惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

美团技术团队
T
The Blog of Author Tim Ferriss
月光博客
月光博客
阮一峰的网络日志
阮一峰的网络日志
Engineering at Meta
Engineering at Meta
量子位
I
InfoQ
Jina AI
Jina AI
Microsoft Security Blog
Microsoft Security Blog
H
Help Net Security
H
Hackread – Cybersecurity News, Data Breaches, AI and More
G
Google Developers Blog
J
Java Code Geeks
Recent Announcements
Recent Announcements
aimingoo的专栏
aimingoo的专栏
小众软件
小众软件
V
V2EX
腾讯CDC
P
Proofpoint News Feed
A
About on SuperTechFans
爱范儿
爱范儿
U
Unit 42
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
Last Week in AI
Last Week in AI

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Remaining stretch of Mullassery canal to be restored with...
2026-05-07 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

The agreement for restoring the remaining 175-metre stretch of the Mullassery Canal under Operation Breakthrough, at an estimated cost of ₹4.80 crore, is expected shortly.

The Minor Irrigation department may have to complete the work in six to eight months using pre-cast technology, depending on the weather. Despite the forecast of the onset of the monsoon later this month, work will begin once the agreement is signed, whenever conditions permit.

Of the canal’s 829-metre length, the stretch up to Chittoor Road was restored last September using the cast-in-situ method, where concrete structures are cast at the site. With delays already dogging the project, the department has opted for pre-cast technology to avoid further setbacks and prolonged road closures. Under this system, structures will be cast off-site and installed immediately, eliminating extended excavation.

The remaining stretch will be restored in three phases: from Chittoor Road to M.G. Road, M.G. Road crossing along the metro pillar, and the final 34 metres along A.K. Seshadri Road. Road blockages will be minimal, and the excavated stretch will be restored with interlocking tiles, department sources said.

Since completion is unlikely before the monsoon, waterlogging is expected on stretches including near the KSRTC bus stand. Efforts will be made to minimise impact by pumping out water.

A review meeting on Operation Breakthrough works ahead of the monsoon allocated funds for shifting underground cables and facilitating restoration. Chaired by the District Collector, the meeting directed officials to ensure relief camps with basic facilities, cut dangerous tree branches, and remove unauthorised boards.

Local bodies were asked to ensure that tahsildars have ready access to equipment such as earthmovers, cranes, and ambulances, and to update resource and relief camp data in Google Sheets by May 25. Timely warnings must be given to fishermen in sea surge-prone areas, and the Fisheries department has been asked to keep rescue boats ready. The Public Works department was directed to take precautions against waterlogging on highways and other roads.

Meanwhile, the Kochi Corporation has begun cleaning major canals, including the Thevara-Perandoor Canal. After last year’s experiment of entrusting major canal cleaning to the Minor Irrigation department, the Corporation has resumed responsibility this year. “Cleaning of smaller canals is almost 90% complete. Work on bigger canals is under way, though challenging due to heavy sedimentation in the Vembanad lake,” said T.K. Asharaf, chairperson of the Corporation’s works standing committee.

Published - May 07, 2026 08:19 pm IST