惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

aimingoo的专栏
aimingoo的专栏
K
KPMG report finds enterprise disconnect between AI and its ROI | CIO
小众软件
小众软件
WordPress大学
WordPress大学
宝玉的分享
宝玉的分享
L
LangChain Blog
cs.CL updates on arXiv.org
cs.CL updates on arXiv.org
D
Docker
Cyberwarzone
Cyberwarzone
腾讯CDC
V
Vulnerabilities – Threatpost
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
AWS News Blog
AWS News Blog
GbyAI
GbyAI
Stack Overflow Blog
Stack Overflow Blog
MyScale Blog
MyScale Blog
C
CERT Recently Published Vulnerability Notes
T
Threat Research - Cisco Blogs
S
Securelist
C
Cybersecurity and Infrastructure Security Agency CISA
Security Archives - TechRepublic
Security Archives - TechRepublic
Know Your Adversary
Know Your Adversary
Security Latest
Security Latest
N
News and Events Feed by Topic
Attack and Defense Labs
Attack and Defense Labs
V
Visual Studio Blog
博客园 - 司徒正美
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
I
Intezer
P
Privacy International News Feed
爱范儿
爱范儿
T
The Exploit Database - CXSecurity.com
O
OpenAI News
云风的 BLOG
云风的 BLOG
博客园_首页
雷峰网
雷峰网
M
MIT News - Artificial intelligence
Project Zero
Project Zero
I
InfoQ
Hacker News: Ask HN
Hacker News: Ask HN
C
Cyber Attacks, Cyber Crime and Cyber Security
N
News and Events Feed by Topic
S
Security Affairs
S
Secure Thoughts
Y
Y Combinator Blog
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
美团技术团队
The GitHub Blog
The GitHub Blog
B
Blog
H
Hacker News: Front Page

Business Tech News: Latest Updates on Innovations, Startups, and Market Trends | The HinduBusinessLine

Geo-engineering against climate change ZincGel vs Li-ion battery Why the energy sector isn’t AI-ready yet IT services giant TCS takes an AI-led avatar IIT-M revives forgotten route to industrial wastewater treatment IIT-Kanpur-incubated start-up develops unique battery technology Two faces of water Why the made-in-India ePlane is unique Moving satellite data at laser speed Longer-lasting zinc battery How simulation tech can ready robots for the real world DAE commissions world’s first nuclear heat-based copper-chlorine hydrogen plant DAE commissions world’s first nuclear heat-based copper-chlorine hydrogen plant Subterranean forest of fungi Using sound waves to bypass charge-based circuits AI aides to decode Indian law How the US funding cut impacts cancer research The time to deploy thorium is now The protein-peptide bonds that heal IIT-Kanpur hosts India’s first DORIS beacon How plants summon help Fishing out fake news using a deep-learning neural network IIT-Madras sets up testing tank for ships, submarines Dentistry’s prehistoric drill With AI, science is borderless How ‘spent’ graphite breathes new life into fuel cell Coal gas can yield clean hydrogen at $1.25 a kg Light, compact antennas IMD launches pilot weather forecast within 1 km radius in UP, national roll out in 2-3 years Nationwide ban soon on Paraquat herbicide over toxicity concerns, health risks ParvAI: ‘Windows to the soul’ and workplace safety Why agreeable AI is a liability in competitive markets Indian material for magnet making Using lasers to punch holes in cell walls When the grid becomes an all-knowing data system Micro-mining for critical rare earth minerals Half the capex, less carbon: The molten magic inside Tata Steel’s HIsarna bet Cosmic aid for miners Efficient brakes and EV range India contributes ₹745 crore to multi-country ITER Artemis-2: Hurtling moon-ward on an epochal mission Power supply lessons for AI Why nuclear fusion is gaining funding Defence research stays underfunded Micro attacks on sewer lines Turning the ubiquitous optical fibre into a sensor The PRAGYA tokamak Mind-reading tech No exam is too hard for AI? Carnot battery: Carbon dioxide as ideal ‘working fluid’ On a leash of light On a wing and an AI-powered tool How do ‘natural polypills’ work? AI tool for capturing and managing hospital records How sea microbes can protect agri fields Why India should choose to build not just powerful, but also governable AI Flaring and quaking Qualcomm has an Edge in India Soil testing of rhizosphere CMFRI achieves captive breeding of threatened mangrove clam No erasures RDI scheme could be operationalised this year IIT-M’s ramjet shell is an engineering marvel Sun-powered supercapacitor 10 years on, NALCO yet to start gallium extraction project Budget doubles allocation for nuclear research to ₹2,410 cr Underwater water Recent successes in science-led atmanirbharta Electric mobility may take wing in the not-too-distant future Eco-friendly semiconductors Twinning prayers and AI at mega temple festival Solar cells of efficiencies above 30% A lesson from Germany on infrastructure maintenance Fabled city in the high mountains Optimising bioreactor design Sensing UV-C in femtoseconds ISRO to kick off 2026 with launch of Earth Observation Satellite Thriving in extremes Indo-Lankan leg-up for S&T Using AI to better assess cyclone damage War on drug resistance goes undersea Big, bad business of junk food Rosatom’s mini variant of small modular reactor Clear thinking on pranayama Can GenAI be a responsible teaching assistant? Pharma PLI fetches ₹26,832 cr sales ‘Scripting’ ideal AI output Honeywell’s technology may bring biomass to the centre stage India-made human-like robot Scorched by 163-year drought NTT’s quantum leap into near sci-fi realm A reality check on AI’s negotiation skills Salinity-proof epoxy coating for marine installations Heat from small-scale solar units could accelerate India’s net-zero transition Cross-species transplantation is at a regulatory crossroads Nature, the ultimate climate warrior Breakthrough in desalination technology, using carbon ‘flowers’ Epidemiology-ML collab decodes India’s struggles with air quality
Big budgets, slow science: BARC under-spends on R&D
By M Ramesh · 2026-04-06 · via Business Tech News: Latest Updates on Innovations, Startups, and Market Trends | The HinduBusinessLine

