惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

V
Visual Studio Blog
Recent Announcements
Recent Announcements
雷峰网
雷峰网
The GitHub Blog
The GitHub Blog
罗磊的独立博客
月光博客
月光博客
J
Java Code Geeks
A
About on SuperTechFans
Microsoft Security Blog
Microsoft Security Blog
D
Docker
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
F
Fortinet All Blogs
U
Unit 42
C
Check Point Blog
Martin Fowler
Martin Fowler
有赞技术团队
有赞技术团队
博客园 - 叶小钗
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
酷 壳 – CoolShell
酷 壳 – CoolShell
Blog — PlanetScale
Blog — PlanetScale
大猫的无限游戏
大猫的无限游戏
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
阮一峰的网络日志
阮一峰的网络日志
MyScale Blog
MyScale Blog

Economy News, Latest Economic News Today | The HinduBusinessLine

GE, HAL clinch tech deal on joint jet engine plan India rejects USTR allegations, seeks termination of Section 301 probe Indian automobile sales record highest-ever sales in FY26, first time after FY19: SIAM Madhya Pradesh CM says basmati rice from the State is exported to 47 nations 63 Moons’ cybersecurity arm pilots GPS-spoofing solution at Indian airports Highways ministry notifies amendment to streamline fee for overloaded vehicles on NHs Global aviation crisis deepens as fuel shortage, Iran conflict hit airlines TRI launches agri-voltaic project to help farmers earn double income Hotel industry to hit $31 billion in 2029; listed hotel firms set to add 70k rooms by 2030: CBRE Temperatures may trend up over North-West, Central India until weekend Reduction in airport tariff credit neutral, minimal impact on revenue: Ind-Ra Global coffee prices rise as fertiliser costs and West Asia tensions threaten supply Bluspring Enterprises to acquire LSG Sky Chefs India, enters aviation catering sector China says policy to improve relations with India remains unchanged amid Arunachal naming row Research firms divided over impact of below normal monsoon on food inflation Unnat Krishi Mahotsav concludes, farmers to emerge as energy, fuel & hydrogen providers, says Gadkari Airlines may get ₹5,000 crore credit support under proposed ECLGS variant How kashmir’s breakthrough is making Gucchi mushroom farming possible Centre not taking away State’s power on bonus for agri produces, says FM Sitharaman Carriers cut flights on cost pressures, uncertain demand GE Aerospace scales AI from pilots to production; India anchors global capability West Asia crisis may push India’s current account deficit to 2% of GDP: Crisil Tax Dept to resume Tiger Global reassessment, says GAAR relief won’t alter SC ruling Ceasefire talks fail to restore vessel movement in Strait of Hormuz, fate of 599 ships remain inconclusive DMRC launches mid-life refurbishment of Blue Line trains to enhance safety and passenger experience Retail inflation likely rose 3.5-4% in March India-UK free trade pact may come into force from second week of May: Official 'West Asia war a good opportunity for energy reforms, lower costs for industry' India’s marine exports surge to ₹62,408 crore in 2024-25, Govt sets ₹1 lakh crore target PM Modi to inaugurate Dehradun-Delhi Expressway on April 14
Chennai Division accelerates railway infrastructure upgrades
BL Chennai Bureau · 2026-05-22 · via Economy News, Latest Economic News Today | The HinduBusinessLine

The Chennai Division of Southern Railway (SR) has achieved significant progress in infrastructure strengthening and track improvement works in 2025–26, enabling the relaxation of several Permanent Speed Restrictions (PSRs) across major railway corridors.

The relaxation of speed restrictions has been made possible through systematic engineering interventions including track renewal, strengthening of formation, curve improvements, transition corrections, and continuous monitoring of track geometry and riding quality standards, said a release from SR.

As part of these improvements, the permissible speed in the Chennai Central–Arakkonam section of the Chennai Central–Jolarpettai route has been enhanced in certain locations where speed restrictions were previously imposed, following improvement works carried out on reverse curves.

In the Chennai Central–Gudur section, multiple speed restrictions in the Nayudupeta–Doravari Chatram and Sullurupeta–Polireddipalem stretches have been relaxed following the completion of engineering strengthening works at sharp curve locations and weak formation areas.

Consequently, the permissible speed in those locations has been enhanced from 110 kmph to 125 kmph. Similarly, in the Chennai Egmore – Villupuram section, speed restrictions between Chengalpattu and Villupuram have been eased following curve transition improvements undertaken by the Engineering Department, the release said

In the Chennai Beach – Chennai Egmore section, speed restrictions on the main line have also been relaxed after carrying out corrective measures on reverse curve geometry, facilitating smoother suburban train operations in this highly congested corridor, the release said.

Published on May 21, 2026