























We consider the problem of reconfiguring a two-dimensional connected grid arrangement of passive building blocks from a start configuration to a goal configuration, using a single active robot that can move on the tiles, remove individual tiles from a given location and physically move them to a new position by walking on the remaining configuration. The objective is to determine a schedule that minimizes the overall makespan, while keeping the tile configuration connected. We provide both negative and positive results. (1) We generalize the problem by introducing weighted movement costs, which can vary depending on whether tiles are carried or not, and prove that this variant is NP-hard. (2) We give a polynomial-time constant-factor approximation algorithm for the case of disjoint start and target bounding boxes, which additionally yields optimal carry distance for 2-scaled instances.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。