惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - 三生石上(FineUI控件)
D
DataBreaches.Net
博客园_首页
J
Java Code Geeks
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
罗磊的独立博客
腾讯CDC
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
B
Blog
D
Docker
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
A
About on SuperTechFans
博客园 - 聂微东
Stack Overflow Blog
Stack Overflow Blog
WordPress大学
WordPress大学
MyScale Blog
MyScale Blog
G
Google Developers Blog
博客园 - 司徒正美
aimingoo的专栏
aimingoo的专栏
小众软件
小众软件
Apple Machine Learning Research
Apple Machine Learning Research
博客园 - 叶小钗
M
MIT News - Artificial intelligence
Recent Announcements
Recent Announcements

博客园 - FlyEagle

软件项目的WBS模版 我们需要突破,以及突破之后的坚持 终于买车了 研发项目管理中需要注意的人性弱点(转) Java 网站 Progress Reports 一个完美的的项目经理 中国教育与软件企业的共同误区 十个条件 如何确定需求是否完善? 需求分析和项目进度 IT项目管理的“羊肉”与“狗头” 什么是项目管理(转自itpm,作者itpm) 单元测试测什么? Project Report里面应该注意的是什么? How to be a great Project Director How to be a great Project Director How to be a great Project Director DBM经历(六)UAT了
RMC Project Manager
FlyEagle · 2006-05-15 · via 博客园 - FlyEagle

Introduction

At the completion of this lesson you'll be able to describe and define:

• Communications management process
• Communications management plan
• What should be reported
• Information distribution
• Lessons learned
• Communications model

• Nonverbal
• Percent of communication that is nonverbal
• Paralingual
• Active listening
• Effective listening
• Feedback

• Communications methods

• Formal/informal written
• Formal/informal verbal

• Communication channels
• Percent of time a project manager spends
   communicating
• Rules for meetings
• Issue logs
• Communication blockers
• Control of communications

How much time do you spend planning communications?  How many times have you deleted a voicemail without
listening to the very end of the message? Are you flooded with e-mails? How many times have you not read all the way through an e-mail?

In almost every study, including my own, communications is the number one problem a project manager has on
a project. You will read in this chapter that a project manager spends 90 percent of her time communicating.
Shouldn’t we then do something to plan, structure and control communications?

Beginning project managers do nothing about communications and just issue status reports.  Better project managers might create a communications management plan and report more than just status. Great project managers take the previous two actions, plus the following: ask stakeholders what they need communicated to them, identify what communications they need from stakeholders, and frequently revisit communications at team meetings to limit communications problems.

To pass this exam, you need to be more like the great project manager.

Although it is not particularly difficult, make sure you take this chapter seriously and find your gaps regarding communications.

Communications questions are frequently combined with other topics.  For example, a WBS is a communications tool (see the Scope lesson) and risk response strategies should be communicated (see the Risk lesson).