惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

有赞技术团队
有赞技术团队
M
MIT News - Artificial intelligence
Hugging Face - Blog
Hugging Face - Blog
博客园 - 聂微东
量子位
S
SegmentFault 最新的问题
V
Visual Studio Blog
博客园 - 【当耐特】
Apple Machine Learning Research
Apple Machine Learning Research
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
小众软件
小众软件
Stack Overflow Blog
Stack Overflow Blog
Vercel News
Vercel News
D
Docker
J
Java Code Geeks
博客园 - 三生石上(FineUI控件)
博客园 - Franky
Recent Announcements
Recent Announcements
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
MongoDB | Blog
MongoDB | Blog
D
DataBreaches.Net
Y
Y Combinator Blog
云风的 BLOG
云风的 BLOG
V
V2EX

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
KPTCL can’t hike supervision charges for self-executed el...
The Hindu Bureau · 2026-06-26 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.
The petitioner had contended that the demand of ₹1.02 crore, based on a unilateral decision of the KPTCL to increase the supervision charges, violated the regulatory framework that capped such charges at ₹15 lakh.

The petitioner had contended that the demand of ₹1.02 crore, based on a unilateral decision of the KPTCL to increase the supervision charges, violated the regulatory framework that capped such charges at ₹15 lakh.

The High Court of Karnataka has ruled that the Karnataka Power Transmission Corporation Limited (KPTCL) lacked statutory authority to increase or revise supervision charges for self-executed electrical works without the statutory approval from the Karnataka Electricity Regulatory Commission (KERC).

Justice Ravi V. Hosmani passed the order while allowing a petition filed by Anushka Realty Inc., which had challenged the KPTCL’s June 2018 demand for payment of ₹1.02 crore as supervision charges for approving an 8459 KW power supply project, which was being undertaken under self-execution mode by the petitioner.

The petitioner had contended that the demand of ₹1.02 crore, based on a unilateral decision of the KPTCL to increase the supervision charges, violated the regulatory framework that capped such charges at ₹15 lakh.

The court rejected the KPTCL’s defence that the revision was an “administrative measure”, emphasising that a levy affecting consumer liability requires statutory backing.

“The levy of supervision charges affecting consumers and prescribing monetary liability cannot be regarded as purely administrative action, when Section 45 of the Electricity Act, 2003 stipulated procedure for such fixation,” the court pointed out.

Citing Sections 39 to 46 of the Act, the court said these provisions of law define the KPTCL’s role in transmission planning but do not confer power to determine or revise charges for supervising self-execution works. Only the KERC holds the authority to frame regulations under Section 181 of the Act, the court made it clear.

While quashing the KPTCL’s demand for ₹1.02 crore, the court directed it to permit the petitioner to complete the work on self-execution basis by paying charges as per the original regulatory cap, and refund excess payment made, if any, has to be refunded with 8% interest per annum.

Published - June 26, 2026 12:27 am IST