India’s premier nuclear research body, Bhabha Atomic Research Centre (BARC), has struggled to spend the funds allocated to it by the government for R&D.

The publicly funded BARC has several projects of national importance on its table — ranging from advanced conventional reactors and fast-breeder reactors (key to harnessing India’s thorium resources) to thermal reactors for green hydrogen, isotope development and high-energy particle accelerators. These are critical for energy, nuclear medicine and even food preservation. Yet, BARC has been unable to fully utilise its R&D allocations.

This pattern extends across other Department of Atomic Energy institutions under the Prime Minister’s Office, such as the Indira Gandhi Centre for Atomic Research (IGCAR), the Raja Ramanna Centre for Advanced Technology (RRCAT) and the Board of Radiation and Isotope Technology (BRIT). BARC, the largest among them, was allocated ₹1,100 crore for R&D in 2025-26, while “establishment expenses” were nearly three times higher at ₹3,135 crore.

The R&D allocation was later revised down to ₹919 crore. Till December 2025, BARC had spent about 55 per cent.

The Budget for 2026-27 has nearly doubled BARC’s R&D allocation to ₹1,800 crore.

BARC’s inability to spend allocated funds has been flagged by the Parliamentary Standing Committee examining the department’s demands for grants. The committee noted that the gap between budget estimates and actual utilisation “reflects a recurring pattern of over-estimation… compounded by procedural delays in project execution”.

Among the major projects pending for decades, the accelerator-driven subcritical systems (ADSS) project has been on the anvil since at least 2001. Similarly, plans for a high-intensity 1 GeV proton accelerator, potentially placing India at the forefront of nuclear fusion technology, have seen little progress for over two decades. BARC’s high-temperature reactor for hydrogen production was presented internationally as early as 2006, but no product is yet in the market.

The committee cautioned that higher allocations must be matched by “improvements in execution readiness”.

BRIT, a unit of BARC, allocated ₹88 crore in 2025-26 (later revised to ₹35 crore), spent only ₹12.43 crore, a third of the revised estimate. The 2026-27 Budget has again raised the allocation to ₹76 crore.

RRCAT spent ₹42 crore (till December 2025) against an original allocation of ₹178 crore and a revised estimate of ₹63 crore. The gap is even starker for IGCAR, where the original allocation of ₹225 crore was cut to ₹68 crore, with actual spending at ₹50 crore.

‘Expenditure vacuum’

The department attributed the underspending to project cycles — several projects were concluded in 2023-24, while new ones began only in October 2025. The committee, however, was not convinced, calling it “indicative of a deeper structural issue”. It observed that the gap between the conclusion of one project cycle and the initiation of the next cycle “has resulted in a prolonged expenditure vacuum at a premier nuclear research institution”.

Data from the report also show that establishment costs of the four research units — BARC, IGCAR, RRCAT and BRIT — are more than double their R&D spending: ₹5,171 crore versus ₹2,396 crore in 2025-26 (revised estimates).

More Like This

Published on April 6, 2026