惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

腾讯CDC
IT之家
IT之家
有赞技术团队
有赞技术团队
WordPress大学
WordPress大学
Apple Machine Learning Research
Apple Machine Learning Research
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
人人都是产品经理
人人都是产品经理
The Cloudflare Blog
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
博客园 - 【当耐特】
V
V2EX
Last Week in AI
Last Week in AI
H
Help Net Security
The GitHub Blog
The GitHub Blog
S
SegmentFault 最新的问题
F
Fortinet All Blogs
I
InfoQ
宝玉的分享
宝玉的分享
A
About on SuperTechFans
MongoDB | Blog
MongoDB | Blog
Microsoft Azure Blog
Microsoft Azure Blog
Blog — PlanetScale
Blog — PlanetScale
B
Blog

博客园 - Rickel

在webView 中使用JS 调用 Android / IOS的函数 Function 数据库镜像的配置 查看SQL Server中某数据库下每个表占用的空间大小 sql server 2005 压缩实例下所有数据库文件及日志文件 语句 TFS服务器及服务帐号迁域的处理 [西安招聘] 微软西安分公司 招聘.NET软件工程师,MOSS开发工程师 SQL清除数据库日志方法 JavaScript 中的Key 事件区别 ASP.NET URL Rewrite. URL重写 生成高品质的缩略图 Apache Error:(OS 10048)Only one usage of each socket address is normally permitted. 页面响应自定义控件的事件 推荐大家看 《亵渎》 断字处理 break-word I'm Back 部署带Crystal Reports的Web应用程序 用C#读取Excel文件:从指定单元格开始向右向下读取数据 Well-formed AssemblyInfo.cs 毕业一周年纪念
about WBS
Rickel · 2008-10-10 · via 博客园 - Rickel

Why is the WBS so important to proposing a deal? You cannot propose a deal without a price. You cannot price without an estimate. You cannot estimate without a plan. You cannot plan without a work breakdown structure (WBS).

The WBS should also include the phases, activities, tasks, dependencies, milestones, and effort. Be sure that you also identify and capture tasks for analysis, review cycles, testing cycles, and meetings. These are often items that take up a great deal of time but are often not included in the WBS

However, the following guidelines apply to most estimation methodologies:
  Build your WBS by basing it on outcomes and not actions
  Base your WBS on all of the work to be completed, not just on the work to be completed as part of a fee-for-service effort
  Do not mix estimation methodologies within a project;
  Ensure that each item you create in your WBS does not overlap with another and is a discrete entity. 
  A good rule of thumb is that to stay at a manageable level of detail, go no more than 3 levels deep in your WBS. 
  Create your estimates based on the actual length of working time (not calendar time) required for one qualified resource to complete the task
  Other than the assumptions documented, create your estimates without thinking about who will be performing the task. 
  Create quick profiles of the roles that will be performing the work.
  Do not add buffer or contingency time to a task estimate in your WBS, this should be added uniformly at a later stage.
  If the requirements have imposed a firm deadline, you should work all estimates backwards to the appropriate start time, as a reality check. If the appropriate start time for that deadline is not feasible or is in the past, the project is probably not going to be successful with the current Scope of Work.