惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

博客园 - 叶小钗
MyScale Blog
MyScale Blog
博客园 - 【当耐特】
I
InfoQ
腾讯CDC
aimingoo的专栏
aimingoo的专栏
L
LangChain Blog
人人都是产品经理
人人都是产品经理
D
DataBreaches.Net
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Engineering at Meta
Engineering at Meta
A
About on SuperTechFans
Google DeepMind News
Google DeepMind News
Vercel News
Vercel News
C
Check Point Blog
B
Blog RSS Feed
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
美团技术团队
Stack Overflow Blog
Stack Overflow Blog
Y
Y Combinator Blog
D
Docker
MongoDB | Blog
MongoDB | Blog
量子位
博客园_首页

JPost.com - Business & Innovation | The Jerusalem Post

Your Investments: Financial freedom and Jerusalem unification Your Taxes: How Israel’s new war compensation system works Victory for the Negev vision: Light Rail will reach gates of the intelligence campus - opinion Only 45% of Tel Aviv Stock Exchange companies made donations in 2025, study finds “Within 5 to 6 Years, all of Israel will be connected to a single water network” Forget the model wars, the real AI challenge is orchestration -opinion Israeli-Cypriot cyber company to unveil Starlink de-anonymizing tool - report Cellular Intelligence strikes deal with Novo Nordisk to advance Parkinson’s cell therapy Israel’s inflation dynamics remain under control IDF reservists created 150 new startups during last year, innovation program reveals Trump to regulate AI development after Anthropic's Mythos posed cybersecurity threat - report Your Investments: Prosperity in Israel takes time, but aliyah is worth it Your Taxes: An agreement is an agreement Inside Inspiraction, the Jerusalem incubator helping young Israelis turn ideas into start-ups Israeli-founded AI biotech Immunai expands AstraZeneca cancer collaboration The death of the US Jewish Orthodox middle class- opinion Real estate giant invests $200 million into Miami’s high-tech hub: What’s Flow Wynwood? Almost half of operational decisions will be done by AI in 2030, IBM reveals - poll It’s all about timing! 2026 is a rare opportunity window for Tel Aviv real estate A new standard of hospitality How Israel’s new reporting rules change the olim tax holiday - opinion Senior R&D managers are paying the price of the AI revolution - opinion Consumer guilt costs companies billions in abandoned online shopping carts - study A strategic miss: R&D is Israel's brain - so why does it develop, manufacture abroad? - opinion Connecting neighbors under fire: The story behind Angels of the Shelter AI is ending era of ‘job immunity’ for young tech workers as it reshapes Israel's job market Israeli AI startup cracks code of who is at fault when system fails: What do they do? - interview Your Taxes: Israel’s lower mid-market is tempting international M&A buyers Your Investments: Second chances, respect, and newlywed finance Microbes coordinate activity to reduce competition, Israeli researchers discover
Chevron completes Tamar Optimization Project, boosting Is...
JERUSALEM POST STAFF · 2026-06-16 · via JPost.com - Business & Innovation | The Jerusalem Post
ByJERUSALEM POST STAFF

Chevron Mediterranean Limited and its partners in the Tamar natural gas field have completed the Tamar Optimization Project offshore Israel, the company said Tuesday, June 16, 2026. The project aims to strengthen domestic and regional gas supply by expanding flow capacity from the reservoir to Israel’s transmission network.

The project included the construction of a new 150-kilometer pipeline from the Tamar field, located about 90 kilometers west of Haifa, to the Tamar platform about 24 kilometers west of Ashkelon. It also included the reinstatement of three booster gas compressors at the Ashdod Onshore Terminal, Chevron said.

New pipeline increases Tamar flow capacity

The new line, also known as the third gathering line, was added to two existing gas transmission pipelines serving the field. The Jerusalem Post previously reported that Chevron had approved the first phase of Tamar’s expansion, including a third 150-kilometer pipeline from the field to the offshore platform.

Tamar’s technical production capability now stands at 1.6 billion cubic feet per day, compared with 1.1 billion cubic feet per day before completion of the project. The Post later reported that the second phase of the Tamar Optimization Project aimed to restore compressors at the Ashdod Onshore Terminal and raise capacity to 1.6 billion cubic feet per day.

Chevron cites Israeli and regional energy security

“Completion of the Tamar Optimization Project is a further step in Chevron’s long-standing commitment to partner with the State of Israel to deliver essential energy infrastructure, to meet the growing demand for reliable and affordable energy,” said Jack Baker, managing director of Chevron’s Eastern Mediterranean region.

“Chevron remains focused on supporting resilient and diversified energy systems,” Baker said. “This latest project will play an important role in strengthening energy security domestically and across the region.”

Completion follows Leviathan infrastructure work

Chevron said the completion of the Tamar project follows the recent delivery of first gas from the Leviathan Third Gathering Line. The Post reported in January that Chevron and its partners approved a Leviathan expansion plan intended to increase production capacity through new wells, subsea infrastructure, and platform upgrades.

Together, the Tamar and Leviathan projects increase offshore capability from 2.4 billion cubic feet per day to 3.1 billion cubic feet per day, Chevron said. The company said the projects also aim to improve operational resilience in Israel’s offshore gas system.

Eastern Mediterranean portfolio grows

Chevron operates the Tamar and Leviathan fields in Israel and the Aphrodite gas field offshore Cyprus, which is currently in development. The Post reported this month that Chevron has expanded its role in Israel’s energy sector through the Leviathan and Tamar natural gas fields.

The Tamar Optimization Project marks one of the most significant recent infrastructure upgrades to Israel’s offshore gas system, bringing the field’s stated technical capability to 1.6 billion cubic feet per day.

Follow us on Google