惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
Docker
Apple Machine Learning Research
Apple Machine Learning Research
宝玉的分享
宝玉的分享
博客园 - 叶小钗
酷 壳 – CoolShell
酷 壳 – CoolShell
博客园 - 司徒正美
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
博客园 - Franky
爱范儿
爱范儿
罗磊的独立博客
IT之家
IT之家
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
N
Netflix TechBlog - Medium
云风的 BLOG
云风的 BLOG
P
Proofpoint News Feed
U
Unit 42
Engineering at Meta
Engineering at Meta
WordPress大学
WordPress大学
博客园 - 三生石上(FineUI控件)
T
Tailwind CSS Blog
H
Help Net Security
博客园_首页
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
人人都是产品经理
人人都是产品经理

The Register

Shadow IT has given way to shadow AI. Enter AI-BOMs Zed team releases version 1.0 of Rust-built editor: Traditional editor and AI tool Microsoft boss tells investors the company is working to 'win back fans' What type of 'C2 on a sleep cycle' do they leave behind? Novel Chinese spy group found in critical networks in Poland, Asia NASA boss: Make Pluto A Planet Again GitHub says sorry and vows to do better as uptime slips and devs complain Age checks could turn internet into an ID checkpoint, complains Proton CEO Microsoft gives your Word documents an AI co-author you didn’t ask for Datadog digs down into GPU efficiency as AI costs soar If malware via monitor cables is a matter of national security, this might be the gadget for you Thunderbird in hand worth 2 Outlooks as fresh FOSS fave and Firefox arrive Grafana offers AI assistant for free, warns users not to go mad Right to repair champ Framework punts modular 13in laptop with Core Ultra Series 3 France's 'Secure' ID agency probes breach as crooks claim 19M records Scotland Yard can keep using live facial recognition on Londoners, say judges UK tribunal sends £2B claim accusing Microsoft of overcharging for licensing to trial Nation-states want to cause harm, not just steal cash - stop handing your cyber defenses to the cheapest contractor Murder, she wrote: Ex-FBI chief wants some ransomware crims charged with homicide Phone-to-satellite use goes into orbit, growing 25% in 8 months macOS ClickFix attacks deliver AppleScript stealers to snarf credentials, wallets Anthropic bakes memory fixes into Bun 1.1.13 as developers complain of leaks The spaghettified DBMS chart that shows Oracle's crown is slowly slipping Yet another ex-ransomware negotiator admits turning rogue after payoff from crimelords FAA grounds Blue Origin's New Glenn as it probes missed satellite delivery 'mishap' AMD's Ryzen 9 9950X3D2 Dual Edition tested: Gratuitous overkill with a price to match AI-assisted intruders pwned Vercel via OAuth abuse and a pilfered employee account Crook claims to leak 'video surveillance footage' of companies Met police trials snoop tech platform in push to cuff more London shoplifters England's school phone ban gets teeth, just in time to bite no one Adaptavist Group breach spawns imposter emails as ransomware crew claims mega-haul
AI datacenter boom collides with US grid reality
Brandon Vigliarolo · 2026-05-23 · via The Register

Power grid operators and datacenter developers in the United States are in a bind, and energy analysts can't see an easy way out. 

The American power grid is old, outdated, and in desperate need of upgrades. Add in a growing number of gigawatt-scale AI datacenters demanding stable access to power that doesn’t disrupt service-level uptime agreements and things start to look even worse

Energy costs have already skyrocketed in the nation's largest energy market mainly thanks to the bit barn bonanza, leading to a new chorus of calls for datacenters to bring their own power generation if they want reliable supplies not bound by grid constraints. 

REG AD

According to energy analysts at Wood Mackenzie, datacenter operators have a choice to make, and neither option is great. 

REG AD

They can wait the five to 10 years it’ll take for grid operators to upgrade their transmission and generation capabilities to account for their demands. 

