惯性聚合 高效追踪和阅读你感兴趣的博客、新闻、科技资讯
阅读原文 在惯性聚合中打开

推荐订阅源

V2EX - 技术
V2EX - 技术
Threat Intelligence Blog | Flashpoint
Threat Intelligence Blog | Flashpoint
T
Threat Research - Cisco Blogs
T
The Exploit Database - CXSecurity.com
S
Schneier on Security
S
Securelist
P
Privacy & Cybersecurity Law Blog
Scott Helme
Scott Helme
T
Threatpost
C
Cybersecurity and Infrastructure Security Agency CISA
L
LINUX DO - 热门话题
Cyberwarzone
Cyberwarzone
Cisco Talos Blog
Cisco Talos Blog
量子位
博客园 - Franky
cs.CL updates on arXiv.org
cs.CL updates on arXiv.org
Latest news
Latest news
T
Troy Hunt's Blog
N
News | PayPal Newsroom
Google Online Security Blog
Google Online Security Blog
Apple Machine Learning Research
Apple Machine Learning Research
N
Netflix TechBlog - Medium
小众软件
小众软件
P
Palo Alto Networks Blog
Spread Privacy
Spread Privacy
C
Cyber Attacks, Cyber Crime and Cyber Security
C
Check Point Blog
aimingoo的专栏
aimingoo的专栏
WordPress大学
WordPress大学
L
Lohrmann on Cybersecurity
L
LINUX DO - 最新话题
D
Darknet – Hacking Tools, Hacker News & Cyber Security
钛媒体:引领未来商业与生活新知
钛媒体:引领未来商业与生活新知
The Last Watchdog
The Last Watchdog
S
Security @ Cisco Blogs
P
Privacy International News Feed
Last Week in AI
Last Week in AI
Microsoft Security Blog
Microsoft Security Blog
T
Tailwind CSS Blog
博客园_首页
云风的 BLOG
云风的 BLOG
V
Vulnerabilities – Threatpost
D
DataBreaches.Net
Recent Announcements
Recent Announcements
酷 壳 – CoolShell
酷 壳 – CoolShell
CTFtime.org: upcoming CTF events
CTFtime.org: upcoming CTF events
罗磊的独立博客
Engineering at Meta
Engineering at Meta
Forbes - Security
Forbes - Security
T
Tenable Blog

The Register - Special Features: The Future of the Datacenter

AI is rewriting how power flows through the datacenter All aglow about DCs, investors launch $300M at microreactor startup Why do bit barns keep bumping up our bills, Senators ask DC operators Delays? What delays? Oracle insists its $300B cloud contract with OpenAI is on track Galactic Brain space datacenter coming in 2027, pledges startup Aetherflux Activist groups urge Congress to pause datacenter buildouts Bezos-backed Unconventional AI addresses datacenter power Meta and Google tap NextEra to feed their hungry datacenters Datacenters accused of hoarding grid capacity Amazon’s Trainium3 is the latest to conform to Nvidia’s mold Palantir aims to help energy companies meet AI power crunch Datacenters planned for Scotland could drain a loch of power Datacenters must generate their own power or fail HPE to ship rack-scale AI system using AMD's Helios in 2026 Britain plots atomic reboot as datacenter demand surges OCP learning how to get quantum computers into existing DCs AMD taking AI fight to Nvidia with Helios rack-scale system Nvidia's AI factory dream gets the Omniverse treatment Qualcomm announces AI accelerators and racks they'll run in
London grid crunch delays new housing amid datacenter boom
Dan Robinson Dan Robinson · 2025-12-02 · via The Register - Special Features: The Future of the Datacenter

The Future of the Datacenter

Assembly report urges clearer planning as soaring AI power demands strain capital's network

Access to electricity has become a major source of delay for housebuilding in London, and datacenters are inevitably tied up in this, leading to calls for greater oversight of energy and construction planning so that they keep pace with demand.

A report published on Monday by the London Assembly, the elected body that holds the mayor and their administration to account, highlights the increasing pressure on the UK capital's electricity grid. It says that there is a need for better planning to address both IT infrastructure and new homes, especially as some areas are already overstretched.

It points to the grid reaching full capacity in some areas of West London back in 2022, contributing to delays on new housing developments. This is an area where there is a concentration of datacenters, which were blamed for the problems, as The Register reported at the time.

The Greater London Authority (GLA) worked with National Grid and regulator Ofgem to secure short-term fixes, and this enabled over 12,000 homes to be connected by early 2025, it says. But the capital's electricity requirements are expected to grow by between 200 and 600 percent in future, calling for long-term strategic planning to avoid further constraints or delays.

The matter has a degree of urgency because the UK, like other nations, is seeing a surge in datacenter construction thanks to the current AI development craze. The British government unveiled its AI Opportunities Action Plan at the start of this year, with measures designed to get more bit barns built, and many of these will inevitably pop up near London.

For example, Equinix is to build a large campus near London's M25 orbital motorway at South Mimms, while Google recently opened a facility near the M25 at Waltham Cross, and there are other projects at Abbots Langley, East Havering, and Woodlands Park, near Iver in Buckinghamshire, also near the M25.

The power required by AI-focused datacenters is growing, sometimes equivalent to tens of thousands of homes or even more. In the US, plans for 5 GW facilities are already in the pipeline, which would draw as much power as millions of homes.

The report, Gridlocked: how planning can ease London's electricity constraints, suggests a number of policy reforms to tackle the issue, including that the government should introduce a separate use class for datacenters, enabling their energy demands to be planned for in a clearer and more coordinated way.

Currently, such facilities are often laughably included in Use Class B8 (storage and distribution) because they are viewed as functioning like warehouses.

Other recommendations are that the GLA and London councils should have places on the London Regional Energy Strategic Plan board, and that all boroughs should complete a Local Area Energy Plan to inform requirements.

The GLA should also include a datacenter policy in its next London Plan to enable a more strategic approach to their development, and this should include energy demand assessments for large energy users such as bit barns.

"If there is to be just one takeaway from this investigation it must be this: grid capacity cannot be an afterthought," wrote James Small-Edwards, chair of the Planning and Regeneration Committee, in the report's foreword.

"We need a proactive, coordinated approach that ensures energy networks are anticipating heightened demand; that local plans integrate energy considerations; and that major energy users are managed strategically." ®