惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

L
LangChain Blog
Recent Announcements
Recent Announcements
GbyAI
GbyAI
H
Hackread – Cybersecurity News, Data Breaches, AI and More
Microsoft Azure Blog
Microsoft Azure Blog
N
Netflix TechBlog - Medium
人人都是产品经理
人人都是产品经理
MongoDB | Blog
MongoDB | Blog
D
DataBreaches.Net
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
WordPress大学
WordPress大学
U
Unit 42
腾讯CDC
D
Docker
The GitHub Blog
The GitHub Blog
阮一峰的网络日志
阮一峰的网络日志
Vercel News
Vercel News
I
InfoQ
Jina AI
Jina AI
爱范儿
爱范儿
宝玉的分享
宝玉的分享
博客园 - Franky
G
Google Developers Blog
P
Proofpoint News Feed

The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

U.K. pauses its plan to cede Chagos Islands after U.S. opposition Driver jailed for 7 days for driving sleeper bus in drunken condition Kim Jong Un supports China’s “multipolar world” vision during talks with Wang Yi Uttar Pradesh boat tragedy: Punjab town mourns deaths Relief for Bengaluru commuters as Silk Board flyover set to open fully, but inspection by BTP reveals likely bottleneck Repolling underway at booth of Karimganj North Assembly seat in Assam PM Modi interacts with Rahul Gandhi as leaders gather to pay tribute to Mahatma Jyotiba Phule Anil Kapoor’s ‘24’ set to release on OTT Vance, Iranian delegation arrives in Islamabad for U.S. talks amid ceasefire hopes Fire at Hyderabad’s Chintal Basti apartment, 17 residents evacuated safely Centre nudges States to view farm solarisation as a route to wiping off ₹2.4 lakh crore subsidy bill Why voter turnout hit record highs in Assam, Kerala & Puducherry Strait of Hormuz to be open “fairly soon”, says Trump ‘Jana Nayagan’ leak tests new legal penalties, torrent downloads under scanner Vijay’s ‘Jana Nayagan’ controversy explained: From legal battles to piracy chaos HYDRAA brings down guest house and other structures at Ameenpur Row erupts over removal of Ambedkar statue at midnight in Secunderabad Cantonment area Nitish may resign as Bihar CM on April 13; son Nishant likely to become one of two JD(U) Dy CMs Police open fire on youth while he was trying to flee Struggling CSK look to snap their losing streak | Vidyut Sivaramakrishnan ED raids former Trinamool Minister Partha Chatterjee’s residence Karnataka’s Gruha Jyothi scheme dimmed the scope of PM’s Surya Ghar Muft Bijli Yojana: KRESMA After Artemis II, NASA looks to SpaceX, Blue Origin for Moon landings Ayush Shetty storms into Badminton Asia Championships final Scholarships: April 11, 2026 Andhra Pradesh’s Socio-Economic Survey missing in recent Budget Session; efforts underway Inside Péro’s fun office Penciljam sessions in Bengaluru help hone artistic talent Watch: The mistake killing high-concept films | Escalation without calibration | FMM 19 Tamil Nadu Assembly election 2026: DMK demands reinstatement of N. Muruganandam as Chief Secretary
Residents complain about delay in completing civic infras...
Aloysius Xavier Lopez · 2026-05-31 · via The Hindu: Latest News today from India and the World, Breaking news, Top Headlines and Trending News Videos.

Residents have complained about incomplete civic infrastructure projects in various zones of the city. 

As the next three-month period is crucial for expediting infrastructure projects ahead of the onset of the northeast monsoon in the city, residents have pointed to a delay in resuming work after the Assembly election. Many of the delayed projects have not yet gained momentum even after the Model Code of Conduct was lifted on May 6.  

Madipakkam resident G. Swaminathan said the road relaying work in southern parts of the city has not started after the election. “Important roads such as Madipakkam Kuberan Nagar Extension 12th Street and Govindasamy Nagar Main Road have been in bad shape for many years. Two years ago, they started digging the road to lay sewer pipelines. Then they carried out patch work. Later, they dug up the road for water pipelines. Chennai Corporation officials said they would relay the road after the monsoon in 2025. But the work has been delayed,” said Mr. Swaminathan.

Federation of North Chennai Residents Welfare Associations president K. Shanmugham said the residents complained about polluted drinking water in 33 areas, including Perambur and Vyasarpadi owing to mixing of sewage in the drinking water. “The work was sanctioned in areas such as Gandhi Nagar in Ward 35 and Everready Colony in ward 34. The civic agencies should complete the work and GCC should relay the road before the northeast monsoon,” he said.

Residents complained about the slow pace of work in Ganesapuram Bridge and demanded that the Chennai Corporation complete the work ahead of the onset of the Northeast monsoon this year. The bridge was announced in 2022 to ease traffic congestion and improve transport connectivity in north Chennai.

S. Saravanan, a trader in north Chennai, said: “We sent an email to the Commissioner after the new government was formed. Even though there has been an improvement in the pace of work, the officials have also reportedly indicated that the bridge might be completed only after the northeast monsoon. We want the work to be completed before the northeast monsoon. Even after the Ganesapuram bridge is completed, the GCC has not planned any road widening to ease bottlenecks for traffic.”

Ward 35 Councillor S. Jeevan said civic infrastructure work, including a ration shop with the Councillor fund in Muthamizh Nagar has been delayed because an assistant executive engineer of Chennai Corporation was not allowing the contractor to execute the work. “Before the election, the official asked the contractor to do the work after the election. Even after the election, the official concerned is not allowing the contractor to execute the work,” said Mr. Jeevan.

Chennai Corporation officials said all the civic infrastructure projects will be expedited before the northeast monsoon.

Published - May 31, 2026 05:30 am IST