惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
Docker
阮一峰的网络日志
阮一峰的网络日志
T
Tailwind CSS Blog
博客园 - 【当耐特】
量子位
博客园 - 叶小钗
有赞技术团队
有赞技术团队
Jina AI
Jina AI
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
博客园 - Franky
博客园 - 司徒正美
爱范儿
爱范儿
美团技术团队
小众软件
小众软件
酷 壳 – CoolShell
酷 壳 – CoolShell
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
V
V2EX
罗磊的独立博客
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Last Week in AI
Last Week in AI
Hugging Face - Blog
Hugging Face - Blog
I
InfoQ
D
DataBreaches.Net
宝玉的分享
宝玉的分享

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
CM makes strong pitch with Union govt. for approval of Me...
2026-05-06 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Chief Minister A. Revanth Reddy requested the Central government to give its approval for the Hyderabad Metro Rail phase-II.

The State government has already submitted the comprehensive detailed project report of the second phase of the Metro Rail project comprising seven corridors and was awaiting the approval from the Union government. The Chief Minister who is in the national capital on Wednesday made the request during a meeting with Union Urban Affairs Minister Manoharlal Khattar. He explained to the Union Minister about the salient features of the second phase of the metro rail and said the expansion of the Metro Rail through second and third phases was proposed in view of the significant growth witnessed in Hyderabad.

He briefed Mr. Khattar about the State government taking over the metro rail operations and said the government took over the mass transport system to pave the way for taking up expansion of the remaining phases in a hassle-free manner. “Since the first phase is under full control of the State government, works on the second and third phases can be taken up,” he said.

The Chief Minister explained that the second phase of the metro project involved development of seven corridors spanning 122.9 km with an estimated project cost of ₹38,595 crore and a detailed report had been submitted to the Centre already. The Union government should accordingly give permission at the earliest allowing the second phase as a joint venture project between the State and Central governments.

Mr. Revanth Reddy requested Mr. Khattar to take up the corridor connecting the Rajiv Gandhi International Airport and Bharat Future City, designed keeping in view the requirements of the future, in the third phase. The government had submitted the DPR of the project and was awaiting its approval.

Published - May 06, 2026 07:03 pm IST