



















This report contains the description of two novel job shop scheduling benchmarks that resemble instances of real scheduling problem as they appear in industry. In particular, the aim was to provide large-scale benchmarks (up to 1 million operations) to test the state-of-the-art scheduling solutions on problems that are closer to what occurs in a real industrial context. The first benchmark is an extension of the well known Taillard benchmark (1992), while the second is a collection of scheduling instances with a known-optimum solution.
此内容由惯性聚合(RSS阅读器)自动聚合整理,仅供阅读参考。 原文来自 — 版权归原作者所有。