惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

D
Docker
爱范儿
爱范儿
人人都是产品经理
人人都是产品经理
博客园 - 司徒正美
cs.AI updates on arXiv.org
cs.AI updates on arXiv.org
量子位
罗磊的独立博客
cs.CL updates on arXiv.org
cs.CL updates on arXiv.org
小众软件
小众软件
C
Cybersecurity and Infrastructure Security Agency CISA
Cyberwarzone
Cyberwarzone
大猫的无限游戏
大猫的无限游戏
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
雷峰网
雷峰网
Simon Willison's Weblog
Simon Willison's Weblog
The Cloudflare Blog
博客园 - 三生石上(FineUI控件)
D
Darknet – Hacking Tools, Hacker News & Cyber Security
C
Cyber Attacks, Cyber Crime and Cyber Security
博客园_首页
博客园 - 叶小钗
V
Vulnerabilities – Threatpost
T
The Exploit Database - CXSecurity.com
T
Tailwind CSS Blog
IT之家
IT之家
博客园 - 聂微东
Spread Privacy
Spread Privacy
V2EX - 技术
V2EX - 技术
S
Security Affairs
宝玉的分享
宝玉的分享
V
V2EX
C
Cisco Blogs
博客园 - Franky
美团技术团队
酷 壳 – CoolShell
酷 壳 – CoolShell
月光博客
月光博客
S
Securelist
J
Java Code Geeks
Webroot Blog
Webroot Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
P
Proofpoint News Feed
Last Week in AI
Last Week in AI
L
LINUX DO - 热门话题
NISL@THU
NISL@THU
WordPress大学
WordPress大学
W
WeLiveSecurity
T
Threatpost
freeCodeCamp Programming Tutorials: Python, JavaScript, Git & More
腾讯CDC
阮一峰的网络日志
阮一峰的网络日志

Comments for Construction Management

Subsidising declining apprenticeship numbers just isn’t the answer  - Construction Management Who owns construction knowledge in the age of AI? - Construction Management CITB fund supports employer-led net-zero skills projects - Construction Management McLaren Construction deploys autonomous robots on its sites - Construction Management Revised lifecycle costing standard sets out handover best practice - Construction Management Mulalley awarded £1.8m in landmark post-Grenfell cladding case - Construction Management Mental health experiences leads PM to create practical help resource - Construction Management How BAM planned the demolition of Gateshead flyover in 4D - Construction Management Meet the prisoners building homes - Construction Management FMB pilot aims to build pipeline of site-ready tradespeople - Construction Management New mental health code aims to stop workplace pressures reaching crisis point - Construction Management Heat on site: is it time for a maximum working temperature? - Construction Management Estate management leadership must be driven by data CITB launches accelerated apprenticeships Shetlanders mull ditching ferries for subsea tunnels between islands Modelling the unmortared: how Aecom helped build the 2026 Serpentine Pavilion Leaders must ‘walk in the shoes’ of their workforce Mind the gap: the building control recruitment crisis facing UK local authorities Tell us about rogue operators, Building Safety Regulator urges - Construction Management Construction management degree compressed to two years British Safety Council questions blanket approach to workplace heat limit Humanoid construction robots: the key to onsite productivity? Why concealed work needs checking before close-up New data centre approved for Redhill to meet surging London demand ITFG publishes built environment competency guidance ‘How do we structure a contract claim?’ Construction is overlooking its most job-ready workforce Stop hiring for confidence, start hiring for capability Sizewell C skills programme delivers employees and social value MCIOB develops own AI software for SMEs using AI Warm Homes Plan: can we deliver retrofit that is fit for the future? Middle East conflict fuelling construction volatility, says Gleeds Construction firm fined for multiple site welfare failings Mental health in construction: improvements are welcome, but there’s still work to be done The construction gender gap is a leadership problem A deep dive into BAM’s approach to digital construction ‘No more energy bills’: Housebuilder adopts Finnish timber system touted as better than Passivhaus Late payment reform toughest in over 25 years, government says One to Watch: Tasha Jawad Tomorrow’s Leaders champion Controversial Stonehenge tunnel plans scrapped Controversial Stonehenge tunnel plans scrapped What tougher English rules mean for construction employers Why PPE must fit the modern workforce Building supplier pledges support for ex-military construction careers Prostate cancer in construction: do you know the risks? Prostate cancer in construction: do you know the risks? Why the odds are stacked against the PM’s housebuilding plans Hospital 2.0: Industrialising healthcare construction How do contractors innovate? Why construction needs to think differently about quality
Building safety reform: the impact on team roles
Samantha Mepham · 2026-05-20 · via Comments for Construction Management

The Building Safety Act has been felt differently across different roles. Samantha Mepham reports on how the new regime is being experienced by members of Rider Levett Bucknall’s multidisciplinary team.

Building Safety Act RLB - how the new regime is being experienced by members of Rider Levitt Bucknall’s multidisciplinary team.
The Building Safety Act is being felt differently across teams. Image: RLB

The last few years have brought welcome and long-overdue change to building safety reform in the built environment. Registration requirements for higher-risk buildings (HRBs) came into force in April 2023, followed by Gateway 2 and 3 approvals, alongside the Building Safety Regulator (BSR) becoming a standalone regulator under the MHCLG.

