惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

雷峰网
雷峰网
宝玉的分享
宝玉的分享
I
InfoQ
P
Privacy International News Feed
V
V2EX
IT之家
IT之家
S
SegmentFault 最新的问题
D
Darknet – Hacking Tools, Hacker News & Cyber Security
V2EX - 技术
V2EX - 技术
C
CERT Recently Published Vulnerability Notes
C
Check Point Blog
The Register - Security
The Register - Security
爱范儿
爱范儿
博客园 - 三生石上(FineUI控件)
AWS News Blog
AWS News Blog
M
MIT News - Artificial intelligence
C
Cyber Attacks, Cyber Crime and Cyber Security
F
Fortinet All Blogs
B
Blog
N
Netflix TechBlog - Medium
B
Blog RSS Feed
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
Last Week in AI
Last Week in AI
T
Threatpost
Forbes - Security
Forbes - Security
U
Unit 42
A
Arctic Wolf
K
KPMG report finds enterprise disconnect between AI and its ROI | CIO
P
Palo Alto Networks Blog
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
Recorded Future
Recorded Future
L
Lohrmann on Cybersecurity
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
P
Proofpoint News Feed
月光博客
月光博客
Spread Privacy
Spread Privacy
MongoDB | Blog
MongoDB | Blog
Jina AI
Jina AI
I
Intezer
V
Visual Studio Blog
阮一峰的网络日志
阮一峰的网络日志
The Hacker News
The Hacker News
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
L
LangChain Blog
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
博客园_首页
MyScale Blog
MyScale Blog
腾讯CDC
cs.AI updates on arXiv.org
cs.AI updates on arXiv.org
量子位

Comments for Construction Management

Bricklaying robots from the Netherlands target the UK - Construction Management Subsidising declining apprenticeship numbers just isn’t the answer  - Construction Management Wellbeing: good intentions must turn into meaningful outcomes - Construction Management Who owns construction knowledge in the age of AI? - Construction Management CITB fund supports employer-led net-zero skills projects - Construction Management McLaren Construction deploys autonomous robots on its sites - Construction Management Revised lifecycle costing standard sets out handover best practice - Construction Management Mental health experiences leads PM to create practical help resource - Construction Management How BAM planned the demolition of Gateshead flyover in 4D - Construction Management Meet the prisoners building homes - Construction Management FMB pilot aims to build pipeline of site-ready tradespeople - Construction Management New mental health code aims to stop workplace pressures reaching crisis point - Construction Management Heat on site: is it time for a maximum working temperature? - Construction Management Estate management leadership must be driven by data CITB launches accelerated apprenticeships Shetlanders mull ditching ferries for subsea tunnels between islands Modelling the unmortared: how Aecom helped build the 2026 Serpentine Pavilion Leaders must ‘walk in the shoes’ of their workforce Mind the gap: the building control recruitment crisis facing UK local authorities Tell us about rogue operators, Building Safety Regulator urges - Construction Management Construction management degree compressed to two years British Safety Council questions blanket approach to workplace heat limit Humanoid construction robots: the key to onsite productivity? Building safety reform: the impact on team roles Why concealed work needs checking before close-up New data centre approved for Redhill to meet surging London demand ITFG publishes built environment competency guidance ‘How do we structure a contract claim?’ Construction is overlooking its most job-ready workforce Stop hiring for confidence, start hiring for capability Sizewell C skills programme delivers employees and social value MCIOB develops own AI software for SMEs using AI Warm Homes Plan: can we deliver retrofit that is fit for the future? Middle East conflict fuelling construction volatility, says Gleeds Construction firm fined for multiple site welfare failings Mental health in construction: improvements are welcome, but there’s still work to be done The construction gender gap is a leadership problem A deep dive into BAM’s approach to digital construction ‘No more energy bills’: Housebuilder adopts Finnish timber system touted as better than Passivhaus Late payment reform toughest in over 25 years, government says One to Watch: Tasha Jawad Tomorrow’s Leaders champion Controversial Stonehenge tunnel plans scrapped Controversial Stonehenge tunnel plans scrapped What tougher English rules mean for construction employers Why PPE must fit the modern workforce Building supplier pledges support for ex-military construction careers Prostate cancer in construction: do you know the risks? Prostate cancer in construction: do you know the risks? Why the odds are stacked against the PM’s housebuilding plans Hospital 2.0: Industrialising healthcare construction How do contractors innovate? Why construction needs to think differently about quality
Mulalley awarded £1.8m in landmark post-Grenfell cladding case - Construction Management
Phil Clark · 2026-07-02 · via Comments for Construction Management

Contractor Mulalley has been awarded £1.8m in a significant legal judgement related to the Building Safety Act (BSA).

Last week, a High Court judge ruled that the German parent company of a UK cladding manufacturer and supplier was liable for the contractor’s costs – through a building liability order (BLO) – to replace a defective cladding system.

Justice Pepperall’s judgment in the case Mulalley & Co. Ltd v Sto Ltd & Sto SE & Co awarded an 87.5% contribution to its costs, which is above the 67%-80% range typically granted for similar claims.

Law firm Charles Russell Speechlys, which represented Mulalley, said the high apportionment was due to the “inherently defective product supported by misleading marketing material”.

Mulalley was appointed by client Chelmer Housing Partnership to design and construct the refurbishment and extension of Parkside Court, Chelmsford, Essex. The work included the design and installation of external cladding on the 54-unit residential tower block.

Mulalley subcontracted the cladding works, including the supply and installation of the StoTherm Classic System, which was manufactured and supplied by Sto UK.

Cladding remedial works

Following the Grenfell tower fire, Chelmer investigated Parkside Court and identified that the cladding was defective. It subsequently made claims against Mulalley, which as a result, undertook remedial works in 2022, which included the removal and replacement of the defective cladding.

Mulalley then sought to recover its costs from Sto’s German owner under the Building Safety Act 2022. Sto went into voluntary administration and Sto Germany failed to defend the proceedings, so a judgment in default was sought late last year.  

The contractor originally requested £3.7m for the remedial works, which the judge revised down to just over £2m because “the remedial works extended beyond the work necessary to remedy the defective render system”.

Rebecca Morjaria, Charles Russell Speechlys senior associate in the Construction, Engineering & Projects team, said the ruling sent a clear message to product manufacturers that the Building Safety Act has real reach, and “structuring around a subsidiary will not insulate a group from liability where a defective product has been placed on the market”.

She added: “This is one of the first substantive contribution claims under the Building Safety Act to result in a BLO, and the first to do so by way of default judgment against an overseas parent company.”

Story for CM? Get in touch via email: [email protected]