惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Martin Fowler
Martin Fowler
A
About on SuperTechFans
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
aimingoo的专栏
aimingoo的专栏
T
The Blog of Author Tim Ferriss
IT之家
IT之家
罗磊的独立博客
博客园_首页
月光博客
月光博客
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Last Week in AI
Last Week in AI
OSCHINA 社区最新新闻
OSCHINA 社区最新新闻
量子位
Hugging Face - Blog
Hugging Face - Blog
G
Google Developers Blog
博客园 - 叶小钗
H
Help Net Security
N
Netflix TechBlog - Medium
B
Blog
Engineering at Meta
Engineering at Meta
Cyber Security Advisories - MS-ISAC
Cyber Security Advisories - MS-ISAC
V
V2EX
Vercel News
Vercel News
博客园 - 三生石上(FineUI控件)

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability
What is slowing residential rooftop solar installations
By M Ramesh · 2026-03-16 · via Clean Tech News | The HinduBusinessLine

With just a year left before its scheduled closure, the Prime Minister Surya Ghar Muft Bijli Yojana has achieved only about 25 per cent of its target, with 25.75 lakh residential rooftop solar installations so far.

The scheme, launched in February 2024, provides subsidies for one crore residential rooftop solar installations of up to 3 kW and is scheduled to close in March 2027. The installations achieved so far have consumed about 24 per cent of the ₹75,000 crore allocated for subsidies.

The scheme also aims to create 30 GW of residential rooftop solar capacity, but installations so far add up to only 9.4 GW (as of March 11). Incidentally, the country’s total rooftop solar capacity (residential and industrial/commercial) has just crossed the 25 GW mark.

In February, the government told Parliament there is no plan to extend the scheme beyond March 2027.

The spread of installations under the scheme is also skewed, with only seven States accounting for over 80 per cent. Gujarat tops with 5.78 lakh installations, drawing ₹4,330 crore in subsidies, followed by Maharashtra (4.71 lakh, ₹3,456 crore), Uttar Pradesh (3.98 lakh, ₹2,753 crore), Kerala (2 lakh, ₹1,462 crore), Rajasthan (1.5 lakh, ₹1,060 crore), Andhra Pradesh (1.07 lakh, ₹734 crore) and Madhya Pradesh (1 lakh, ₹734 crore).

Assam is nearing the one-lakh mark, with 95,685 installations so far, drawing ₹684 crore in subsidies.

The roadblocks

What is holding back progress?

In a recent article, Gaurav Upadhyay, Energy Finance Analyst with the Institute for Energy Economics and Financial Analysis (IEEFA), and Prabhakar Sharma, Senior Consultant at JMK Research, cited several reasons for the slow progress. One of them — “the long wait between application and power generation” — weakens consumer confidence, they say.

The national portal for the scheme shows that 65.21 lakh applications have been received, against which 25.75 lakh installations have been completed — a conversion rate of 39 per cent. This is low, even after allowing for the inevitable time lag between application and installation.

Low consumer awareness, a perception that installing rooftop solar is complicated, slow disbursal of subsidies, and supply constraints in the mandated domestically produced solar modules are among the other reasons cited by Upadhyay and Sharma.

More Like This

Published on March 16, 2026