惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

Recent Commits to openclaw:main
Recent Commits to openclaw:main
SecWiki News
SecWiki News
Webroot Blog
Webroot Blog
Application and Cybersecurity Blog
Application and Cybersecurity Blog
cs.CV updates on arXiv.org
cs.CV updates on arXiv.org
N
News and Events Feed by Topic
Recent Announcements
Recent Announcements
Help Net Security
Help Net Security
Jina AI
Jina AI
O
OpenAI News
雷峰网
雷峰网
Exploit-DB.com RSS Feed
Exploit-DB.com RSS Feed
博客园 - 三生石上(FineUI控件)
W
WeLiveSecurity
Schneier on Security
Schneier on Security
T
Threat Research - Cisco Blogs
IT之家
IT之家
K
KPMG report finds enterprise disconnect between AI and its ROI | CIO
Vercel News
Vercel News
N
News and Events Feed by Topic
T
The Exploit Database - CXSecurity.com
爱范儿
爱范儿
Recorded Future
Recorded Future
Google Online Security Blog
Google Online Security Blog
TaoSecurity Blog
TaoSecurity Blog
美团技术团队
Engineering at Meta
Engineering at Meta
Security Latest
Security Latest
V
V2EX
T
Tailwind CSS Blog
P
Privacy & Cybersecurity Law Blog
让小产品的独立变现更简单 - ezindie.com
让小产品的独立变现更简单 - ezindie.com
S
Schneier on Security
B
Blog
www.infosecurity-magazine.com
www.infosecurity-magazine.com
博客园 - 【当耐特】
PCI Perspectives
PCI Perspectives
GbyAI
GbyAI
I
Intezer
Spread Privacy
Spread Privacy
Security Archives - TechRepublic
Security Archives - TechRepublic
Cloudbric
Cloudbric
V
Visual Studio Blog
MongoDB | Blog
MongoDB | Blog
Forbes - Security
Forbes - Security
The Last Watchdog
The Last Watchdog
aimingoo的专栏
aimingoo的专栏
C
CERT Recently Published Vulnerability Notes
A
About on SuperTechFans
罗磊的独立博客

The Register - Special Features: The Future of the Datacenter

AI is rewriting how power flows through the datacenter All aglow about DCs, investors launch $300M at microreactor startup Why do bit barns keep bumping up our bills, Senators ask DC operators Delays? What delays? Oracle insists its $300B cloud contract with OpenAI is on track Activist groups urge Congress to pause datacenter buildouts Bezos-backed Unconventional AI addresses datacenter power Meta and Google tap NextEra to feed their hungry datacenters Datacenters accused of hoarding grid capacity Amazon’s Trainium3 is the latest to conform to Nvidia’s mold Palantir aims to help energy companies meet AI power crunch Datacenters planned for Scotland could drain a loch of power Datacenters must generate their own power or fail HPE to ship rack-scale AI system using AMD's Helios in 2026 London grid crunch delays new housing amid datacenter boom Britain plots atomic reboot as datacenter demand surges OCP learning how to get quantum computers into existing DCs AMD taking AI fight to Nvidia with Helios rack-scale system Nvidia's AI factory dream gets the Omniverse treatment Qualcomm announces AI accelerators and racks they'll run in
Galactic Brain space datacenter coming in 2027, pledges startup Aetherflux
2025-12-10 · via The Register - Special Features: The Future of the Datacenter

Space startup Aetherflux says it plans to put its first data center satellite into orbit during the first quarter of 2027.

The company, founded and run by Baiju Bhatt, co-founder of financial firm Robinhood, sees satellites as a time-saving alternative to terrestrial data center construction, which can take five or more years.

"The race for artificial general intelligence is fundamentally a race for compute capacity, and by extension, energy," said Bhatt in a statement. "The elephant in the room is that our current energy plans simply won't get us there fast enough."

Amid the baffling absence of funding constraints, efforts to scale artificial intelligence remain gated by the availability of data center capacity and energy. Mundane concerns like land acquisition, utility connections, and creating sturdy structures can be bypassed for the cost of lifting kit beyond the Kármán line.

The cost to launch 1 kg on SpaceX's Falcon Heavy comes to about $1,400, according to recent estimates. Per Google's calculations, if launch costs drop to around $200 per kg, as projected by 2030, the outlay required to set up and run space-based data centers would be comparable to ground-based operations.

Bhatt calls the satellite constellation project "Galactic Brain," though the solar-powered data satellites won't have such a vast remit – they'll just be orbiting the Earth alongside a growing number of other objects.

Aetherflux joins Orbits Edge and Starcloud, not to mention Google and Nvidia, as companies with ambitions to put data centers in space, the final (minimally regulated) frontier now that data centers have been sunk into the ocean and buried underground.

Bhatt's biz was founded in 2024 and scored $60 million of funding for the purpose of demonstrating the viability of beaming energy from space to Earth via infrared laser. It aims to launch a satellite capable of doing so in 2026. The company's space data center plans represent an expansion on its initial vision.

Aetherflux isn't yet ready to talk about pricing. "Our first product will focus on AI inference and general-purpose compute for customers," a company spokesperson told The Register by email. "We do not have a price point to disclose at this time."

But for a to-be-determined fee, the company aims to provide "multi-gigabit level bandwidth with nearly constant uptime."

When the company gets around to doing regular launches, it anticipates sending about 30 satellites up at a time on a SpaceX Falcon 9 or equivalent launcher. If SpaceX's Starship becomes an option, Aetherflux could orbit 100 or more datacenter sats in a single launch.

Asked about the life expectancy of its birds, given that GPUs may not last more than a few years under high utilization and radiation, Aetherflux's spokesperson said: "Our approach is to continuously launch new hardware and quickly integrate the latest architectures. Older systems will run lower priority tasks and serve out the full useful lifetime of high-end GPUs." ®