惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Blog — PlanetScale
Blog — PlanetScale
J
Java Code Geeks
月光博客
月光博客
Engineering at Meta
Engineering at Meta
WordPress大学
WordPress大学
Jina AI
Jina AI
小众软件
小众软件
U
Unit 42
云风的 BLOG
云风的 BLOG
Stack Overflow Blog
Stack Overflow Blog
雷峰网
雷峰网
博客园 - Franky
Microsoft Security Blog
Microsoft Security Blog
罗磊的独立博客
宝玉的分享
宝玉的分享
B
Blog
C
Check Point Blog
爱范儿
爱范儿
奇客Solidot–传递最新科技情报
奇客Solidot–传递最新科技情报
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
量子位
阮一峰的网络日志
阮一峰的网络日志
Vercel News
Vercel News
酷 壳 – CoolShell
酷 壳 – CoolShell

Health, Aviation, Automobiles, Entrepreneurs, India, Technology, Luxury | The HinduBusinessLine

How to retire financially secure APTEL’s judgement is a wakeup call for discoms For a partial exit via a secondary, timing and context matter After a lull, why temperature spikes are likely to intensify in north India JAL insolvency sees corporate titans cross swords Putting planet earth on livestream We channel savings to build infra: NaBFID chief Rajkiran Rai Power regulator’s nudge towards ‘market coupling’ Cruising towards Indian carbon market Backing India’s next phase of industrial growth Wealth-tech Sherpas for financial goals New hope at HOEC GST reform is sweet news for Perfetti Van Melle India Faired Play Yamaha's Aerox EC-06: Off the mark Lenovo Legion 5 review: Slim profile, serious gaming muscle The ultra-quick marathon runner Inside India’s GLP-1 rush Stalling the silent spread of TB cases Meditation, play and staying curious Towards a malaria-free future Don’t hide unfavourable clinical trial results: FDA Countries take more ownership of immunisation Medical supply chain leaks: Where does the buck stop? Feature-rich, bass-heavy Comfortingly familiar? India credit funds shrug off US blues What an Oracle foretells about jobs and careers in the AI era Less engaged workforce Renewable energy ministry approves pilot CfD scheme
What is slowing residential rooftop solar installations
By M Ramesh · 2026-03-16 · via Health, Aviation, Automobiles, Entrepreneurs, India, Technology, Luxury | The HinduBusinessLine

With just a year left before its scheduled closure, the Prime Minister Surya Ghar Muft Bijli Yojana has achieved only about 25 per cent of its target, with 25.75 lakh residential rooftop solar installations so far.

The scheme, launched in February 2024, provides subsidies for one crore residential rooftop solar installations of up to 3 kW and is scheduled to close in March 2027. The installations achieved so far have consumed about 24 per cent of the ₹75,000 crore allocated for subsidies.

The scheme also aims to create 30 GW of residential rooftop solar capacity, but installations so far add up to only 9.4 GW (as of March 11). Incidentally, the country’s total rooftop solar capacity (residential and industrial/commercial) has just crossed the 25 GW mark.

In February, the government told Parliament there is no plan to extend the scheme beyond March 2027.

The spread of installations under the scheme is also skewed, with only seven States accounting for over 80 per cent. Gujarat tops with 5.78 lakh installations, drawing ₹4,330 crore in subsidies, followed by Maharashtra (4.71 lakh, ₹3,456 crore), Uttar Pradesh (3.98 lakh, ₹2,753 crore), Kerala (2 lakh, ₹1,462 crore), Rajasthan (1.5 lakh, ₹1,060 crore), Andhra Pradesh (1.07 lakh, ₹734 crore) and Madhya Pradesh (1 lakh, ₹734 crore).

Assam is nearing the one-lakh mark, with 95,685 installations so far, drawing ₹684 crore in subsidies.

The roadblocks

What is holding back progress?

In a recent article, Gaurav Upadhyay, Energy Finance Analyst with the Institute for Energy Economics and Financial Analysis (IEEFA), and Prabhakar Sharma, Senior Consultant at JMK Research, cited several reasons for the slow progress. One of them — “the long wait between application and power generation” — weakens consumer confidence, they say.

The national portal for the scheme shows that 65.21 lakh applications have been received, against which 25.75 lakh installations have been completed — a conversion rate of 39 per cent. This is low, even after allowing for the inevitable time lag between application and installation.

Low consumer awareness, a perception that installing rooftop solar is complicated, slow disbursal of subsidies, and supply constraints in the mandated domestically produced solar modules are among the other reasons cited by Upadhyay and Sharma.

More Like This

Published on March 16, 2026