惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Engineering at Meta
Engineering at Meta
D
DataBreaches.Net
云风的 BLOG
云风的 BLOG
B
Blog
T
The Blog of Author Tim Ferriss
MyScale Blog
MyScale Blog
A
About on SuperTechFans
H
Heimdal Security Blog
AI
AI
F
Full Disclosure
The Last Watchdog
The Last Watchdog
cs.AI updates on arXiv.org
cs.AI updates on arXiv.org
K
KPMG report finds enterprise disconnect between AI and its ROI | CIO
量子位
I
InfoQ
Martin Fowler
Martin Fowler
MongoDB | Blog
MongoDB | Blog
WordPress大学
WordPress大学
Hugging Face - Blog
Hugging Face - Blog
小众软件
小众软件
N
News and Events Feed by Topic
腾讯CDC
L
LINUX DO - 最新话题
Attack and Defense Labs
Attack and Defense Labs
Hacker News: Ask HN
Hacker News: Ask HN
Google Online Security Blog
Google Online Security Blog
博客园_首页
Forbes - Security
Forbes - Security
The Register - Security
The Register - Security
博客园 - 三生石上(FineUI控件)
PCI Perspectives
PCI Perspectives
V
Vulnerabilities – Threatpost
The Cloudflare Blog
酷 壳 – CoolShell
酷 壳 – CoolShell
Recent Commits to openclaw:main
Recent Commits to openclaw:main
L
LangChain Blog
Security Archives - TechRepublic
Security Archives - TechRepublic
NISL@THU
NISL@THU
博客园 - Franky
Microsoft Security Blog
Microsoft Security Blog
J
Java Code Geeks
Simon Willison's Weblog
Simon Willison's Weblog
O
OpenAI News
H
Hacker News: Front Page
Project Zero
Project Zero
P
Privacy International News Feed
Cyberwarzone
Cyberwarzone
cs.CV updates on arXiv.org
cs.CV updates on arXiv.org
大猫的无限游戏
大猫的无限游戏
Application and Cybersecurity Blog
Application and Cybersecurity Blog

Clean Tech News | The HinduBusinessLine

Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability The wait for atmanirbharta in pumped storage projects Liquidation of discoms’ regulatory assets will spur industrial use of renewable energy CERC sends out feelers for ‘capacity markets’ APTEL’s judgement is a wakeup call for discoms After a lull, why temperature spikes are likely to intensify in north India Power regulator’s nudge towards ‘market coupling’ Cruising towards Indian carbon market Renewable energy ministry approves pilot CfD scheme Renewable components supply chained to imports Despite PFBR going critical, India is still a long way from thorium utilisation Oil-starved industry looks to reignite heat pumps Key takeaways from CEA’s national power generation adequacy plan for the coming decade Storage, flexible usage and ‘virtual supply’ are key to taming peak power demand CERC settles dispute dating back a quarter century New NDC: As wars rage elsewhere, India must battle to green itself Can ‘district cooling’ temper peak power demand? Buzz in energy storage sector Electrifying effect of India Energy Stack What is slowing residential rooftop solar installations Indian solar sector hits third century International Energy Agency voices concern over rising electricity bills Well-intentioned, but politically fraught New concepts reflect NEP 2026’s modern thinking PM Surya Ghar: Where does India stand on the second anniversary of the scheme? NLC to add 650 MW of solar power capacity this year CCUS: An idea whose time has come, but at a price Why rigid control of power grid frequency should be a thing of the past Can ‘cooling-as-a-service’ fix the decarbonisation gap? Energy storage: From better to BESS Why Maharashtra’s solar pump scheme is grabbing attention globally Bids for ₹6,444 cr west-east RE transmission project Why VPPAs may not be a game-changer Shrinking gap in peak electricity demand Developers told to add BESS, shift to non-solar hours A watershed moment for battery storage capacity ‘ANEEL fuel fundamentally reshapes India’s thorium pathway’ A farmer’s fraught venture into solar generation Why the new nuclear legislation may not attract private investment Odisha’s green hydrogen pitch rides on its revenue surplus German firm Enerparc bags electricity trading licence The bigger, the better, right? Suzlon says not really India must capture carbon to unleash climate action India’s clean energy transition finds its tipping point in 2025 India faces 1.3 million transformer failures annually How floating solar can buoy up India’s green transition Rooftop solar installations gather speed; touch 22.5 GW All green talk, no greenback Mining silver and more from retired solar panels India’s NDC: To publish or not to publish COP: The rise of a new influential triad A Himalayan effort at climate change mitigation International meet on green hydrogen in New Delhi Climate action: A case of ‘a lot’ done to little avail Solar+battery vs new coal Why are so many transmission towers collapsing? Virtual PPAs, the next big thing in RE Tackling the black sheep of waste RE development in the time of data vacuum Maharashtra overtakes Tamil Nadu in Renewable Energy capacity India’s non-fossil-fuel power capacity crosses 250-GW mark Non-fossil based power generation reaches 30% Hydrogen body urges refineries to tender for GH2 Blues of the global green hydrogen story A booster shot for the recycling sector Power regulator proposes tweaks to deviation settlement mechanism Global hydrogen demand up 2% in two years: Report How to accurately peg ‘additionality’ in carbon credits Adani to sell thermal power at ₹6.07 a kWhr Rossiya set to cleave a green sea route Green bonds: How to overcome the challenge of fading ‘greenium’
Powering the plough: What PM-KUSUM scheme must do to give a fillip to farmers
By K Bharat Kumar · 2025-10-13 · via Clean Tech News | The HinduBusinessLine
The scheme aims to add 34,800 MW of solar capacity by March 2026. 

