惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

G
Google Developers Blog
S
SegmentFault 最新的问题
Jina AI
Jina AI
D
DataBreaches.Net
人人都是产品经理
人人都是产品经理
罗磊的独立博客
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
爱范儿
爱范儿
大猫的无限游戏
大猫的无限游戏
C
Check Point Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
WordPress大学
WordPress大学
博客园 - 三生石上(FineUI控件)
B
Blog
博客园 - 【当耐特】
博客园 - Franky
M
MIT News - Artificial intelligence
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
L
LangChain Blog
MyScale Blog
MyScale Blog
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
博客园 - 叶小钗
Last Week in AI
Last Week in AI
Engineering at Meta
Engineering at Meta

Latest Logistics, Transport News | The HinduBusinessLine

Time to focus on ‘desi’ fleet creation Northern Railway to operate regular Delhi-Kashmir parcel train service from April 17 GE, HAL clinch tech deal on joint jet engine plan Air India-SIA top brass meet amid leadership flux, massive losses Telangana launches project Sanjeevani for integrated trauma care on highways Delhi airport traffic stalls in CY 25, drops off busiest airport list Glydways targets $1 billion valuation with $250 million funding push Datamatics powers Mumbai Metro Lines 2B & 9 with AFC, mobile ticketing Jeh Aerospace inks pact with Liebherr-Aerospace to supply high-precision components Indian LPG vessel Jag Vikram reaches Kandla Port after crossing Strait of Hormuz Telangana govt ready for dialogue with TGSRTC staff: Minister 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports GE Aerospace–HAL move closer to F414-INS6 engine co-production deal PM Modi inaugurates Delhi–Dehradun Economic Corridor to accelerate regional connectivity GE Aerospace, HAL inching closer to seal jet engine deal Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector Maharashtra: Marathi mandatory for rickshaw and taxi drivers from May 1 Airlines may get ₹5,000 crore credit support under proposed ECLGS variant Kirloskar Brothers boosts naval capability with contribution to INS Taragiri A1 adds 10 multi-axle tankers to expand fleet No immediate impact of US blocking Iranian vessels on India’s crude cargoes US naval blockade of Iranian ports begins; UKMTO confirms enforcement GE Aerospace to set up Tejas engine maintenance facility for IAF India strengthens Sri Lanka maritime push, counters China with strategic bets Indore SEZ exports surge 10.50% to cross ₹14,000 crore in FY 2026 GE Aerospace-IAF tie up for depo-level maintenance iof F404 -IN20 engines France, UK to lead multinational mission to restore navigation in Strait of Hormuz: Macron
JSW Infra emerges successful bidder for Kolkata Port cont...
By BL Mumbai Bureau · 2026-06-09 · via Latest Logistics, Transport News | The HinduBusinessLine
The project will be executed in two phases and is expected to create a total capacity of approximately 0.93 million TEUs

The project will be executed in two phases and is expected to create a total capacity of approximately 0.93 million TEUs

JSW Infrastructure has received a Letter of Award from the Syama Prasad Mookherjee Port Authority, pursuant to a competitive bidding process, for the integrated development of the outer container terminal, which consist of two berths and five berths at Netaji Subhas Dock (NSD) at the Kolkata Dock System.

The Project was awarded on a Design, Build, Finance, Operate and Transfer (DBFOT) basis under the Public-Private Partnership framework and is aimed at enhancing container handling capacity, improving operational efficiency, and supporting growing trade volumes in the region.

Under the concession agreement with a 30 year tenure, the project will be executed in two phases and is expected to create a total capacity of approximately 0.93 million TEUs.

The new award builds on the company’s earlier LOA for the reconstruction of berth eight and mechanisation of berths seven and eight at NSD, Kolkata (0.45 million TEUs), with interim operations expected to commence shortly.

Together, these two projects expand the company’s footprint at one of India’s key eastern gateway ports and reinforce its strategic presence in the Kolkata Dock System.

Upon completion, including the capacity from the ongoing erth seven and eight project, the company’s combined container handling capacity at the Kolkata Dock System is expected to scale up to about 1.4 million TEUs.

Both the projects are expected to address existing capacity constraints at NSD, improve berth productivity through mechanisation and enhance vessel turnaround times.

Upon completion of the identified container growth projects, the company’s overall container handling capacity is expected to increase to about 1.8 million TEUs. The addition of incremental container capacity is aligned with the company’s strategy to further diversify into the container segment and progressively scale up its third-party cargo business, thereby enhancing its overall cargo mix.

Published on June 9, 2026