惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

MyScale Blog
MyScale Blog
人人都是产品经理
人人都是产品经理
云风的 BLOG
云风的 BLOG
小众软件
小众软件
F
Fortinet All Blogs
爱范儿
爱范儿
WordPress大学
WordPress大学
N
Netflix TechBlog - Medium
Recent Announcements
Recent Announcements
Google DeepMind News
Google DeepMind News
C
Check Point Blog
博客园 - 聂微东
D
Docker
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
aimingoo的专栏
aimingoo的专栏
Vercel News
Vercel News
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
A
About on SuperTechFans
博客园 - 【当耐特】
Microsoft Azure Blog
Microsoft Azure Blog
B
Blog
宝玉的分享
宝玉的分享
Jina AI
Jina AI
H
Hackread – Cybersecurity News, Data Breaches, AI and More

Futurism

SpaceX Stock Has Officially Fallen All the Way Down to the Low $170s SpaceX Stock Had Quite a Bad Night Wall Street Terrified That SpaceX Investors Will Dump Their Stocks SpaceX Stock Now in Rapid Decline SpaceX Stock Has Now Started to Fall Scientists Propose That Entire Universes Can Form Inside Collapsing Stars NASA Loads Moon Rocket onto Giant Trump-Branded Train Eighty Residents Sue SpaceX, Saying Elon Musk’s Constant Rocket Launches Are Literally Destroying Their Homes SpaceX’s IPO Shows That We Aren’t Even Close to Peak AI Bubble The More Data We See About SpaceX’s IPO, the More We’re Wincing Scientists Discover Fearsome Wind That Destroys Entire Galaxies Scientists Release Results After Scanning 3I/ATLAS for Alien Signals The Math on SpaceX’s IPO Is Virtually Impossible Astronomers Say Star Self-Destructed So Catastrophically That It Left Behind No Trace of Its Existence Catholic Church Boots Exorcist After He Said UFOs Are Demons NASA’s James Webb Discovers That 3I/ATLAS Let One Rip as It Passed Through Solar System Scientists Find Chunk of Lost Planet in Desert It’s Possible That SpaceX Could Collapse Spectacularly ISS Astronauts Ordered to Enter Evacuation Mode SpaceX Is Massively Overvalued Ahead of Its IPO, Analysts Find Paper Claims the “Asteroid” Japan’s Probe Is Approaching Is Actually a Derelict Spacecraft Trump Shovels $4 Billion Directly to Elon Musk, Who Spent a Fortune Getting Him Elected Scientists Say They’ve Cracked Mystery Behind a Dozen Strange Signals From Deep Space Scientists Spot What Appears to Be a Ring-Shaped “Planet Factory” Deep Out in Space Scientists Say They’ve Found Fungi That Turn Dead Martian Soil Into Fertile Cropland The Blue Moon Is Fake. You Are Being Deceived Jeff Bezos’ Rocket Explodes Into Mushroom Cloud, Dealing Massive Blow to NASA’s Moon Plans Elon Musk Furious at Starlink Being Used for American Suicide Drones NASA Releases Sweeping Plans for Moon Base Scientist Suggests That 3I/ATLAS May Have Seeded Life as It Careened Through Our Solar System
NASA’s Next Moon Mission Is a Rube Goldberg Machine of Co...
Victor Tangermann · 2026-06-10 · via Futurism

A still from NASA's video opening sequence announcing the crew of Artemis III.

NASA via X

Sign up to see the future, today

Can’t-miss innovations from the bleeding edge of science and tech

NASA announced the crew of four astronauts for its upcoming Artemis 3 mission during a Tuesday announcement, an important stepping stone in its ambitions to return humans to the lunar surface.

The space agency also elaborated on what the mission, which is still slated for some time next year, will entail. Instead of taking one big step to the Moon, as originally envisioned, the astronauts will be traveling only to Earth’s orbit inside NASA’s Orion capsule, where they’ll rendezvous and board both Blue Origin’s Blue Moon lander and SpaceX’s Starship in quick succession over a span of three days.

It’s a highly complex juggling act involving several docking and undocking procedures that will require a lot of things to go right the first time. Artemis 3 is designed to lay the groundwork for the first crewed landing attempt in over half a century, which is tentatively scheduled for 2028. But whether the elaborate dance in our planet’s orbit will ultimately work out as NASA is envisioning is anything but a guarantee, given the litany of corporate failure points involved.

For one, the elephant in the room during this week’s announcement was an enormous explosion that recently rocked Blue Origin’s New Glenn rocket, the launch platform designed to deliver its Blue Moon lander to space. The thunderous May 28 mushroom cloud dealt significant damage to Launch Complex 36 at the Cape Canaveral Space Force Station in Florida, leading to questions of whether it, and Blue Origin’s rocket, will be ready in time for Artemis 3. (NASA is also hoping to send an uncrewed Blue Moon lander to the Moon long before that as well.)

The incident appeared to be top of mind for those speaking during today’s announcement, indicating NASA was painfully aware of the optics. Just days before the explosion, NASA had released sweeping plans for the buildout of a Moon base.

Blue Origin lunar SVP John Couluris said during the event that the company is “making excellent progress on the investigation and pad cleanup,” adding that “we’ll begin rebuilding” and “continuing construction” afterwards.

“We are confident that New Glenn will be ready for Artemis 3, together with Blue Origin, but NASA is stepping in and bringing all of our expertise and capabilities to bear,” Artemis program manager Jeremy Parsons said during today’s announcement.

NASA administrator Jared Isaacman sounded equally convinced, telling reporters that he was “extremely” confident of the agency’s timelines for both Artemis 3 and 4 in 2027 and 2028 respectively.

SpaceX also still has a lot left to prove before astronauts can dock with its Starship spacecraft as soon as next year. The Elon Musk-led company is looking to fly a modified V3 model, which differs from its Moonbound Human Landing Systems variant, for Artemis 3.

However, Starship V3 remains a work in progress at the time of writing. It has yet to travel to space and survive its rocket-aided soft landing in one piece. A test flight in late May resulted in a massive fireball in the Indian Ocean following splashdown.

SpaceX is also hoping to prove that it can refuel its Starship in space ahead of Artemis 3, an integral part of its plans to get all the way to the Moon during Artemis 4. (It’s unclear if it’s still a requirement for NASA’s reimagined Artemis 3 mission.)

In short, while NASA already has a successful crewed mission around the Moon under its belt, proving the flightworthiness of its Space Launch System and Orion capsule, setbacks plaguing its corporate partners could end up delaying NASA’s highly ambitious plans.

Artemis 3 is the culmination of decades of work and contributions from countless contractors that will all need to come together seamlessly. Considering we’re already over halfway through 2026, we wouldn’t be surprised if NASA will need to once again push back the timelines.

More on Artemis 3: NASA’s Moon Landing Schedule Slipping Horrendously Under Trump