Or they can accept deals with power companies that supply them with power but require curtailment during peak loads, and then install their own on-site power generation to make up the difference. This is the far riskier option, but it’s one that many operators are going with. 

“With more than 90 GW of collocated generation in US interconnection pipelines, it is clear that the need to scale up at speed has sent many data centre developers down the riskier path,” WoodMac explained in the report. “Collocating volatile AI workloads with power generation has scarce precedent, though, and is far more difficult than most in the industry understand.” 

What the grid wants, the grid gets

Many datacenter operators are only thinking about generator megawatts, say the analysts, leaving engineers frustrated at having to explain the technical complexities of building colocated power generators. Multiple grid operators have passed rules that, as key stakeholders understand them, could give utilities priority rights over colocated power generators during shortages, potentially forcing datacenters to reduce demand while supplying power back to the grid, WoodMac said.

“This effectively makes the model unworkable,” the analysts said. “Few data centre developers would invest in baseload generation if it could not be utilised when it was most needed.”

Near-instantaneous swings in AI power demand can damage reciprocating engines and gas turbines, while batteries may not respond fast enough to every spike and can degrade over time. The rapidly fluctuating power demanded by hyperscale AI datacenters could even damage the grid itself.

“These loads can also cause sub-synchronous oscillations, which pose fundamental stability risk to not only local generators but also to distant ones on the transmission system,” the analysts note. “Technology providers are only beginning to come to terms with this challenge, the mitigation of which is site specific, making solutions hard to scale.” 

REG AD

In other words, on-site generation might solve one problem while introducing a whole host of new issues. 

“While hyperscalers are likely to successfully operationalise some projects with collocated resources, it will come at considerable cost,” the report concludes. “This cost, along with the technical risk and project-specific mitigation required, will prevent collocation from emerging as a scalable model.”

So, what’s the alternative? Well, building out the grid, obviously. WoodMac said that grid operators largely don’t consider conditional interconnection with curtailment requirements to be a long-term solution, and are all investing billions in modernization. But those modernization initiatives are going to hit everyone in the wallet. 

Improving grids to serve AI datacenters “has profound implications for affordability … regional network upgrades necessary to support local large-load connections will be spread among all ratepayers,” WoodMac said. “This may trigger a political outcry.” 

Rates are already increasing across the US, said Ben Hertz-Shargel, WoodMac's global head of grid transformation and large loads, and no presidential decree can slow that down.

"As the data center buildout eclipses existing utility capacity and more infrastructure must be built, we'll see that increasingly become a driver of customer rates," Hertz-Shargel told us in an email. 

The study doesn’t present a solution for the current situation, forecasting uncertainty as grid operators hurry to come up with some solution, as datacenter operators’ plans blow past their ability to meet demand. Hertz-Shargel didn't have much comfort to offer here, either. 

"With utilities and grid operators reforming their load interconnection processes, we're likely to see more capacity made available through utilities," Hertz-Shargel said. Not everyone is going to be able to secure that utility capacity, though, and the organizations that are left out will be stuck with the same choice: Wait for the grid to catch up, or rely on colocated generation and conditional grid connection deals, Hertz-Shargel explained. 

REG AD

"When the current wave of transmission capacity completes, though, the industry will be in a position for quick acceleration," Hertz-Shargel added – as long as the numbers continue to work out. "That presumes that investors like what they see in terms of AI's return on investment by that time, however, and remain comfortable deploying massive capital into digital infrastructure."

That's far from a sure thing at this point. 

The only thing that the report sees for certain in the current situation is a quick division into winners and losers in the AI race. Big players who are able to absorb the costs will emerge as victors. 

“The challenges facing [energy] collocation are surmountable for the most experienced and deep-pocketed developers,” Wood Mackenzie said. “Companies capable of operating reliably without firm grid service will be able to scale their AI business faster than others, positioning them to outcompete.”

In other words, expect the big guns to further entrench their dominance as the little guys are starved to death or are gobbled up by the competition. There’s nothing like the American dream, eh? ®