Together, these developments mark a decisive and much-needed shift in the approach to health and safety across the industry.

But have they made a real difference to the safety in the built environment? And how have the changes impacted the different roles within the sector? Here, RLB stakeholders discuss the impact of the Building Safety Act on their roles, whether they feel progress is truly being made, and what the long-term consequences of the BSA will be for the industry.

Mich Wizenberg, partner, fire

There was no doubt that the Building Safety Act was the step change the sector needed. The intention to make the industry more collaborative, ultimately resulting in more detailed design and information at an early stage to prevent unavoidable mistakes on site, was good.

Yet, in reality, what we have seen is a breakdown of communication between the industry and the Building Safety Regulator at Gateway 2, leading to delays and cost implications. Since the BSR became an independent body, this has improved, but there is still apprehension around Gateway 3 and how this will be handled.

We just need to ensure that we have the right people in place, with the right knowledge to be the gatekeepers of building safety.

Paul Sambrook and Jeremy Spill, partners, cost management

The building safety reform was vitally important, but the way the governance has been implemented has created significant disruption and additional cost across the industry. This is now affecting the viability of many projects, particularly in the residential sector. 

Despite the government’s ambition to build 1.5 million new houses, growing uncertainty is causing investors to hesitate. With substantial costs required upfront at the pre-construction stage, and no certainty around approval timelines, build starts, or project delivery, the level of risk has grown.

The introduction of the Building Safety Levy on 1 October this year will add further financial pressure. To restore momentum, there must be meaningful incentives to revitalise the housing market, which in turn will help rebuild investor confidence and support much-needed housing delivery.

Sarah Bromfield, senior associate, project management 

From a project management point of view, the obvious impact of the building safety governance has been the delays for projects awaiting gateway approval. None of the parties involved had been through the new regulation before, and the gateway stages were often complex, with funding for developments deriving from several funding streams, resulting in a need to maintain relationships with different stakeholders with different priorities.

One of the most important stakeholders has always been the local communities in which these developments are planned. Too often, they were promised new homes or regeneration projects only to be left with hoardings, stalled construction or abandoned sites. Clear and consistent communication has been essential throughout the process, helping manage expectations and maintain trust.

While the challenges have been significant, valuable lessons have been learned and the system is gradually becoming more streamlined and effective.

Peter Hayakawa, partner, sustainability 

For us in the sustainability team, the introduction of the golden thread of Information and digital twins brings data integrity that helps us in our role. This data thread shows whether lower-carbon materials have been designed into the build, and materials can’t be value-engineered out without a process of recording them.

However, the Building Safety Act has also highlighted the need for advance testing and building of robust data sets for the use of new materials like low-carbon cement. With climate change impacting our buildings more rapidly every day, we don’t have decades left to test new materials but must move faster to ensure that lower-carbon and more sustainable materials can be used with confidence. This, in turn, would give us the confidence to build safely and sustainably.

Steve Boulter, senior associate, BSA adviser

Although the building safety governance covers all the built environment, the biggest impact has been on high-risk buildings (HRBs). In most cases, this has meant residential buildings, with the guidance steered primarily towards this sector. This has resulted in several clients asking for help to navigate the regulations across other sectors – for example, healthcare providers, particularly hospitals, which often have HRBs as part of their estates.

Finding the competence and skills required for the new roles created has been a wider industry challenge. For example, the building regulations principal designer (BRPD) is a completely new role with new templates, policies and procedures. An integrated approach across disciplines has been key – for example, working with PM and CM teams to explain new responsibilities and fire advisers to understand the fire risks and liability within each project.

Ultimately, the governance is advocating that all those who play a part in the design and build should look at the building holistically, which ultimately is a good thing. 

Aron Kirsh, senior associate, built asset consultancy

Working as a built asset consultant, we recognise that existing buildings present greater challenges than new buildings in achieving compliance with the Building Safety Act. While new buildings are designed according to current guidance, ensuring compliance, existing buildings undergoing refurbishment present challenges in relation to the actual construction form and inherent defects, both of which may not be apparent when reviewing as-built information. 

There is also the challenge of carrying out compliant improvements to one specific area of a building, only for that work to interface with elements of the building that remain non-compliant. This creates uncertainty around accountability and raises important questions about where the responsibility lies for the overall safety and compliance of the building, given that retrospective works are often carried out in isolation from wider building elements.

The processes, especially using a common data environment in line with the golden thread of information, which all parties must feed into, have helped identify who owns which parts of the governance and provide a single source of truth, aiding those who need it. However, its effectiveness relies on good-quality data. 

Collaboration and sharing risk

While there is no doubt the legislation was necessary and there is broad agreement that the new governance is making the design and construction safer, it has had a significant impact on developments, with viability, time, stakeholder relationships, and often contractor-client and investor relationships affected. 

The positive news, however, is that lessons are being learned, and areas of responsibility and ownership are beginning to be established.

Moving forward, true collaboration will be essential, bringing together the right people, with the right expertise, at the right stage, while ensuring that risk is understood and shared appropriately across all parties involved in the design-and-build process.

Samantha Mepham is national head of health and safety at RLB UK.

Story for CM People? Get in touch via email: [email protected]