The scheme aims to add 34,800 MW of solar capacity by March 2026.  | Photo Credit: Getty Images

Progress under the PM-KUSUM scheme has remained a mixed bag. Launched in 2019, and scheduled to end in March 2026, it is aimed at adding 34,800 MW of solar capacity by that timeline, with Central financial support of ₹34,422 crore.

An analysis put out last year by the Centre for Science and Environment (CSE) points out that the Pradhan Mantri Kissan Urja Evam Utthaan Mahabhiyaan (PM-KUSUM) scheme has only achieved about 30 per cent of its overall targets since inception.

According to replies given to a question in the Lok Sabha in August this year, as on 30 June, it is estimated that the installation of solar pumps has saved 580 million litres of diesel per annum and solar plants under PM-KUSUM have helped cut out 6 million tonnes of carbon dioxide emissions.

The scheme is structured around three main components: A (decentralised solar power plants), B (standalone solar pumps), and C (solarisation of grid-connected pumps). The highest achievement (71 per cent) against targets set has been under Component B, which covers standalone solar pump sets up to 7.5 HP.

Replacing diesel pumps with solar variants is straightforward, says Vivek Gupta, director, Oswal Pumps. “The technology is proven, deployment involves fewer regulatory hurdles, and generous subsidies are available.” Central financial assistance covers 30 per cent of the benchmark cost (or 50 per cent in special category States), allowing the farmer to contribute a manageable remaining portion.

Conditions applied

The CSE report points out that farmers who have moved from diesel or electric pumps to solar-powered pumps have found it profitable, but only if the pumps they have installed are of the correct size. Farmers in Haryana, according to the report, are saving up to ₹55,000 per year after making the shift. The other benefit for the farmer is the ability to irrigate fields during the day, instead of having to rely on power from the grid during the night in the time slot set apart for agricultural electricity supply.

The pace of solar pump installations contrasts with the slower uptake in the other major components, which are facing bottlenecks.

Component A, focused on setting up decentralised grid-connected solar or renewable energy plants (up to 2 MW) on farmers’ land, has achieved only 6.5 per cent of its target as of September 2025. This segment has been hampered by the need for significant capital expenditure. Other bottlenecks include securing land, challenging discom agreements, and time-consuming regulatory approvals.

Component C, which supports the solarisation of existing grid-connected pumps, is currently at 16.5 per cent penetration. Progress, on this front, has been dragged down by the local energy context, says Oswal’s Gupta. “Many areas have access to nearly zero running-cost grid connections, which dilutes the need to adopt solar solutions.”

He views the overall scheme as a valuable learning rather than a failure. “The variation in adoption across components reflects the differing complexity, economics, and farmer readiness rather than flaws in the scheme itself. Component B demonstrates that when incentives, simplicity, and execution converge, adoption can be rapid.”

The slower uptake in Components A, C, and D highlights areas where structural, regulatory, and awareness interventions are still needed. The scheme’s current performance validates what works and where focused efforts are needed in the final year to reach targets.”

Customised approach

The CSE report offers a roadmap to quicken implementation. It recommends that cheap electricity, while appreciated by farmers, diminishes the incentive to transition to solar and increases the State’s subsidy burden. Further inefficiencies arise from pump sizing. The report cites Dr Debajit Palit, Professor of Energy at the NTPC School of Business, as saying that to ensure financial viability, pump sizes must be tailored to the land size and water requirements of different areas, rather than maintaining a uniform national standard.

The CSE also recommends decentralised implementation. Agencies with knowledge of farmer demographics and their needs on the ground are best placed to cater to them, rather than a centralised body.

To address viability issues, the report states, farmers must be allowed the option to pay upfront costs in instalments, and seeks an increase in the Central Financial Assistance to account for the rise in solar module prices following the Covid-19 pandemic.

The Standing Committee on Energy, in its second report on demand for grants for FY25, had highlighted the fact that many districts in India have become water-deficient. Hence, the subsidy for solar pumps of only up to 7.5 HP (horsepower) proved insufficient for farmers. It had recommended that the Ministry conduct a detailed study to “understand the ground situation and accordingly modify the component.”

Published on October 13, 2025