惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

酷 壳 – CoolShell
酷 壳 – CoolShell
D
DataBreaches.Net
C
Check Point Blog
雷峰网
雷峰网
小众软件
小众软件
GbyAI
GbyAI
美团技术团队
P
Proofpoint News Feed
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
罗磊的独立博客
大猫的无限游戏
大猫的无限游戏
WordPress大学
WordPress大学
MyScale Blog
MyScale Blog
The Cloudflare Blog
阮一峰的网络日志
阮一峰的网络日志
Apple Machine Learning Research
Apple Machine Learning Research
Y
Y Combinator Blog
Jina AI
Jina AI
爱范儿
爱范儿
Last Week in AI
Last Week in AI
MongoDB | Blog
MongoDB | Blog
I
InfoQ
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
博客园 - 司徒正美

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability
Shrinking gap in peak electricity demand
By Team BL · 2026-01-05 · via Clean Tech News | The HinduBusinessLine

The gap between summer and winter peak electricity demand in India is shrinking — a sign of dangerous global warming.

Vinay Pabba, CEO of renewable energy company Vibrant Energy, says in his LinkedIn post that the peak winter demand is almost the same as the peak summer demand registered on June 10, 2025 — 242 GW. “This has never happened in the past,” he observes, adding that in the past, the gap between winter and summer peak demand has been substantial.

Data cited by Pabba shows that in the five years between 2021 and 2025, the summer peak demand has been higher than winter peak by 11,144 MW, 15,051 MW, 29,651 MW, 26,042 MW and 8,800 MW.

If January peak demand grows further, 2025-26 will be a notable year where the winter peak demand actually exceeds summer peak demand. “If this is not a ‘red flag’ for climate change, what is?” says Pabba.

More work needed to drive adoption of rooftop solar

The Pradhan Mantri Surya Ghar Muft Bijli Yojana has added 4.9 GW within a year of its launch. Before PMSGY, rooftop solar uptake in India was largely limited to commercial and industrial consumers. For households, factors such as high upfront costs, complex processes, and low awareness acted as barriers.

However, many hurdles still remain in the implementation of the scheme, which, if addressed, could boost rooftop solar adoption, says an analysis of the Institute for Energy, Economics and Financial Analysis (IEEFA).

Just 22.7 per cent of applications have translated into completed projects, it says, “reflecting bottlenecks in financing, vendor capacity, and approvals”. Furthermore, with only about 13 per cent of the targeted installations completed so far, the road to one crore solar homes remains long, says IEEFA. It notes that low consumer awareness about the scheme, difficulties in loan access, delays in approvals and subsidy disbursals, supply constraints under the ‘domestic content requirement’ policy and portal glitches are hampering rapid adoption.

More Like This

Published on January 5, 2026