惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

WordPress大学
WordPress大学
博客园 - 司徒正美
I
InfoQ
宝玉的分享
宝玉的分享
G
Google Developers Blog
J
Java Code Geeks
Martin Fowler
Martin Fowler
The GitHub Blog
The GitHub Blog
H
Hackread – Cybersecurity News, Data Breaches, AI and More
罗磊的独立博客
腾讯CDC
F
Fortinet All Blogs
A
About on SuperTechFans
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Recent Announcements
Recent Announcements
Last Week in AI
Last Week in AI
B
Blog RSS Feed
博客园 - 聂微东
D
DataBreaches.Net
Hugging Face - Blog
Hugging Face - Blog
The Cloudflare Blog
L
LangChain Blog
Microsoft Azure Blog
Microsoft Azure Blog
aimingoo的专栏
aimingoo的专栏

Clean Tech News | The HinduBusinessLine

Why India should favour a ‘community-trusteeship’ economic model Meeting grid challenges in times of high RE presents a big business opportunity Odisha to amend land lease rules to attract solar investment Move to extend ISTS waiver The long and the short of decarbonising Tata Steel Time to R&D a way out of solar imports Solex Energy in talks for solar venture in Ghana How solar thermal can ‘green’ manufacturing processes The missing element in India’s rare-earths scheme Why, at 42.79%, record RE penetration is as much a cause for worry as cheer Solar self-reliance may cost India ₹30,000 cr this year No reply from CEA: CERC Utah bets on nuclear to power AI-driven data centre growth RE sector awaits easing of generation forecast norms Agastya Energy secures ₹4,000-cr loan from IREDA ‘Right of way’ issue is killing us: Wind industry RE projects: Build more, save ₹2.27 lakh cr Integrating climate finance into the banking regulatory framework GEF: The conservation kitty just shrank 36% The fresh wind turning Suzlon 2.0 turbines An e-dumper locator for safe disposal of electronic waste Smart meter rollout is impeded by its ambiguous status How protected are power plants from the risk of flooding? New coating steps up green hydrogen output, lowers cost India’s nuclear power ambitions face a tariff test Electrifying energy consumption India’s ambitions for nuclear energy face a tariff test How India’s ethanol hedge is paying back Why Tamil Nadu needs more verified clean power Wartsila’s fresh pitch to industry — grid stability
Renewable energy ministry approves pilot CfD scheme
By Team BL · 2026-04-13 · via Clean Tech News | The HinduBusinessLine

The Ministry of New and Renewable Energy (MNRE) has approved a pilot Contracts for Difference (CfD) scheme, to be implemented by Solar Energy Corporation of India (SECI) for 500 MW/ 1,500 MWh, focused on non-solar hours.

A CfD is a two-sided price hedge: the renewable generator is paid the difference when market prices fall below a pre-agreed strike price, and pays back when prices exceed it.

India’s version is tailored to solve a specific problem — the evening peak. “By targeting the three non-solar hours, MNRE’s new CfD guidelines directly address India’s evening peak and indirectly encourage pairing of solar with BESS for flexible dispatch,” notes Vinay Pabba, CEO, Vibrant Energy.

Some design choices are worth noting. The 12-year tenor is shorter than the global norm of 15–20 years. This could push up bid prices, as developers price in uncertainty beyond the contract period. If CfDs are to scale up meaningfully in India, a longer tenor may be necessary.

The plan envisages a ₹76-crore stabilisation fund. This is “fiscally conservative and politically intelligent,” says Pabba, while also pointing out that by capping the government’s risk to ₹76 crore and passing on the excess risk of the pool losses to SECI, bankability can get diluted for generators.

The mandated bidding sequence — ‘Green Day Ahead Market’ to ‘Day Ahead Market’ to Real Time Market — is a strong intervention. It prioritises green market participation, reduces volumes, and could minimise disputes around curtailment and non-clearance.

Less orthodox is the 30:70 sharing of gains and losses between the generator and the CfD pool. In classic CfDs, generators face the full upside and downside relative to the strike price. Diluting this linkage may weaken price signals and reduce incentives for optimal market behaviour. Similarly, the requirement that renewable energy certificate revenues from brown market sales should be credited to the pool strengthens the scheme’s finances, but removes a potential upside for developers — again likely to be reflected in higher bids.

Overall, the pilot is less about adding megawatts and more about integrating renewables into the grid — specifically to meet demand when solar is unavailable. That is where India’s next energy challenge lies.

Green India mission limps

The government runs two key initiatives under the National Mission for a Green India: Green India Mission, aimed at protecting, restoring and enhancing India’s forest cover; and forest fire prevention and management. Yet the Ministry for Environment, Forests and Climate Change has not been able to spend the money allocated to it. A parliamentary standing committee that went into the financial demands of the ministry has noted that Budget 2025-26 had allocated ₹220 crore to the mission and this was reduced to ₹95.7 crore at the ‘revised estimates’ stage — 44 per cent of the initial allocation. The ministry admitted to the committee that the reduced allocation “slows afforestation and eco-restoration activities, reduces the area of degraded forests taken up for treatment, delays new landscape-based interventions and constrains support to Joint Forest Management Committees (JFMCs), capacity building, micro-planning, and livelihood activities linked to non-timber forest produce (NTFP) and eco enterprises”. However, the ministry could not spend even the reduced allocation. Till end -January this year, it had spent only ₹49.95 crore, or 43 per cent of the reduced revised allocation. The committee has asked the ministry to “examine the slow progress of funds utilisation”.

More Like This

Published on April 13, 2026