TechBlog - Medium
B
Blog RSS Feed
Martin Fowler
Martin Fowler
WordPress大学
WordPress大学
T
The Blog of Author Tim Ferriss
U
Unit 42
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
MongoDB | Blog
MongoDB | Blog
美团技术团队
M
MIT News - Artificial intelligence
阮一峰的网络日志
阮一峰的网络日志
博客园 - 司徒正美
Microsoft Security Blog
Microsoft Security Blog
IT之家
IT之家

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
68% of flyover on Chennai’s Anna Salai completed despite ...
Deepa H. Ramakrishnan · 2026-05-24 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
Sources in the State Highways Department say that of 131 decks, 32 are in place.

Sources in the State Highways Department say that of 131 decks, 32 are in place. | Photo Credit: RAGHUNATHAN SR

Nearly 68% of the project to construct the 3.2-km-long flyover from Saidapet to Teynampet on Anna Salai has been completed.

Slabs have been placed on the girders for a length of 1.1 km and 98% of the foundation work for the pillars is ready.

Sources in the State Highways Department said that 32 of the 131 decks are in place. “We are working to place eight more by this month-end. Most of the structures are pre-cast in Maharashtra, Goa, and Hyderabad,” said an engineer associated with the project, which is slated to be completed by September this year.

The project has had its share of delays due to the war and elections. “We were hit by high fuel prices. The fabrication process lost its steam due to labour shortage. Men moved to their native towns to vote. Now those working at the site and in fabrication units have returned. We hope to finish on schedule,” another source added.

This is perhaps the only project in the county where a flyover is being built over a pair of Metrorail tunnels. Of the 32 decks over the tunnels, 13 have been successfully launched. Each deck slab is 30 m long.

The approach ramp on the Saidapet side and the crash barriers has been completed.

At the two points where the CMRL stations are located — Teynampet and Nandanam — reinforcement bars have already been provided along the diaphragm walls. These have been tested for strength. Of the 42 pedestals, 12 are ready.

C. Sarathy, of Triplicane, said that at points where bus stops are located along the work sites, temporary shelters must be provided.

“At some places, water falls from above. Precautions must be taken to prevent such incidents,” he said.

Published - May 24, 2026 12:40 am IST