惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

量子位
S
Securelist
MyScale Blog
MyScale Blog
Jina AI
Jina AI
罗磊的独立博客
The Cloudflare Blog
美团技术团队
博客园 - 叶小钗
阮一峰的网络日志
阮一峰的网络日志
博客园 - 三生石上(FineUI控件)
月光博客
月光博客
雷峰网
雷峰网
小众软件
小众软件
aimingoo的专栏
aimingoo的专栏
大猫的无限游戏
大猫的无限游戏
博客园 - Franky
博客园 - 聂微东
Y
Y Combinator Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
MongoDB | Blog
MongoDB | Blog
T
Tailwind CSS Blog
Attack and Defense Labs
Attack and Defense Labs
博客园_首页
Latest news
Latest news
Apple Machine Learning Research
Apple Machine Learning Research
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
The Hacker News
The Hacker News
G
GRAHAM CLULEY
Simon Willison's Weblog
Simon Willison's Weblog
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
P
Proofpoint News Feed
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
U
Unit 42
D
Docker
Webroot Blog
Webroot Blog
N
Netflix TechBlog - Medium
T
Tor Project blog
C
Cyber Attacks, Cyber Crime and Cyber Security
L
LINUX DO - 最新话题
cs.CV updates on arXiv.org
cs.CV updates on arXiv.org
The Last Watchdog
The Last Watchdog
B
Blog
Recent Announcements
Recent Announcements
GbyAI
GbyAI
Microsoft Azure Blog
Microsoft Azure Blog
Security Latest
Security Latest
V2EX - 技术
V2EX - 技术
N
News | PayPal Newsroom
Microsoft Security Blog
Microsoft Security Blog

Futurism

Scientists Say New Method Turns Coffee Grounds Into High-Potency Renewable Fuel Solar Just Produced More Electricity Than Coal for the First Time in the History of the United States Trump Desperately Pumps Money Into Dying Coal Industry Peter Thiel Working on Floating Data Centers in the Ocean Crabby 82-Year-Old Politician Attacks 10-Year-Old Child for Thinking Electric Cars Are Cool Electric Company Says It’s Cutting Off an Entire Town So It Can Sell All Its Power to Data Centers Scientists Experimenting With Quantum Effect That Some Fear Could Cause Chain Reaction That Ends Entire Universe The War in Iran Is Causing China to Sell So Many Solar Panels That Your Jaw Will Drop Scientists Say They’ve Tested a Way to Get to Alpha Centauri in Just 20 Years Just 11 AI Data Centers Could Belch More Fumes Than Entire Countries Trump Moves to Let Coal Companies Pollute Waterways With Their Toxic Slag There’s a Glaring Safety Problem With Nuclear Energy Startups Scientists Set New Record for Solar Cell Efficiency Google Says Showing Polymarket Bets on Google News Was a Mistake The Trump Administration Is Doing Something Horrifying to Workers at Nuclear Facilities The Iran War Has Cut Off Supply of a Gas the AI Industry Desperately Needs
Almost Half of US Data Centers That Were Supposed to Open This Year Slated to Be Canceled or Delayed
2026-04-02 · via Futurism

A hand holding a pair of large silver scissors is cutting a red ribbon held by another hand against a bright yellow background. The image has a vibrant, high-contrast color effect.

Illustration by Tag Hartman-Simkins / Futurism. Source: Getty Images

Sign up to see the future, today

Can’t-miss innovations from the bleeding edge of science and tech

The data centers powering your favorite AI chatbot are running low on helium, cash, and neighbors who don’t hate them, and that’s not even the worst of it.

According to reporting by Bloomberg, about half of the data centers slated to open in the US in 2026 will either face delays or outright cancellations.

The publication interviewed analysts at market intelligence company Sightline Climate, which in research first flagged by Ed Zitron last week noted that 12 gigawatts worth of power-consuming data centers are set to open in the US this year. But here’s the catch: they say only a third of those are actually under construction right now, with the rest in a liminal pre-production stage in which they could, and likely will be, canceled.

It’s not just a problem for data centers planned for 2026, either. Among data centers slated to open in 2027, only about 6.3 gigawatts worth of computing infrastructure are actually under construction, compared to 21.5 announced gigawatts.

Things get even dodgier in the coming years, with the vast majority of data centers planned for launch between 2028 and 2032 having yet to even break ground. There are a further 37 gigawatts of planned infrastructure which haven’t even received a firm completion date, only 4.5 of which have actually begun work.

Those delays, it seems, are due to a key bottleneck: electrical components manufactured abroad. Batteries, electrical transformers, and circuit breakers all make up less than 10 percent of the cost to construct one data center, but as Andrew Likens, energy and infrastructure lead at Crusoe’s told Bloomberg, it’s impossible to build new data centers without them.

“If one piece of your supply chain is delayed, then your whole project can’t deliver,” Likens said. “It is a pretty wild puzzle at the moment.”

As demand for those components far outpaces supply in the US, data center firms have had to source those components from manufacturers in Canada, Mexico, South Korea, and China. That leads to longer build times as those complicated parts are sewn together with assemblages of other, smaller parts, before being shipped across the ocean, and eventually trucked to the final construction site.

“We’ve seen firsthand the value it can create if you are not hamstrung by electrical infrastructure lead times,” Crusoe’s Likens told Bloomberg. “They can make or break a project.”

More on data centers: Data Centers Causing Huge Temperature Spikes for Miles Around Them, Study Suggests